ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

BHP Bhp Group Limited

2,298.00
27.00 (1.19%)
Last Updated: 16:00:04
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Bhp Group Limited LSE:BHP London Ordinary Share AU000000BHP4 ORD NPV (DI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  27.00 1.19% 2,298.00 2,297.00 2,299.00 2,306.00 2,272.00 2,274.00 913,517 16:00:04
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Crude Petroleum & Natural Gs 54.19B 12.92B 2.5513 16.83 217.42B

BHP Billiton PLC Operational Review-Quarter Ended 30 September 2013 (0350R)

22/10/2013 7:00am

UK Regulatory


Bhp (LSE:BHP)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Bhp Charts.

TIDMBLT

RNS Number : 0350R

BHP Billiton PLC

21 October 2013

 
 NEWS RELEASE 
 Release Time    IMMEDIATE 
 Date            22 October 2013 
 Number          24/13 
 

BHP BILLITON OPERATIONAL REVIEW FOR THE QUARTER ENDED 30 SEPTEMBER 2013

-- BHP Billiton maintained strong momentum in the September 2013 quarter as production increased by 11% (i) from the prior corresponding period. Optimisation of the Western Australia Iron Ore (WAIO) supply chain continues to unlock substantial value with 2014 financial year production guidance raised to 212 million tonnes (100% basis). Full year production guidance is maintained for Petroleum, Copper and Coal.

-- Total petroleum production for the September 2013 quarter was a record 62.7 million barrels of oil equivalent. A 16% increase in liquids production was underpinned by significant growth in Onshore US volumes, primarily in the Black Hawk, and the start-up of a new production well at Atlantis. An additional Atlantis production well is scheduled for completion in the second half of the 2014 financial year.

-- Queensland Coal continued to benefit from its focus on productivity as it sustained an annualised production rate of 61 million tonnes (100% basis) in the September 2013 quarter.

-- Four major projects delivered first production, including the WAIO Jimblebar Mine Expansion where first production was achieved approximately six months ahead of the original schedule. All other projects are tracking to plan.

-- Our ability to simplify our portfolio and focus on our diversified pillars of Petroleum, Copper, Iron Ore and Coal remains an important point of differentiation. Since the beginning of the 2013 financial year the Group has completed major transactions totalling US$6.5 billion, which includes US$2.2 billion received in the financial year to date.

BHP Billiton Chief Executive Officer, Andrew Mackenzie, said: "Our pursuit of productivity gains and operating excellence is already yielding strong results. There is no better example than in our Iron Ore business, where the deployment of mobile crushing units and the continued debottlenecking of the supply chain has underpinned a five million tonne increase in Western Australia Iron Ore's production guidance for the 2014 financial year.

"We continue to build on the substantial US$2.7 billion reduction in controllable cash costs delivered in the 2013 financial year with strong momentum maintained in the first quarter. In addition, a 25 per cent reduction in capital and exploration expenditure to US$16 billion (ii) in the 2014 financial year has significantly increased internal competition for capital. Our rate of expenditure will decline again next year and our investment criteria cannot be met in any one project, product or geography, we will redirect our capital elsewhere or we will not invest.

"Active management of our portfolio has also delivered significant value for our shareholders. In this financial year completed transactions have already delivered proceeds of US$2.2 billion, further strengthening our solid A balance sheet. With strong production growth and our overriding commitment to substantially increase free cash flow, we are well positioned to grow returns to our shareholders."

(i) Refers to copper equivalent production based on average realised product prices for the 2013 financial year.

(ii) Capital and exploration expenditure guidance excludes deferred stripping and refers to BHP Billiton's equity interest.

Note: Unless specified otherwise: variance analysis relates to the relative performance of BHP Billiton and/or its operations during the September 2013 quarter compared with the September 2012 quarter; all references to production and capital expenditure are BHP Billiton share and reflect the adoption of the new accounting standard (IFRS 10); and all references to project capacity are 100 per cent.

Summary

 
                                             SEP    SEP Q13    SEP Q13 
                                            2013         vs         vs 
Production summary                           QTR    SEP Q12    JUN Q13 
---------------------------------------  -------  ---------  --------- 
Total petroleum products (million boe)      62.7         2%         6% 
---------------------------------------  -------  ---------  --------- 
Copper ('000 tonnes)                       403.3         6%       -13% 
---------------------------------------  -------  ---------  --------- 
Iron ore ('000 tonnes)                    48,848        23%         2% 
---------------------------------------  -------  ---------  --------- 
Metallurgical coal ('000 tonnes)          10,185        14%        -6% 
---------------------------------------  -------  ---------  --------- 
Energy coal ('000 tonnes)                 19,639         3%         6% 
---------------------------------------  -------  ---------  --------- 
Alumina ('000 tonnes)                      1,251         7%        -1% 
---------------------------------------  -------  ---------  --------- 
Aluminium ('000 tonnes)                      310        15%         0% 
---------------------------------------  -------  ---------  --------- 
Manganese ore ('000 tonnes)                2,046        -5%        -9% 
---------------------------------------  -------  ---------  --------- 
Manganese alloy ('000 tonnes)                137         5%       -25% 
---------------------------------------  -------  ---------  --------- 
Nickel ('000 tonnes)                        40.4         9%         0% 
---------------------------------------  -------  ---------  --------- 
 

BHP Billiton maintained strong momentum in the September 2013 quarter as production increased by 11 per cent from the prior corresponding period. Optimisation of the WAIO supply chain continues to unlock substantial value with 2014 financial year production guidance raised to 212 million tonnes (100 per cent basis). Full year production guidance is maintained for Petroleum, Copper and Coal.

Our WAIO business achieved another major milestone during the quarter with first production delivered from the Jimblebar Mine Expansion, six months ahead of its original schedule. The ramp up of phase one capacity to 35 million tonnes per annum (mtpa) is expected to be completed by the end of the 2015 financial year. Together with the recent installation of four mobile crushers, this will increase total WAIO supply chain capacity to in excess of 220 mtpa (100 per cent basis). Longer term, a low cost option to expand Jimblebar to 55 mtpa and the broader debottlenecking of the supply chain is expected to underpin capital efficient growth in capacity to approximately 260 mtpa to 270 mtpa (100 per cent basis).

First production was also achieved at Macedon, Bass Strait Turrum and North West Shelf North Rankin B Gas Compression (all Australia). In addition, the Newcastle Third Port Stage 3 project (Australia) achieved mechanical completion. These projects will not be reported in future quarterly reports. The remaining 12 major projects are tracking to plan.

During the September 2013 quarter, BHP Billiton announced an investment of US$3.4 billion (100 per cent basis) to construct a desalination facility which will deliver sustainable water supply to Escondida (Chile) over the long term. In addition, BHP Billiton announced it is investing US$2.6 billion to finish the excavation and lining of the Jansen Potash project (Canada) production and service shafts, and to continue the installation of essential surface infrastructure and utilities. Completion of both shafts is expected during the 2016 calendar year, while the associated works program will extend into the 2017 calendar year.

BHP Billiton's active program of portfolio simplification has delivered proceeds of US$2.2 billion since the commencement of the 2014 financial year with the completion of the Jimblebar (Australia) and Pinto Valley (US) transactions. In addition, the Group priced a four tranche, US$5.0 billion Global Bond during the September 2013 quarter. The proceeds will be used for general corporate purposes.

The new International Financial Reporting Standard (IFRS) 10 came into effect from 1 July 2013. The application of this accounting standard requires the full consolidation of Escondida, as compared to the proportional consolidation of our 57.5 per cent equity interest which has been applied historically. This report has been prepared on the basis of this new accounting standard and references to BHP Billiton share now include 100 per cent of Escondida. As a consequence, BHP Billiton's copper production guidance for the 2014 financial year now refers to 1.7 million tonnes, although the Group's equity interest remains unchanged at 1.2 million tonnes.

Petroleum and Potash

Production

 
                                                              SEP    SEP Q13    SEP Q13 
                                                             2013         vs         vs 
                                                              QTR    SEP Q12    JUN Q13 
---------------------------------------------------------  ------  ---------  --------- 
Crude oil, condensate and natural gas liquids ('000 boe)   26,053        16%        11% 
---------------------------------------------------------  ------  ---------  --------- 
Natural gas (bcf)                                          219.66        -6%         2% 
---------------------------------------------------------  ------  ---------  --------- 
Total petroleum products (million boe)                       62.7         2%         6% 
---------------------------------------------------------  ------  ---------  --------- 
 

Total petroleum production - Total petroleum production for the September 2013 quarter was a record 62.7 million barrels of oil equivalent (BHP Billiton share). Guidance for the 2014 financial year remains unchanged at 250 million barrels of oil equivalent (BHP Billiton share).

Crude oil, condensate and natural gas liquids - A 16 per cent increase in liquids production in the September 2013 quarter was underpinned by significant growth in Onshore US volumes, primarily in the Black Hawk, and the start-up of a new production well at Atlantis (US). An additional Atlantis production well is scheduled for completion in the second half of the 2014 financial year. A significant increase in the number of producing wells in the liquids rich Eagle Ford contributed to a 29 per cent increase in Onshore US liquids production from the June 2013 quarter.

Planned maintenance and new well tie-ins at Pyrenees (Australia) are expected to impact conventional liquids production during the December 2013 quarter with the floating production storage and off-take (FPSO) facility offline for approximately one month. These additional production wells will mitigate natural field decline in the second half of the 2014 financial year.

Natural gas - Natural gas production declined by six per cent in the September 2013 quarter. The successful delivery of first gas from the Macedon project in August 2013 only partially offset softer seasonal demand at Bass Strait and lower production at Haynesville (US), following our deliberate decision to prioritise Onshore US development drilling in the liquids rich Black Hawk region of the Eagle Ford.

Projects

 
                                    Initial 
                       Capital      production 
                       expenditure  target 
Project and ownership  (US$m)       date        Capacity                                Progress 
---------------------  -----------  ----------  --------------------------------------  ------------------------------------------------------------------------------ 
Macedon (Australia)          1,050        CY13  200 million cubic feet of gas per day.  First gas sales achieved in August 2013. The overall project is 100% complete. 
  71.43% (operator) 
---------------------  -----------  ----------  --------------------------------------  ------------------------------------------------------------------------------ 
Bass Strait Turrum           1,350  CY13 (iii)  11,000 barrels of condensate per day    On revised schedule and budget for remaining scope. First gas achieved in June 
(Australia)                                     and processing capacity of 200 million  2013. The overall 
50% (non-operator)                              cubic feet of                           project is 91% complete. 
                                                gas per day. 
---------------------  -----------  ----------  --------------------------------------  ------------------------------------------------------------------------------ 
North West Shelf               850        CY13  2,500 million cubic feet of gas per     On budget. First production achieved in early October 2013. The overall 
North Rankin B Gas                              day.                                    project is 99% complete. 
Compression 
(Australia) 
16.67% (non-operator) 
---------------------  -----------  ----------  --------------------------------------  ------------------------------------------------------------------------------ 
North West Shelf               400        CY16  To maintain LNG plant throughput from   On schedule and budget. The overall project is 60% complete. 
Greater Western                                 the North West Shelf operations. 
Flank-A (Australia) 
16.67% (non-operator) 
---------------------  -----------  ----------  --------------------------------------  ------------------------------------------------------------------------------ 
Bass Strait Longford           520        CY16  Designed to process approximately 400   On schedule and budget. The overall project is 20% complete. 
Gas Conditioning                                million cubic feet per day of high CO2 
Plant (Australia)                               gas. 
50% (non-operator) 
---------------------  -----------  ----------  --------------------------------------  ------------------------------------------------------------------------------ 
 

(iii) Initial production through the Turrum facilities is low CO2 gas. Additional high CO2 gas production from the Turrum reservoir will come online with completion of the Longford Gas Conditioning Plant in the 2016 calendar year.

Onshore US drilling and development expenditure totalled US$1.3 billion in the September 2013 quarter. The Company's rig count declined from 40 to 27 during the period which will result in lower expenditure in subsequent quarters. Approximately 75 per cent of drilling activity occurred in the Eagle Ford, with the majority focused on our liquids rich Black Hawk acreage. The optimisation of our dry gas program and the associated termination of rig contracts is expected to result in a charge of approximately US$100 million in the 2014 financial year, with the large majority to be booked in the first half. Guidance for Onshore US drilling and development expenditure remains unchanged at US$3.9 billion for the 2014 financial year.

Petroleum exploration

Exploration and appraisal wells drilled during the quarter or in the process of drilling as at 30 September 2013.

 
 Well           Location        BHP Billiton equity   Status 
-------------  --------------  --------------------  ------------------------- 
Raptor-1/ST-1  Gulf of Mexico  50%                   Plugged and abandoned 
                DC535           (Anadarko operator)   Hydrocarbons encountered 
-------------  --------------  --------------------  ------------------------- 
Sake           Gulf of Mexico  60%                   Plugged and abandoned 
                DC726           (Operator)            Dry hole 
-------------  --------------  --------------------  ------------------------- 
 

Petroleum exploration expenditure for the September 2013 quarter was US$205 million, of which US$64 million was expensed. A US$600 million exploration program, largely focused on the Gulf of Mexico (US) and Western Australia, is planned for the 2014 financial year.

Potash

 
                         Investment 
 Project and ownership       (US$m)   Scope                                                                                 Progress 
----------------------  -----------  ------------------------------------------------------------------------------------  --------------------------------------- 
Jansen Potash (Canada)        2,600  Investment to finish the excavation and lining of the production and service shafts,  Approval announced. See news release da 
                                      and to                                                                               ted 20 August 2013. 
                                     continue the installation of essential surface infrastructure and utilities. 
  100% 
----------------------  -----------  ------------------------------------------------------------------------------------  --------------------------------------- 
 

Copper

Production

 
                                                  SEP    SEP Q13    SEP Q13 
                                                 2013         vs         vs 
                                                  QTR    SEP Q12    JUN Q13 
---------------------------------------------  ------  ---------  --------- 
Copper ('000 tonnes)                            403.3         6%       -13% 
---------------------------------------------  ------  ---------  --------- 
Lead (tonnes)                                  46,445       -11%       -31% 
---------------------------------------------  ------  ---------  --------- 
Zinc (tonnes)                                  28,555        10%       -38% 
---------------------------------------------  ------  ---------  --------- 
Silver ('000 ounces)                            8,688        -8%       -25% 
---------------------------------------------  ------  ---------  --------- 
Uranium oxide concentrate (Uranium) (tonnes)      970        -6%       -12% 
---------------------------------------------  ------  ---------  --------- 
 

Copper - Copper production increased by six per cent in the September 2013 quarter to 403 thousand tonnes (BHP Billiton share). The application of IFRS 10 requires the full consolidation of Escondida, as compared to the proportional consolidation of our 57.5 per cent equity interest which has been applied historically. This report has been prepared on the basis of this new accounting standard and references to BHP Billiton share now include 100 per cent of Escondida. As a consequence, BHP Billiton's copper production guidance for the 2014 financial year now refers to 1.7 million tonnes, although the Group's equity interest remains unchanged at 1.2 million tonnes.

Escondida copper production increased by 12 per cent in the September 2013 quarter to 278 thousand tonnes (100 per cent basis) as milling rates improved. An eight per cent reduction from the June 2013 quarter, however, reflected planned maintenance, industrial action and lower copper ore grades, consistent with the mine plan. Escondida remains on track to produce approximately 1.1 million tonnes (100 per cent basis) of copper in the 2014 financial year before increasing to approximately 1.3 million tonnes (100 per cent basis) in the 2015 financial year.

As anticipated, Pampa Norte (Chile) copper production declined by 33 per cent from the June 2013 quarter primarily as a result of lower ore grades and recoveries at Spence. Production at Spence is expected to recover strongly in the second half of the 2014 financial year.

Antamina (Peru) achieved record copper production in the September 2013 quarter which reflected continued strong mill throughput and higher ore grades as mining progressed through a copper rich ore zone. Copper production at Antamina will be affected by lower ore grades in the second half of the 2014 financial year, consistent with the mine plan.

Olympic Dam (Australia) copper production was affected by smelter reliability issues during the September 2013 quarter. A maintenance outage scheduled for the March 2014 quarter will address smelter performance. Copper production at Olympic Dam for the 2014 financial year is expected to be in line with the prior year.

On 11 October 2013, BHP Billiton completed the sale of its Pinto Valley (US) mining operation and the associated San Manuel Arizona Railroad Company to Capstone Mining Corp. for US$650 million, subject to customary working capital adjustments.

Lead/silver - Lead and silver production decreased by 31 per cent and 25 per cent, respectively, from the June 2013 quarter as lower average ore grades affected performance at Cannington (Australia).

Zinc - Zinc production decreased by 38 per cent from the June 2013 quarter, driven by lower average zinc ore grades at Cannington and Antamina.

Uranium - Uranium production decreased by 12 per cent from the June 2013 quarter as a result of lower average uranium ore grades and planned maintenance at Olympic Dam.

Projects

 
                                                         Initial 
                                            Capital      production 
                                            expenditure  target 
Project and ownership                       (US$m)       date        Capacity                                                                          Progress 
------------------------------------------  -----------  ----------  --------------------------------------------------------------------------------  ------------------------------------- 
Escondida Oxide Leach Area Project (Chile)     721 (iv)     H1 CY14  New dynamic leaching pad and mineral handling system. Maintains oxide leaching c  On schedule and budget. The overall p 
                                                                     apacity.                                                                          roject is 76% complete. 
  57.5% 
------------------------------------------  -----------  ----------  --------------------------------------------------------------------------------  ------------------------------------- 
Escondida Organic Growth Project 1 (Chile)   3,838 (iv)     H1 CY15  Replaces the Los Colorados concentrator with a new 152,000 tonnes per day plant.  On schedule and budget. The overall p 
                                                                                                                                                       roject is 51% complete. 
  57.5% 
------------------------------------------  -----------  ----------  --------------------------------------------------------------------------------  ------------------------------------- 
Escondida Water Supply (Chile)               3,430 (iv)        CY17  New desalination facility to ensure continued water supply to Escondida.          Approval announced. See news release 
                                                                                                                                                       dated 25 July 2013. 
  57.5% 
------------------------------------------  -----------  ----------  --------------------------------------------------------------------------------  ------------------------------------- 
 

(iv) Following the application of IFRS 10 from 1 July 2013, references to BHP Billiton share include 100 per cent of Escondida.

Iron Ore

Production

 
                            SEP    SEP Q13    SEP Q13 
                           2013         vs         vs 
                            QTR    SEP Q12    JUN Q13 
-----------------------  ------  ---------  --------- 
Iron ore ('000 tonnes)   48,848        23%         2% 
-----------------------  ------  ---------  --------- 
 

Iron ore- Iron ore production increased by 23 per cent in the September 2013 quarter to 49 million tonnes (BHP Billiton share).

WAIO achieved record production of 54 million tonnes (100 per cent basis) for the September 2013 quarter. Continued strong operating performance across the supply chain and the successful delivery of first production from the Jimblebar mine, ahead of schedule, contributed to the record result. The ramp up of phase one capacity at Jimblebar to 35 mtpa is expected to be completed by the end of the 2015 financial year.

The optimisation of the supply chain in the Pilbara continues to unlock substantial value and WAIO is now expected to produce 212 million tonnes (100 per cent basis) in the 2014 financial year, a five million tonne increase on prior guidance. Longer term, a low cost option to expand Jimblebar to 55 mtpa and the broader debottlenecking of the supply chain is expected to underpin further capital efficient growth in capacity to approximately 260 mtpa to 270 mtpa (100 per cent basis).

Samarco's (Brazil) three pellet plants continued to operate at capacity during the period.

Total iron ore production for the 2014 financial year, which includes Samarco, is now expected to increase to 192 million tonnes (BHP Billiton share).

Projects

 
                                                        Initial 
                                           Capital      production 
                                           expenditure  target 
Project and ownership                      (US$m)       date        Capacity                                                                                                  Progress 
-----------------------------------------  -----------  ----------  --------------------------------------------------------------------------------------------------------  ------------------------------------------------------------------------------ 
WAIO Jimblebar Mine Expansion (Australia)    3,220 (v)     Q4 CY13  Increases mining and processing capacity to 35 million tonnes per annum with incremental debottlenecking  First production achieved in Q3 CY13, ahead of schedule and on revised budget. 
                                                                     opportunities to 55 million tonnes per annum.                                                             The overall 
                                                                                                                                                                              project is 96% complete. 
  85% 
-----------------------------------------  -----------  ----------  --------------------------------------------------------------------------------------------------------  ------------------------------------------------------------------------------ 
WAIO Port Blending and Rail Yard             1,000 (v)     H2 CY14  Optimises resource and enhances efficiency across the WAIO supply chain.                                  On schedule and budget on the basis of the revised scope. The overall project 
Facilities (Australia)                                                                                                                                                        is 93% complete. 
85% 
-----------------------------------------  -----------  ----------  --------------------------------------------------------------------------------------------------------  ------------------------------------------------------------------------------ 
Samarco Fourth Pellet Plant (Brazil)             1,750     H1 CY14  Increases iron ore pellet production capacity by 8.3 million tonnes per annum to 30.5 million             On schedule and budget. The overall project is 95% complete. 
                                                                     tonnes per annum. 
  50% 
-----------------------------------------  -----------  ----------  --------------------------------------------------------------------------------------------------------  ------------------------------------------------------------------------------ 
 

(v) Excludes announced pre-commitment funding.

Coal

Production

 
                                      SEP    SEP Q13    SEP Q13 
                                     2013         vs         vs 
                                      QTR    SEP Q12    JUN Q13 
---------------------------------  ------  ---------  --------- 
Metallurgical coal ('000 tonnes)   10,185        14%        -6% 
---------------------------------  ------  ---------  --------- 
Energy coal ('000 tonnes)          19,639         3%         6% 
---------------------------------  ------  ---------  --------- 
 

Metallurgical coal - Metallurgical coal production increased by 14 per cent in the September 2013 quarter to 10 million tonnes (BHP Billiton share).

Queensland Coal (Australia) continued to run at full supply chain capacity during the period with annualised production of 61 million tonnes (100 per cent basis). This strong result was underpinned by the continued ramp up of Daunia, record quarterly production at South Walker Creek and improved Coal Preparation Plant performance at Blackwater and Saraji. This was partially offset by a planned longwall move at Crinum and scheduled Coal Preparation Plant maintenance at Goonyella Riverside and Peak Downs.

Illawarra Coal (Australia) production decreased by 39 per cent from the June 2013 quarter and reflected an extended outage at Dendrobium and a scheduled longwall move at West Cliff. Despite a roof fall at Dendrobium in October 2013, production is expected to improve in the December 2013 quarter, with total Illawarra Coal production weighted towards the second half of the 2014 financial year.

Total metallurgical coal production guidance for the 2014 financial year remains unchanged at 41 million tonnes (BHP Billiton share).

Energy coal - Energy coal production increased by three per cent in the September 2013 quarter to 20 million tonnes (BHP Billiton share). Record quarterly production at both New South Wales Energy Coal (Australia) and Cerrejon Coal (Colombia) contributed to the strong result.

Total energy coal production guidance for the 2014 financial year remains unchanged at 73 million tonnes (BHP Billiton share).

Projects

 
                                                          Initial 
                                             Capital      production 
                                             expenditure  target 
Project and ownership                        (US$m)       date        Capacity                                                                                                Progress 
-------------------------------------------  -----------  ----------  ------------------------------------------------------------------------------------------------------  ------------------------------------- 
Cerrejon P40 Project (Colombia)                      437        CY13  Increases saleable thermal coal production by 8 million tonnes per annum to approximately               On schedule and budget. The overall p 
                                                                       40 million tonnes per annum.                                                                           roject is 79% complete. 
  33.3% 
-------------------------------------------  -----------  ----------  ------------------------------------------------------------------------------------------------------  ------------------------------------- 
Newcastle Third Port Project Stage 3                 367        CY14  Increases total coal terminal capacity from 53 million tonnes per annum to 66 million tonnes            First coal was loaded in Q2 CY13 and 
(Australia)                                                            per annum.                                                                                             mechanical completion was achieved in 
35.5%                                                                                                                                                                         Q3 CY13, ahead 
                                                                                                                                                                              of schedule and on budget. The 
                                                                                                                                                                              overall project is 76% complete. 
-------------------------------------------  -----------  ----------  ------------------------------------------------------------------------------------------------------  ------------------------------------- 
Caval Ridge (Australia)                       1,870 (vi)        CY14  Greenfield mine development to produce an initial 5.5 million tonnes per annum of export metallurgical  On schedule and budget. The overall p 
                                                                       coal.                                                                                                  roject is 86% complete. 
  50% 
-------------------------------------------  -----------  ----------  ------------------------------------------------------------------------------------------------------  ------------------------------------- 
Hay Point Stage Three Expansion (Australia)   1,505 (vi)        CY15  Increases port capacity from 44 million tonnes per annum to 55 million tonnes per annum and             On revised schedule and budget. The o 
                                                                       reduces storm vulnerability.                                                                           verall project is 72% complete. 
  50% 
-------------------------------------------  -----------  ----------  ------------------------------------------------------------------------------------------------------  ------------------------------------- 
Appin Area 9 (Australia)                             845        CY16  Maintains Illawarra Coal's production capacity with a replacement mining domain and capacity            On schedule and budget. The overall p 
                                                                       to produce 3.5 million tonnes per annum of metallurgical coal.                                         roject is 51% complete. 
  100% 
-------------------------------------------  -----------  ----------  ------------------------------------------------------------------------------------------------------  ------------------------------------- 
 

(vi) Excludes announced pre-commitment funding.

Aluminium, Manganese and Nickel

Production

 
                                   SEP    SEP Q13    SEP Q13 
                                  2013         vs         vs 
                                   QTR    SEP Q12    JUN Q13 
------------------------------  ------  ---------  --------- 
Alumina ('000 tonnes)            1,251         7%        -1% 
------------------------------  ------  ---------  --------- 
Aluminium ('000 tonnes)            310        15%         0% 
------------------------------  ------  ---------  --------- 
Manganese ore ('000 tonnes)      2,046        -5%        -9% 
------------------------------  ------  ---------  --------- 
Manganese alloy ('000 tonnes)      137         5%       -25% 
------------------------------  ------  ---------  --------- 
Nickel ('000 tonnes)              40.4         9%         0% 
------------------------------  ------  ---------  --------- 
 

Alumina - Alumina production increased by seven per cent in the September 2013 quarter to 1.3 million tonnes (BHP Billiton share) as the Efficiency and Growth project at Worsley (Australia) approached nameplate capacity.

Aluminium - Aluminium production increased by 15 per cent in the September 2013 quarter to 310 thousand tonnes (BHP Billiton share). Production benefited from strong operating performance at our Southern African smelters which included a second consecutive quarterly production record at Hillside (South Africa).

Manganese ore - Manganese ore production decreased during the September 2013 quarter due to a planned shutdown at Hotazel (South Africa) and lower recoveries at GEMCO (Australia).

Manganese alloy - Manganese alloy volumes increased by five per cent from the September 2012 quarter which was affected by the temporary suspension of operations at TEMCO (Australia). Planned maintenance at Metalloys (South Africa) and TEMCO contributed to the 25 per cent decline in manganese alloy volumes from the June 2013 quarter.

Nickel - Nickel production increased by nine per cent in the September 2013 quarter to 40 thousand tonnes (BHP Billiton share) and reflected strong operating performance at Nickel West (Australia).

Minerals exploration

Greenfield minerals exploration is focused on advancing copper targets within Chile and Peru. Minerals exploration expenditure in the September 2013 quarter was US$115 million, of which US$105 million was expensed (vii).

(vii) Reported on the basis of IFRS 10 which requires the full consolidation of Escondida, as compared to the proportional consolidation of our 57.5 per cent equity interest which has been applied historically.

This report represents the Interim Management Statement for the purposes of the UK Listing Authority's Disclosure and Transparency Rules. There have been no significant changes in the financial position of the Group in the quarter ended 30 September 2013.

Further information on BHP Billiton can be found at: www.bhpbilliton.com

 
 Media Relations                                   Investor Relations 
 
  Australia                                         Australia 
 
  Emily Perry                                       James Agar 
  Tel: +61 3 9609 2800 Mobile: +61 477 325 803      Tel: +61 3 9609 2222 Mobile: +61 467 807 064 
  email: Emily.Perry@bhpbilliton.com                email: James.Agar@bhpbilliton.com 
 
  Fiona Hadley                                      Andrew Gunn 
  Tel: +61 3 9609 2211 Mobile: +61 427 777 908      Tel: +61 3 9609 3575 Mobile: +61 402 087 354 
  email: Fiona.Hadley@bhpbilliton.com               email: Andrew.Gunn@bhpbilliton.com 
 
  Eleanor Nichols                                   United Kingdom and South Africa 
  Tel: +61 3 9609 2360 Mobile: +61 407 064 748 
  email: Eleanor.Nichols@bhpbilliton.com            Tara Dines 
                                                    Tel: +44 20 7802 7113 Mobile: +44 7825 342 232 
  United Kingdom                                    Email: Tara.Dines@bhpbilliton.com 
 
  Ruban Yogarajah                                   Americas 
  Tel: +44 20 7802 4033 Mobile: +44 7827 082 022 
  email: Ruban.Yogarajah@bhpbilliton.com            James Agar 
                                                    Tel: +61 3 9609 2222 Mobile: +61 467 807 064 
  Jennifer White                                    email: James.Agar@bhpbilliton.com 
  Tel: +44 20 7802 7462 Mobile: +44 7827 253 764 
  email: Jennifer.White@bhpbilliton.com             Matt Chism 
                                                    Tel: +1 71 359 96158 Mobile: +1 281 782 2238 
  Americas                                          email: Matt.E.Chism@bhpbilliton.com 
 
  Jaryl Strong 
  Tel: +1 713 499 5548 Mobile: +1 281 222 6627 
  email: Jaryl.Strong@bhpbilliton.com 
 
  BHP Billiton Limited ABN 49 004 028 077            BHP Billiton Plc Registration number 3196209 
  Registered in Australia                            Registered in England and Wales 
  Registered Office: Level 16, 171 Collins           Registered Office: Neathouse Place 
  Street                                             London SW1V 1BH United Kingdom 
  Melbourne Victoria 3000 Australia                  Tel +44 20 7802 4000 Fax +44 20 7802 4111 
  Tel +61 1300 55 4757 Fax +61 3 9609 3015 
                              Members of the BHP Billiton Group which is headquartered in Australia 
 BHP BILLITON PRODUCTION SUMMARY 
------------------------------------------------------------------------------------------------------------------------------------- 
                                                                      QUARTER ENDED                  YEAR TO DATE            % CHANGE 
                                      ---------------------------------------------  ----------------------------  ------------------ 
                                                                                                                       SEP        SEP 
                                                                                                                       Q13        Q13 
                                                  SEP            JUN            SEP            SEP            SEP       vs         vs 
                                                 2012           2013           2013           2013           2012      SEP        JUN 
                                                                                                                       Q12        Q13 
                                      ---------------  -------------  -------------  -------------  -------------  -------  --------- 
 PETROLEUM 
 Crude oil & 
  condensate              ('000 bbl)           18,036         18,559         20,421         20,421         18,036      13%        10% 
 Natural gas                   (bcf)           232.85         214.49         219.66         219.66         232.85      -6%         2% 
 NGL                      ('000 boe)            4,411          4,882          5,632          5,632          4,411      28%        15% 
 Total petroleum            (million 
  products                      boe)             61.3           59.2           62.7           62.7           61.3       2%         6% 
 COPPER 
 Copper                ('000 tonnes)            379.4          461.7          403.3          403.3          379.4       6%       -13% 
 Lead                       (tonnes)           52,183         67,034         46,445         46,445         52,183     -11%       -31% 
 Zinc                       (tonnes)           25,922         45,881         28,555         28,555         25,922      10%       -38% 
 Gold                       (ounces)           39,968         56,070         45,045         45,045         39,968      13%       -20% 
 Silver                ('000 ounces)            9,446         11,602          8,688          8,688          9,446      -8%       -25% 
 Uranium oxide 
  concentrate               (tonnes)            1,030          1,105            970            970          1,030      -6%       -12% 
 Molybdenum                 (tonnes)              454            376            458            458            454       1%        22% 
 IRON ORE 
 Iron Ore              ('000 tonnes)           39,772         47,689         48,848         48,848         39,772      23%         2% 
 COAL 
 Metallurgical coal    ('000 tonnes)            8,938         10,858         10,185         10,185          8,938      14%        -6% 
 Energy coal           ('000 tonnes)           19,144         18,561         19,639         19,639         19,144       3%         6% 
 ALUMINIUM, MANGANESE AND NICKEL 
 Alumina               ('000 tonnes)            1,170          1,265          1,251          1,251          1,170       7%        -1% 
 Aluminium             ('000 tonnes)              269            310            310            310            269      15%         0% 
 Manganese ore         ('000 tonnes)            2,146          2,246          2,046          2,046          2,146      -5%        -9% 
 Manganese alloy       ('000 tonnes)              130            182            137            137            130       5%       -25% 
 Nickel                ('000 tonnes)             37.0           40.3           40.4           40.4           37.0       9%         0% 
 
 

Throughout this report figures in italics indicate that this figure has been adjusted since it was previously reported.

 
 BHP BILLITON ATTRIBUTABLE PRODUCTION 
-------------------------------------------------------------------------------------------------------------------------------------------------------- 
                                                                     QUARTER ENDED                                                YEAR TO DATE 
                                --------------------------------------------------------------------------------------  -------------------------------- 
                        BHP 
                      Billiton         SEP               DEC               MAR               JUN              SEP             SEP              SEP 
                      interest        2012              2012              2013              2013             2013            2013             2012 
 ------------------  ---------  ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 PETROLEUM 
 Production 
  Crude oil and 
   condensate ('000 
   bbl)                                   18,036            19,228            16,689            18,559          20,421          20,421            18,036 
  Natural gas (bcf)                       232.85            219.66            207.27            214.49          219.66          219.66            232.85 
  NGL ('000 boe) 
   (a)                                     4,411             4,064             4,182             4,882           5,632           5,632             4,411 
  Total petroleum 
   products 
   (million boe)                            61.3              59.9              55.4              59.2            62.7            62.7              61.3 
                                ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 COPPER (b) 
 COPPER 
 Payable metal in 
 concentrate ('000 
 tonnes) 
  Escondida (c)          57.5%             176.0             209.9             222.6             223.0           205.1           205.1             176.0 
  Antamina               33.8%              40.2              39.6              25.2              34.7            41.9            41.9              40.2 
  Pinto Valley            100%                 -               0.5               5.3              10.8            10.9            10.9                 - 
  Total                                    216.2             250.0             253.1             268.5           257.9           257.9             216.2 
                                ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 Cathode ('000 
 tonnes) 
  Escondida (c)          57.5%              72.3              71.0              75.3              79.3            73.2            73.2              72.3 
  Pampa Norte (d)         100%              52.7              58.8              56.4              64.7            43.5            43.5              52.7 
  Pinto Valley            100%               1.2               1.2               1.2               1.3             0.8             0.8               1.2 
  Olympic Dam             100%              37.0              33.6              47.7              47.9            27.9            27.9              37.0 
  Total                                    163.2             164.6             180.6             193.2           145.4           145.4             163.2 
  Total Copper                             379.4             414.6             433.7             461.7           403.3           403.3             379.4 
                                ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 LEAD 
 Payable metal in 
 concentrate 
 (tonnes) 
  Cannington              100%            51,923            45,937            48,899            66,666          46,287          46,287            51,923 
  Antamina               33.8%               260               198               181               368             158             158               260 
  Total                                   52,183            46,135            49,080            67,034          46,445          46,445            52,183 
                                ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 ZINC 
 Payable metal in concentrate 
 (tonnes) 
  Cannington              100%            11,408            13,622            11,045            20,206          16,033          16,033            11,408 
  Antamina               33.8%            14,514            12,587            19,148            25,675          12,522          12,522            14,514 
  Total                                   25,922            26,209            30,193            45,881          28,555          28,555            25,922 
                                ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 GOLD 
 Payable metal in 
 concentrate 
 (ounces) 
  Escondida (c)          57.5%            16,951            18,359            18,626            17,593          17,347          17,347            16,951 
  Olympic Dam 
   (refined gold)         100%            23,017            24,215            27,531            38,477          27,649          27,649            23,017 
  Pinto Valley            100%                 -                 -                 -                 -              49              49                 - 
  Total                                   39,968            42,574            46,157            56,070          45,045          45,045            39,968 
                                ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 SILVER 
 Payable metal in concentrate 
 ('000 ounces) 
  Escondida (c)          57.5%               631               696               743               890             891             891               631 
  Antamina               33.8%               919               934               802             1,297           1,205           1,205               919 
  Cannington              100%             7,689             6,949             7,323             9,101           6,361           6,361             7,689 
  Olympic Dam 
   (refined silver)       100%               207               193               214               266             190             190               207 
  Pinto Valley            100%                 -                 -                11                48              41              41                 - 
  Total                                    9,446             8,772             9,093            11,602           8,688           8,688             9,446 
                                ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 URANIUM OXIDE 
 CONCENTRATE 
 Payable metal in 
 concentrate 
 (tonnes) 
  Olympic Dam             100%             1,030             1,005               926             1,105             970             970             1,030 
  Total                                    1,030             1,005               926             1,105             970             970             1,030 
                                ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 MOLYBDENUM 
 Payable metal in 
 concentrate 
 (tonnes) 
  Antamina               33.8%               454               410               321               376             458             458               454 
  Total                                      454               410               321               376             458             458               454 
                                ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
  Refer footnotes on page 15. 
 IRON ORE 
 Production ('000 
 tonnes) (e) 
  Newman (f)               85%            11,752            12,809            13,028            15,408          15,362          15,362            11,752 
  Goldsworthy Joint 
   Venture                 85%               432               378               296                 -             202             202               432 
  Area C Joint 
   Venture                 85%            10,937            10,245            10,983            12,552          11,814          11,814            10,937 
  Yandi Joint 
   Venture                 85%            13,771            15,954            13,302            17,027          18,146          18,146            13,771 
  Jimblebar                85%                 -                 -                 -                 -             595             595                 - 
  Samarco                  50%             2,880             2,804             2,596             2,702           2,729           2,729             2,880 
  Total                                   39,772            42,190            40,205            47,689          48,848          48,848            39,772 
                                ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 COAL 
 METALLURGICAL COAL 
 Production ('000 
 tonnes) (g) 
  BMA                      50%             5,182             5,440             5,327             6,696           6,705           6,705             5,182 
  BHP Mitsui Coal 
   (h)                     80%             1,766             1,589             1,862             1,846           2,057           2,057             1,766 
  Illawarra               100%             1,990             1,859             1,777             2,316           1,423           1,423             1,990 
  Total                                    8,938             8,888             8,966            10,858          10,185          10,185             8,938 
                                ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 ENERGY COAL 
 Production ('000 
 tonnes) 
  South Africa (i)         90%             8,454             7,969             7,302             7,902           7,937           7,937             8,454 
  USA                     100%             3,408             3,280             3,351             2,752           3,145           3,145             3,408 
  Australia               100%             4,453             4,827             3,837             4,893           5,372           5,372             4,453 
  Colombia                 33%             2,829             2,662             1,512             3,014           3,185           3,185             2,829 
  Total                                   19,144            18,738            16,002            18,561          19,639          19,639            19,144 
                                ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 ALUMINIUM, 
 MANGANESE AND 
 NICKEL 
 ALUMINA 
 Saleable 
 production ('000 
 tonnes) 
  Worsley                  86%               859               944               911               961             946             946               859 
  Alumar                   36%               311               288               302               304             305             305               311 
  Total                                    1,170             1,232             1,213             1,265           1,251           1,251             1,170 
                                ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 ALUMINIUM 
 Production ('000 
 tonnes) 
  Hillside                100%               139               167               178               181             184             184               139 
  Bayside                 100%                24                24                24                24              24              24                24 
  Alumar                   40%                39                39                37                39              35              35                39 
  Mozal                    47%                67                67                64                66              67              67                67 
  Total                                      269               297               303               310             310             310               269 
                                ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 MANGANESE ORES 
 Saleable 
 production ('000 
 tonnes) 
  South Africa (j)       44.4%               858               834               859               939             864             864               858 
  Australia (j)            60%             1,288             1,283             1,149             1,307           1,182           1,182             1,288 
  Total                                    2,146             2,117             2,008             2,246           2,046           2,046             2,146 
                                ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 MANGANESE ALLOYS 
 Saleable 
 production ('000 
 tonnes) 
  South Africa (j) 
   (k)                     60%                93                91                86               104              86              86                93 
  Australia (j)            60%                37                62                57                78              51              51                37 
  Total                                      130               153               143               182             137             137               130 
                                ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 NICKEL 
 Saleable 
 production ('000 
 tonnes) 
  Cerro Matoso           99.9%              13.3              12.4              12.3              12.8            12.0            12.0              13.3 
  Nickel West             100%              23.7              22.3              29.8              27.5            28.4            28.4              23.7 
  Total                                     37.0              34.7              42.1              40.3            40.4            40.4              37.0 
                                ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 

Refer footnotes on page 15

(a) LPG and ethane are reported as Natural Gas Liquid (NGL). Product-specific conversions are made and NGL is reported in barrels of oil equivalent (boe).

(b) Metal production is reported on the basis of payable metal.

(c) Shown on 100% basis following the application of the new IFRS 10 which came into effect from 1 July 2013. BHP Billiton interest in saleable production is 57.5%.

(d) Includes Cerro Colorado and Spence.

(e) Iron ore production is reported on a wet tonnes basis.

(f) Newman includes Mt Newman Joint Venture and Wheelarra.

(g) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.

(h) Shown on 100% basis. BHP Billiton interest in saleable production is 80%.

(i) Shown on 100% basis. BHP Billiton interest in saleable production is 90%.

(j) Shown on 100% basis. BHP Billiton interest in saleable production is 60%, except Hotazel Manganese Mines which is 44.4%.

(k) Production includes Medium Carbon Ferro Manganese.

 
 PRODUCTION AND 
 SALES REPORT 
-------------------- 
                                                         QUARTER ENDED                                      YEAR TO DATE 
                      -----------------------------------------------------------------------------------  -------------------------------- 
                                   SEP             DEC             MAR               JUN              SEP               SEP             SEP 
                                  2012            2012            2013              2013             2013              2013            2012 
  ------------------  ----------------  --------------  --------------  ----------------  ---------------  ----------------  -------------- 
 PETROLEUM 
 BHP Billiton attributable production unless otherwise stated. 
 CRUDE OIL & 
 CONDENSATE ('000 
 barrels) 
  Bass Strait                    2,569           2,081           1,934             2,229            2,247             2,247           2,569 
  North West Shelf               1,867           1,829           1,526             1,646            1,865             1,865           1,867 
  Stybarrow                        534             464             323               401              348               348             534 
  Pyrenees                       2,605           2,379           1,659             1,817            1,707             1,707           2,605 
  Other Australia 
   (a)                              17              15              15                12               14                14              17 
  Atlantis (b)                   1,554           2,376           1,471             2,594            2,953             2,953           1,554 
  Mad Dog (b)                      369             906             791               649              732               732             369 
  Shenzi (b)                     3,783           4,008           3,580             3,378            3,467             3,467           3,783 
  Onshore US (c)                 2,358           2,658           3,071             3,614            5,044             5,044           2,358 
  Trinidad/Tobago                  376             362             331               259              320               320             376 
  Other Americas (b) 
   (d)                             367             410             384               403              378               378             367 
  UK (e)                           260             355             326               282              142               142             260 
  Algeria                        1,309           1,316           1,207             1,210            1,142             1,142           1,309 
  Pakistan                          68              69              71                65               62                62              68 
  Total                         18,036          19,228          16,689            18,559           20,421            20,421          18,036 
                      ----------------  --------------  --------------  ----------------  ---------------  ----------------  -------------- 
 NATURAL GAS 
 (billion cubic 
 feet) 
  Bass Strait                    40.06           26.67           23.38             33.63            34.20             34.20           40.06 
  North West Shelf               35.33           34.09           31.29             30.29            34.18             34.18           35.33 
  Other Australia 
   (a)                            6.20            5.48            5.17              4.54             9.32              9.32            6.20 
  Atlantis (b)                    0.59            0.89            0.54              0.83             1.26              1.26            0.59 
  Mad Dog (b)                     0.06            0.18            0.15              0.05             0.11              0.11            0.06 
  Shenzi (b)                      2.11            0.94            0.81              0.78             0.80              0.80            2.11 
  Onshore US (c)                122.59          123.03          115.69            118.08           114.89            114.89          122.59 
  Trinidad/Tobago                 9.21            9.15            8.84              9.07             9.90              9.90            9.21 
  Other Americas (b) 
   (d)                            0.35            0.48            0.59              0.29             0.27              0.27            0.35 
 
  UK (e)                          3.29            5.26            6.44              4.09             3.47              3.47            3.29 
  Pakistan                       13.06           13.49           14.37             12.84            11.26             11.26           13.06 
  Total                         232.85          219.66          207.27            214.49           219.66            219.66          232.85 
                      ----------------  --------------  --------------  ----------------  ---------------  ----------------  -------------- 
 NGL ('000 barrels 
 of oil equivalent) 
  Bass Strait                    2,053           1,342           1,405             1,753            2,001             2,001           2,053 
  North West Shelf                 385             354             323               312              399               399             385 
  Atlantis (b)                      54             209              96               200              255               255              54 
  Mad Dog (b)                       16              72              55                 -               38                38              16 
  Shenzi (b)                       370             324             269               224              266               266             370 
  Onshore US (c)                 1,516           1,736           2,004             2,375            2,656             2,656           1,516 
  Other Americas (b) 
   (d)                              17              16              13                 9               11                11              17 
  UK (e)                             -              11              17                 9                6                 6               - 
  Total                          4,411           4,064           4,182             4,882            5,632             5,632           4,411 
                      ----------------  --------------  --------------  ----------------  ---------------  ----------------  -------------- 
 TOTAL PETROLEUM 
  PRODUCTS                        61.3            59.9            55.4              59.2             62.7              62.7            61.3 
                      ----------------  --------------  --------------  ----------------  ---------------  ----------------  -------------- 
 (million barrels of 
  oil equivalent) 
  (f) 
 

(a) Other Australia includes Minerva and Macedon. Macedon achieved first production in August 2013.

(b) Gulf of Mexico volumes are net of royalties.

(c) Onshore US volumes are net of mineral holder royalties.

(d) Other Americas includes Neptune, Genesis and Overriding Royalty Interest.

(e) An agreement to sell Liverpool Bay was reached in October 2013 and the transaction is expected to close before the end of the 2014 financial year.

(f) Total barrels of oil equivalent (boe) conversions are based on 6,000 scf of natural gas equals 1 boe.

 
 PRODUCTION AND SALES REPORT 
-------------------------------- 
                                                                       QUARTER ENDED                                       YEAR TO DATE 
                                  --------------------------------------------------------------------------------------  -------------------------------- 
                                               SEP               DEC               MAR               JUN             SEP             SEP               SEP 
                                              2012              2012              2013              2013            2013            2013              2012 
 -------------   ---------------  ----------------  ----------------  ----------------  ----------------  --------------  --------------  ---------------- 
 COPPER 
 BHP Billiton attributable production and sales unless otherwise stated. Metals production 
  is payable metal unless otherwise stated. 
 Escondida, 
 Chile (a) 
  Material 
   mined          ('000 tonnes)            102,499            96,938            94,567            98,665          93,744          93,744           102,499 
  Sulphide ore 
   milled         ('000 tonnes)             16,850            18,796            18,964            19,295          18,276          18,276            16,850 
  Average 
   copper grade   (%)                        1.35%             1.39%             1.44%             1.42%           1.37%           1.37%             1.35% 
  Production ex 
   mill           ('000 tonnes)              185.2             216.6             229.3             231.9           210.6           210.6             185.2 
  Production 
  Payable 
   copper         ('000 tonnes)              176.0             209.9             222.6             223.0           205.1           205.1             176.0 
  Payable gold 
   concentrate    (fine ounces)             16,951            18,359            18,626            17,593          17,347          17,347            16,951 
  Copper 
   cathode (EW)   ('000 tonnes)               72.3              71.0              75.3              79.3            73.2            73.2              72.3 
  Payable 
   silver 
   concentrate    ('000 ounces)                631               696               743               890             891             891               631 
  Sales 
  Payable 
   copper         ('000 tonnes)              165.6             226.6             215.8             228.2           192.3           192.3             165.6 
  Payable gold 
   concentrate    (fine ounces)             15,650            19,235            18,325            15,831          12,490          12,490            15,650 
  Copper 
   cathode (EW)   ('000 tonnes)               67.5              81.4              59.1              95.0            63.0            63.0              67.5 
  Payable 
   silver 
   concentrate    ('000 ounces)                563               772               720               908             836             836               563 
  (a) Shown on 100% basis following the application of the new IFRS 10 which came into effect 
   from 1 July 2013. BHP Billiton interest in saleable production is 57.5%. 
 Pampa Norte, 
 Chile 
  Cerro 
  Colorado 
  Material 
   mined          ('000 tonnes)             16,067            15,722            14,964            16,303          15,771          15,771            16,067 
  Ore milled      ('000 tonnes)              4,505             4,206             4,350             4,351           4,161           4,161             4,505 
  Average 
   copper grade   (%)                        0.55%             0.66%             0.65%             0.82%           0.78%           0.78%             0.55% 
  Production 
  Copper 
   cathode (EW)   ('000 tonnes)               17.8              17.9              14.6              21.2            17.6            17.6              17.8 
  Sales 
  Copper 
   cathode (EW)   ('000 tonnes)               16.1              18.8              13.7              21.7            17.3            17.3              16.1 
  Spence 
  Material 
   mined          ('000 tonnes)             27,541            25,999            28,861            28,646          24,331          24,331            27,541 
  Ore milled      ('000 tonnes)              3,752             4,161             4,041             4,146           4,860           4,860             3,752 
  Average 
   copper grade   (%)                        1.17%             1.29%             1.38%             1.16%           1.11%           1.11%             1.17% 
  Production 
  Copper 
   cathode (EW)   ('000 tonnes)               34.9              40.9              41.8              43.5            25.9            25.9              34.9 
  Sales 
  Copper 
   cathode (EW)   ('000 tonnes)               31.1              42.6              29.8              57.9            25.9            25.9              31.1 
 Antamina, Peru 
  Material 
   mined (100%)   ('000 tonnes)             54,482            49,246            48,032            56,254          56,428          56,428            54,482 
  Sulphide ore 
   milled 
   (100%)         ('000 tonnes)             12,274            11,752            10,330            12,424          11,765          11,765            12,274 
  Average head 
  grades 
   - Copper       (%)                        1.15%             1.16%             0.88%             1.03%           1.21%           1.21%             1.15% 
   - Zinc         (%)                        0.66%             0.64%             0.93%             1.02%           0.56%           0.56%             0.66% 
  Production 
  Payable 
   copper         ('000 tonnes)               40.2              39.6              25.2              34.7            41.9            41.9              40.2 
  Payable zinc    (tonnes)                  14,514            12,587            19,148            25,675          12,522          12,522            14,514 
  Payable 
   silver         ('000 ounces)                919               934               802             1,297           1,205           1,205               919 
  Payable lead    (tonnes)                     260               198               181               368             158             158               260 
  Payable 
   molybdenum     (tonnes)                     454               410               321               376             458             458               454 
  Sales 
  Payable 
   copper         ('000 tonnes)               39.7              42.7              24.1              31.9            41.3            41.3              39.7 
  Payable zinc    (tonnes)                  15,519            17,874            16,062            22,560          16,123          16,123            15,519 
  Payable 
   silver         ('000 ounces)                849             1,101               772             1,165           1,503           1,503               849 
  Payable lead    (tonnes)                     330               276               115               262             297             297               330 
  Payable 
   molybdenum     (tonnes)                     536               381               371               283             411             411               536 
 Cannington, 
 Australia 
  Material 
   mined          ('000 tonnes)                717               817               810               802             893             893               717 
  Ore milled      ('000 tonnes)                773               793               713               866             750             750               773 
  Average head 
  grades 
   - Silver       (g/t)                        355               317               364               401             315             315               355 
   - Lead         (%)                         7.6%              7.0%              7.7%              9.1%            7.4%            7.4%              7.6% 
   - Zinc         (%)                         2.5%              2.9%              2.7%              3.8%            3.2%            3.2%              2.5% 
  Production 
  Payable 
   silver         ('000 ounces)              7,689             6,949             7,323             9,101           6,361           6,361             7,689 
  Payable lead    (tonnes)                  51,923            45,937            48,899            66,666          46,287          46,287            51,923 
  Payable zinc    (tonnes)                  11,408            13,622            11,045            20,206          16,033          16,033            11,408 
  Sales 
  Payable 
   silver         ('000 ounces)              8,506             6,694             7,265             7,793           7,844           7,844             8,506 
  Payable lead    (tonnes)                  59,042            46,319            48,661            64,633          56,500          56,500            59,042 
  Payable zinc    (tonnes)                  10,379            16,321             9,439            21,056          17,286          17,286            10,379 
 Olympic Dam, 
 Australia 
  Material 
   mined (a)      ('000 tonnes)              2,226             2,123             2,448             2,750           2,897           2,897             2,226 
  Ore milled      ('000 tonnes)              2,471             2,435             2,353             2,641           2,404           2,404             2,471 
  Average 
   copper grade   (%)                        1.90%             1.71%             1.73%             1.86%           1.85%           1.85%             1.90% 
  Average 
   uranium 
   grade          (kg/t)                      0.54              0.51              0.50              0.56            0.53            0.53              0.54 
  Production 
  Copper 
   cathode (ER)   ('000 tonnes)               34.0              30.4              44.7              45.1            25.9            25.9              34.0 
  Copper 
   cathode (EW)   ('000 tonnes)                3.0               3.2               3.0               2.8             2.0             2.0               3.0 
  Uranium oxide 
   concentrate    (tonnes)                   1,030             1,005               926             1,105             970             970             1,030 
  Refined gold    (fine ounces)             23,017            24,215            27,531            38,477          27,649          27,649            23,017 
  Refined 
   silver         ('000 ounces)                207               193               214               266             190             190               207 
  Sales 
  Copper 
   cathode (ER)   ('000 tonnes)               35.1              33.2              40.1              46.4            26.8            26.8              35.1 
  Copper 
   cathode (EW)   ('000 tonnes)                3.4               2.7               3.1               3.5             2.1             2.1               3.4 
  Uranium oxide 
   concentrate    (tonnes)                     615             1,343               816             1,374             930             930               615 
  Refined gold    (fine ounces)             20,949            25,227            24,678            38,394          21,675          21,675            20,949 
  Refined 
   silver         ('000 ounces)                265               169               211               275             176             176               265 
  (a)            Material mined refers to run of mine ore mined and hoisted. 
 Pinto Valley, 
 US (a) 
  Production 
  Payable 
   copper         ('000 tonnes)                  -               0.5               5.3              10.8            10.9            10.9                 - 
  Copper 
   cathode (EW)   ('000 tonnes)                1.2               1.2               1.2               1.3             0.8             0.8               1.2 
  Payable 
   silver         ('000 ounces)                  -                 -                11                48              41              41                 - 
  Payable gold    (ounces)                       -                 -                 -                 -              49              49                 - 
  Sales 
  Payable 
   copper         ('000 tonnes)                  -                 -               2.6               9.9             7.3             7.3                 - 
  Copper 
   cathode (EW)   ('000 tonnes)                1.2               1.2               1.1               1.4             1.1             1.1               1.2 
  Payable 
   silver         ('000 ounces)                  -                 -                11                48              41              41                 - 
  Payable gold    (ounces)                       -                 -                 -                 -              49              49                 - 
 

(a) On 11 October 2013 BHP Billiton completed the sale of its Pinto Valley operations.

 
 PRODUCTION AND SALES REPORT 
----------------------------------- 
                                                                         QUARTER ENDED                                                YEAR TO DATE 
                                     -------------------------------------------------------------------------------------  ------------------------------- 
                                                  SEP               DEC               MAR               JUN            SEP            SEP               SEP 
                                                 2012              2012              2013              2013           2013           2013              2012 
    ---  -----------------  -------  ----------------  ----------------  ----------------  ----------------  -------------  -------------  ---------------- 
 IRON ORE 
 BHP Billiton attributable production and sales unless otherwise stated. 
 ('000 tonnes) 
 IRON ORE 
 Pilbara, Australia 
     Production (a) 
  Newman (b)                                   11,752            12,809            13,028            15,408         15,362         15,362            11,752 
  Goldsworthy Joint 
   Venture                                        432               378               296                 -            202            202               432 
  Area C Joint Venture                         10,937            10,245            10,983            12,552         11,814         11,814            10,937 
  Yandi Joint Venture                          13,771            15,954            13,302            17,027         18,146         18,146            13,771 
  Jimblebar                                         -                 -                 -                 -            595            595                 - 
  Total (BHP Billiton 
   share)                                      36,892            39,386            37,609            44,987         46,119         46,119            36,892 
                                     ----------------  ----------------  ----------------  ----------------  -------------  -------------  ---------------- 
  Total production 
   (100%)                                      43,403            46,337            44,245            52,926         54,258         54,258            43,403 
     Sales 
  Lump                                          8,338             9,806             9,339            11,284         10,292         10,292             8,338 
  Fines                                        28,718            30,479            28,370            34,621         35,235         35,235            28,718 
  Total (BHP Billiton 
   share)                                      37,056            40,285            37,709            45,905         45,527         45,527            37,056 
                                     ----------------  ----------------  ----------------  ----------------  -------------  -------------  ---------------- 
  Total sales (100%)                           43,595            47,393            44,363            54,006         53,561         53,561            43,595 
      (a) Iron ore production and sales are reported on a wet tonnes basis. 
       (b) Newman includes Mt Newman Joint Venture and Wheelarra. 
 Samarco, Brazil 
  Production (a)                                2,880             2,804             2,596             2,702          2,729          2,729             2,880 
  Sales                                         2,622             3,227             2,515             2,651          2,676          2,676             2,622 
 
 

(a) Iron ore production and sales are reported on a wet tonnes basis.

 
 PRODUCTION AND 
 SALES REPORT 
----------------- 
                                                     QUARTER ENDED                                     YEAR TO DATE 
                   ---------------------------------------------------------------------------------  ------------------------------- 
                                SEP               DEC             MAR             JUN            SEP            SEP               SEP 
                               2012              2012            2013            2013           2013           2013              2012 
  ---------------  ----------------  ----------------  --------------  --------------  -------------  -------------  ---------------- 
 COAL 
 BHP Billiton attributable production and sales unless otherwise stated. 
 ('000 tonnes) 
 METALLURGICAL 
 COAL 
 Queensland, 
 Australia 
  Production (a) 
  BMA 
  Blackwater                  1,148             1,588           1,157           1,539          1,691          1,691             1,148 
  Goonyella                   1,535             1,392           1,478           1,816          1,737          1,737             1,535 
  Peak Downs                  1,029             1,151           1,225           1,140          1,112          1,112             1,029 
  Saraji                        773               994             711             971          1,197          1,197               773 
  Gregory Joint 
   Venture (b)                  697               315             657             854            464            464               697 
  Daunia                          -                 -              99             376            504            504                 - 
  BMA total                   5,182             5,440           5,327           6,696          6,705          6,705             5,182 
                   ----------------  ----------------  --------------  --------------  -------------  -------------  ---------------- 
  BHP Mitsui Coal 
  (c) 
  South Walker 
   Creek                      1,084               864           1,188           1,215          1,298          1,298             1,084 
  Poitrel                       682               725             674             631            759            759               682 
  BHP Mitsui Coal 
   total                      1,766             1,589           1,862           1,846          2,057          2,057             1,766 
                                                                                                      -------------  ---------------- 
  Queensland 
   total                      6,948             7,029           7,189           8,542          8,762          8,762             6,948 
                   ----------------  ----------------  --------------  --------------  -------------  -------------  ---------------- 
  Sales 
  Coking coal                 4,058             5,561           4,933           6,316          6,123          6,123             4,058 
  Weak coking 
   coal                       1,545             1,820           2,029           2,417          2,397          2,397             1,545 
  Thermal coal                  239               237              75              30            160            160               239 
  Total                       5,842             7,618           7,037           8,763          8,680          8,680             5,842 
                   ----------------  ----------------  --------------  --------------  -------------  -------------  ---------------- 
      (a) Metallurgical coal production is reported on the basis of saleable product. Production 
       figures include some thermal coal. 
       (b) Gregory open-cut ceased production on 10 October 2012. 
       (c) Shown on 100% basis. BHP Billiton interest in saleable production is 80%. 
 Illawarra, 
 Australia 
  Production (a)              1,990             1,859           1,777           2,316          1,423          1,423             1,990 
  Sales 
  Coking coal                 1,775             1,785           1,595           1,877          1,084          1,084             1,775 
  Thermal coal                  502               327             145             436            359            359               502 
  Total                       2,277             2,112           1,740           2,313          1,443          1,443             2,277 
                   ----------------  ----------------  --------------  --------------  -------------  -------------  ---------------- 
 

(a) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.

 
 ENERGY COAL 
 South Africa (a) 
  Production                8,454           7,969           7,302           7,902             7,937             7,937           8,454 
  Sales 
  Export                    3,385           3,583           3,604           3,363             2,504             2,504           3,385 
  Local utility             4,869           4,615           4,171           4,353             4,543             4,543           4,869 
  Inland                       38              28              32              24                 -                 -              38 
  Total                     8,292           8,226           7,807           7,740             7,047             7,047           8,292 
                   --------------  --------------  --------------  --------------  ----------------  ----------------  -------------- 
       (a) Shown on 100% basis. BHP Billiton interest in saleable product is 90%. 
 New Mexico, US 
  Production 
  Navajo Coal               1,943           2,012           1,944           1,569             1,670             1,670           1,943 
  San Juan Coal             1,465           1,268           1,407           1,183             1,475             1,475           1,465 
  Total                     3,408           3,280           3,351           2,752             3,145             3,145           3,408 
                   --------------  --------------  --------------  --------------  ----------------  ----------------  -------------- 
  Sales - local 
   utility                  3,420           3,265           3,275           2,815             3,129             3,129           3,420 
 NSW Energy Coal, 
 Australia 
  Production                4,453           4,827           3,837           4,893             5,372             5,372           4,453 
  Sales 
  Export                    4,488           4,187           4,505           4,289             4,037             4,037           4,488 
  Inland                      250             265             174             478               446               446             250 
  Total                     4,738           4,452           4,679           4,767             4,483             4,483           4,738 
                   --------------  --------------  --------------  --------------  ----------------  ----------------  -------------- 
 Cerrejon Coal, 
 Colombia 
  Production                2,829           2,662           1,512           3,014             3,185             3,185           2,829 
  Sales - export            2,630           2,702           1,774           3,157             3,155             3,155           2,630 
 PRODUCTION AND 
 SALES REPORT 
----------------- 
                                                     QUARTER ENDED                                    YEAR TO DATE 
                   --------------------------------------------------------------------------------  -------------------------------- 
                              SEP             DEC             MAR             JUN               SEP               SEP             SEP 
                             2012            2012            2013            2013              2013              2013            2012 
  ---------------  --------------  --------------  --------------  --------------  ----------------  ----------------  -------------- 
 ALUMINIUM, 
 MANGANESE AND 
 NICKEL 
 BHP Billiton attributable production and sales unless otherwise stated. 
 ('000 tonnes) 
 ALUMINA 
  Saleable 
  production 
  Worsley, 
   Australia                  859             944             911             961               946               946             859 
  Alumar, Brazil              311             288             302             304               305               305             311 
  Total                     1,170           1,232           1,213           1,265             1,251             1,251           1,170 
                   --------------  --------------  --------------  --------------  ----------------  ----------------  -------------- 
  Sales 
  Worsley, 
   Australia                  820             916             910           1,031               897               897             820 
  Alumar, Brazil              352             298             296             329               278               278             352 
  Total                     1,172           1,214           1,206           1,360             1,175             1,175           1,172 
                   --------------  --------------  --------------  --------------  ----------------  ----------------  -------------- 
 ALUMINIUM 
  Production 
  Hillside, South 
   Africa                     139             167             178             181               184               184             139 
  Bayside, South 
   Africa                      24              24              24              24                24                24              24 
  Alumar, Brazil               39              39              37              39                35                35              39 
  Mozal, 
   Mozambique                  67              67              64              66                67                67              67 
  Total                       269             297             303             310               310               310             269 
                   --------------  --------------  --------------  --------------  ----------------  ----------------  -------------- 
  Sales 
  Hillside, South 
   Africa                     139             171             166             191               180               180             139 
  Bayside, South 
   Africa                      26              26              27              26                24                24              26 
  Alumar, Brazil               46              41              39              38                34                34              46 
  Mozal, 
   Mozambique                  58              65              76              65                68                68              58 
  Total                       269             303             308             320               306               306             269 
                   --------------  --------------  --------------  --------------  ----------------  ----------------  -------------- 
 MANGANESE ORE 
  Saleable 
  production 
  South Africa 
   (a)                        858             834             859             939               864               864             858 
  Australia (a)             1,288           1,283           1,149           1,307             1,182             1,182           1,288 
  Total                     2,146           2,117           2,008           2,246             2,046             2,046           2,146 
  Sales 
  South Africa 
   (a)                        878             808             835             970               920               920             878 
  Australia (a)             1,171             979           1,326           1,102             1,078             1,078           1,171 
  Total                     2,049           1,787           2,161           2,072             1,998             1,998           2,049 
 MANGANESE ALLOY 
  Saleable 
  production 
  South Africa 
   (a) (b)                     93              91              86             104                86                86              93 
  Australia (a)                37              62              57              78                51                51              37 
  Total                       130             153             143             182               137               137             130 
  Sales 
  South Africa 
   (a) (b)                     74             112              89             110                88                88              74 
  Australia (a)                46              52              68              61                54                54              46 
  Total                       120             164             157             171               142               142             120 
      (a) Shown on 100% basis. BHP Billiton interest in saleable production is 60%, except Hotazel 
       Manganese Mines which is 44.4%. 
       (b) Production includes Medium Carbon Ferro Manganese. 
 NICKEL 
 Cerro Matoso, 
 Colombia 
  Production                 13.3            12.4            12.3            12.8              12.0              12.0            13.3 
  Sales                      12.3            13.7            13.0            13.1              12.6              12.6            12.3 
 Nickel West, 
 Australia 
  Saleable 
  production 
  Nickel 
   contained in 
   concentrate                1.3             4.1             3.1             3.0               3.4               3.4             1.3 
  Nickel 
   contained in 
   finished matte             5.8             7.6             9.7             8.6               8.8               8.8             5.8 
  Nickel metal               16.6            10.6            17.0            15.9              16.2              16.2            16.6 
                   --------------  --------------  --------------  --------------  ---------------- 
  Nickel 
   production                23.7            22.3            29.8            27.5              28.4              28.4            23.7 
                   --------------  --------------  --------------  --------------  ----------------  ----------------  -------------- 
  Sales 
  Nickel 
   contained in 
   concentrate                1.6             2.9             3.1             3.0               2.7               2.7             1.6 
  Nickel 
   contained in 
   finished matte             6.7             7.0             9.0             9.7               7.8               7.8             6.7 
  Nickel metal               14.2            12.8            19.5            17.7              15.3              15.3            14.2 
                   --------------  --------------  --------------  --------------  ---------------- 
  Nickel sales               22.5            22.7            31.6            30.4              25.8              25.8            22.5 
                   --------------  --------------  --------------  --------------  ----------------  ----------------  -------------- 
 

This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCDBBDGCDDBGXB

1 Year Bhp Chart

1 Year Bhp Chart

1 Month Bhp Chart

1 Month Bhp Chart

Your Recent History

Delayed Upgrade Clock