ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

CMCL Caledonia Mining Corporation Plc

815.00
0.00 (0.00%)
Last Updated: 08:00:00
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Caledonia Mining Corporation Plc LSE:CMCL London Ordinary Share JE00BF0XVB15 COM SHS NPV (DI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 815.00 790.00 840.00 815.00 815.00 815.00 1 08:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Gold Ores 138.94M -4.2M -0.2188 -45.48 190.94M

Caledonia Mining Corporation PLC Resource Update at the Blanket Mine, Zimbabwe (4453F)

28/07/2016 7:00am

UK Regulatory


Caledonia Mining (LSE:CMCL)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Caledonia Mining Charts.

TIDMCMCL

RNS Number : 4453F

Caledonia Mining Corporation PLC

28 July 2016

Caledonia Mining Corporation Plc

Resource Update at the Blanket Mine, Zimbabwe

(TSX: CAL, OTCQX: CALVF, AIM: CMCL)

St Helier, July 28, 2016. Caledonia Mining Corporation Plc ("Caledonia" or the "Company") is pleased to announce an increase and upgrade to the resource base at its 49% owned subsidiary, the Blanket Mine in Zimbabwe.

Based on the diamond core drilling that has been done at depth below the Blanket Section over the past half year, 343,000 tonnes have been upgraded from the Inferred to the Indicated Resource category and an additional 1,276,000 tonnes of new inventory has been added to Inferred Resources.

This upgraded Indicated Resource of 343,000 tonnes, combined with the resources upgraded during 2015, have increased the quantum of reserves and indicated resources that may be used in the life of mine plan from 2,934,000 tonnes used for the Technical Report prepared by Minxcon in December 2014, to 4,889,000 tonnes currently and represents an increase of 67% per cent in terms of mineable tonnes and hence in the life of the mine.

 
  Blanket Section Indicated Resources upgraded from Inferred 
   Resources 
---------------------------------------------------------------------------- 
  Orebody            In situ Tonnes    Ave Width    Grade (g/t)    Gold (oz) 
                                          (m) 
-----------------  ----------------  -----------  -------------  ----------- 
  Blanket Quartz 
   Reef                  60,200          3.82          6.72            6,400 
-----------------  ----------------  -----------  -------------  ----------- 
  No. 1 Orebody          51,900          6.07          5.52            6,600 
                   ----------------  -----------  -------------  ----------- 
  No. 2 Orebody         150,700          4.28          4.24           25,300 
-----------------  ----------------  -----------  -------------  ----------- 
  2 Leader Reef          80,600          3.85          3.15            9,400 
-----------------  ----------------  -----------  -------------  ----------- 
  No. 4 Orebody            -               -             -                 - 
-----------------  ----------------  -----------  -------------  ----------- 
  TOTAL                 343,400          4.40          5.19           47,700 
-----------------  ----------------  -----------  -------------  ----------- 
 
 
  Blanket Section New Inferred Resources 
---------------------------------------------------------------------------- 
  Orebody            In situ Tonnes    Ave Width    Grade (g/t)    Gold (oz) 
                                          (m) 
-----------------  ----------------  -----------  -------------  ----------- 
  Blanket Quartz 
   Reef                 611,000          3.82          5.80          103,000 
-----------------  ----------------  -----------  -------------  ----------- 
  No. 1 Orebody         326,000          6.07          5.58           50,000 
                   ----------------  -----------  -------------  ----------- 
  No. 2 Orebody         281,000          4.28          3.70           35,000 
-----------------  ----------------  -----------  -------------  ----------- 
  No. 4 Orebody          58,000          3.65          4.80           14,000 
-----------------  ----------------  -----------  -------------  ----------- 
  TOTAL                1,276,000         4.47          5.00          202,000 
-----------------  ----------------  -----------  -------------  ----------- 
 

The additional inferred resources in the Blanket section doubles the quantum previously estimated from this section of the mine.

After the update announced today, Blanket Mine's resources have increased both in terms of Indicated Resources and Inferred Resources; see new totals in the following table. The decline in Measured Resources is due to the production depletion for the first half year and will be recomputed at the end of the year.

 
 Blanket Total Resources 
---------------------------------------------------------------- 
 Mineral Resource        Tonnes     Grade (g/t)   Contained Gold 
  Category                                                  (oz) 
---------------------  ----------  ------------  --------------- 
 Measured Resources     1,177,079      4.01              151,657 
---------------------  ----------  ------------  --------------- 
 Indicated Resources    3,677,828      4.31              509,222 
---------------------  ----------  ------------  --------------- 
 Total M&I              4,854,907      4.23              660,879 
---------------------  ----------  ------------  --------------- 
 Inferred Resources     3,862,991      5.01              622,613 
---------------------  ----------  ------------  --------------- 
 

All resources for Blanket are shown on a 100% basis, Caledonia owns 49% of Blanket

Commenting on the resource upgrade, Steve Curtis, Caledonia's President and Chief Executive Officer said:

"This upgrade reflects the ongoing focus on resource development at Blanket mine. It should be noted that the upgrades are only in the Blanket section of the mine and that further resource upgrades in the AR South, AR Main and Eroica sections will be released in the second half of the year.

"The upgrade of approximately 343,000 tonnes from Inferred Resource to Indicated Resource underscores the overall confidence level of Blanket's resources. The significant increase in new Inferred Resources occurred at depth and paves the way for the phase 2 expansion program to extend mining below the current target depth of 990 m Level.

"I am confident that the life of mine will be further supplemented by resource additions and upgrades as a result of the increased exploration activity, both at Blanket and also at the satellite projects."

About Caledonia Mining

Following the implementation of indigenisation in Zimbabwe, Caledonia's primary asset is a 49 per cent interest in an operating gold mine in Zimbabwe ("Blanket"). Caledonia's shares are listed in Canada on the Toronto Stock Exchange as "CAL", on London's AIM as "CMCL" and are also traded on the American OTCQX as "CALVF".

At 31 March 2016, Caledonia had net cash of US $8.8 million. Blanket plans to increase production from 42,800 ounces in 2015 to approximately 80,000 ounces in 2021; Blanket's target production for 2016 is approximately 50,000 ounces. Caledonia expects to publish its results for the quarter to 30 June 2016 on 11 August 2016.

For further information please contact:

 
 Caledonia Mining Corporation 
  Plc                                   Tel: +44 1534 702 998 or 
  Mark Learmonth                        +27 11 447 2499 
  Maurice Mason                         Tel: +44 759 078 1139 
 WH Ireland                           Tel: +44 20 7220 1751 
  Adrian Hadden/Nick Prowting 
 Blytheweigh                          Tel: +44 207 138 3204 
  Tim Blythe/Camilla Horsfall/Megan 
  Ray 
 

This information is provided by RNS

The company news service from the London Stock Exchange

END

DRLQDLFLQDFLBBV

(END) Dow Jones Newswires

July 28, 2016 02:00 ET (06:00 GMT)

1 Year Caledonia Mining Chart

1 Year Caledonia Mining Chart

1 Month Caledonia Mining Chart

1 Month Caledonia Mining Chart

Your Recent History

Delayed Upgrade Clock