ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

TOM Tomco Energy Plc

0.0275
0.00 (0.00%)
25 Jul 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Tomco Energy Plc LSE:TOM London Ordinary Share IM00BZBXMN96 ORD NPV
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.0275 - 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Drilling Oil And Gas Wells 0 -2.35M -0.0006 -0.50 1.07M
Tomco Energy Plc is listed in the Drilling Oil And Gas Wells sector of the London Stock Exchange with ticker TOM. The last closing price for Tomco Energy was 0.03p. Over the last year, Tomco Energy shares have traded in a share price range of 0.0275p to 0.13p.

Tomco Energy currently has 3,904,135,277 shares in issue. The market capitalisation of Tomco Energy is £1.07 million. Tomco Energy has a price to earnings ratio (PE ratio) of -0.50.

Tomco Energy Share Discussion Threads

Showing 45501 to 45524 of 56575 messages
Chat Pages: Latest  1831  1830  1829  1828  1827  1826  1825  1824  1823  1822  1821  1820  Older
DateSubjectAuthorDiscuss
13/1/2022
08:20
So that is around $96.50 a barrel for bunker at this time
vauch
13/1/2022
08:19
Sadly a load of waffle - JP and the Board know it. What next?
lopodop
13/1/2022
08:06
https://shipandbunker.com/prices
talais
13/1/2022
07:58
Talais but what price is low sulphur bunker fuel?
vauch
13/1/2022
07:55
Are the 3 well drill funded buy another party. or is it funded by Tom
vauch
13/1/2022
07:52
Once QFI change it to Msar the price will be a lot more
talais
13/1/2022
07:49
Estimated on $62 The Report was prepared using oil and marketable sand price parameters specified by TomCo. The future oil produced and processed through mining operations is assumed to yield three distinct products including asphalt, heavy oil, and diesel. The asphalt price is based on the Argus Asphalt Index price of US$93.64. Heavy oil and diesel prices are based on the 1 December 2021, West Texas Intermediate posted price of US$62.05 and are adjusted for quality and market differentials. Sand produced through mining operations is assumed to be processed and sold as four distinct products (industrial, construction, frac and silica sands). Sand prices are based on the 2019 United States Geological Survey prices for each product.
talais
13/1/2022
07:36
Hi Hot .. Thanks.
ducky fuzz
13/1/2022
07:34
Welcome back Ducky.
hotfinance14
13/1/2022
07:33
Start drip feeding in positive news here and the share price should re rate
jaynealex
13/1/2022
07:33
Hi all. Interesting update. Wonder what the share price will do today. DF
ducky fuzz
13/1/2022
07:31
Based on the 100% ownership figure for reserves , the report makes a nonsense of the current SP

And yes funding should be alot easier

jaynealex
13/1/2022
07:25
Just to clarify the $150m again for those that forget and any denyers

The fantasy plant estimate at $110m +/- 25%
We all know that construction estimates always are presented on the low end
So $137.5m
Add in +7% for 2 years (almost 1 year gone already)
and you have $157m...
For a one man band to fund , with no source of cash funding of their own....

Roll up , Roll up , who wants to fund my asteroid mining ?

fenners66
13/1/2022
07:19
Why also split out a 10% amount ?

Is that prepping the market to understand they are never going to have the cash to buy the massively overpriced 90%?

Remember the land next door was bought already with exploration done for a fraction.

fenners66
13/1/2022
07:17
Desperate repackaging of "probables"

What , more importantly was not addressed was when drilling dirty oil tests will start/ why the delays ?

So ignoring reality and concentrating on a future fantasy - after all there is no source of funding $150m plant.

I could potentially identify an asteroid stuffed full of diamonds - but without the cash it stays where it is.

fenners66
13/1/2022
07:16
You would have thought. but what is the bit about getting funding for the drilling.
I thought the 3 drill program was sorted?

vauch
13/1/2022
07:16
Still no RNS on the permits.

The RNS is on the reserves, should the trial plant have the capacity to be scaled up ("potential commercial scale project").

In my view I do not know why they bother if they have secured a 'bang to rights' oil field. The trouble with oil fields is that they need to be explored and drilled and that requires permits.

the diddymen
13/1/2022
07:12
Great RNS this morning
wapper
13/1/2022
07:11
Good report, at least there are some numbers now to base investment on. Funding should be a lot easier.
pooler1
12/1/2022
09:30
Volume up. Someone selling in on any purchases.
the diddymen
12/1/2022
08:52
Volume up today,!!
talais
12/1/2022
07:31
Other thread predictably quiet.
the diddymen
11/1/2022
20:45
The other thread thinks this one man band is only there to manage the share price....

Clue.
It's a one man band.
I know they don't have any current projects to manage either , but the point in any quoted business is to manage the business , the share price is only a reflection of supply and demand.

If they had a business to get in good shape the longer term share price takes care of itself.

Share price up on narrative , down without narrative - counts for nothing only a tangible business would change it.

fenners66
11/1/2022
20:29
Well I hope that he is busy because if he isn't, nothing is happening!
the diddymen
Chat Pages: Latest  1831  1830  1829  1828  1827  1826  1825  1824  1823  1822  1821  1820  Older

Your Recent History

Delayed Upgrade Clock