We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Bhp Group Limited | LSE:BHP | London | Ordinary Share | AU000000BHP4 | ORD NPV (DI) |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
27.00 | 1.19% | 2,298.00 | 2,297.00 | 2,299.00 | 2,306.00 | 2,272.00 | 2,274.00 | 913,517 | 16:00:04 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
Crude Petroleum & Natural Gs | 54.19B | 12.92B | 2.5513 | 16.83 | 217.42B |
TIDMBLT
RNS Number : 0350R
BHP Billiton PLC
21 October 2013
NEWS RELEASE Release Time IMMEDIATE Date 22 October 2013 Number 24/13
BHP BILLITON OPERATIONAL REVIEW FOR THE QUARTER ENDED 30 SEPTEMBER 2013
-- BHP Billiton maintained strong momentum in the September 2013 quarter as production increased by 11% (i) from the prior corresponding period. Optimisation of the Western Australia Iron Ore (WAIO) supply chain continues to unlock substantial value with 2014 financial year production guidance raised to 212 million tonnes (100% basis). Full year production guidance is maintained for Petroleum, Copper and Coal.
-- Total petroleum production for the September 2013 quarter was a record 62.7 million barrels of oil equivalent. A 16% increase in liquids production was underpinned by significant growth in Onshore US volumes, primarily in the Black Hawk, and the start-up of a new production well at Atlantis. An additional Atlantis production well is scheduled for completion in the second half of the 2014 financial year.
-- Queensland Coal continued to benefit from its focus on productivity as it sustained an annualised production rate of 61 million tonnes (100% basis) in the September 2013 quarter.
-- Four major projects delivered first production, including the WAIO Jimblebar Mine Expansion where first production was achieved approximately six months ahead of the original schedule. All other projects are tracking to plan.
-- Our ability to simplify our portfolio and focus on our diversified pillars of Petroleum, Copper, Iron Ore and Coal remains an important point of differentiation. Since the beginning of the 2013 financial year the Group has completed major transactions totalling US$6.5 billion, which includes US$2.2 billion received in the financial year to date.
BHP Billiton Chief Executive Officer, Andrew Mackenzie, said: "Our pursuit of productivity gains and operating excellence is already yielding strong results. There is no better example than in our Iron Ore business, where the deployment of mobile crushing units and the continued debottlenecking of the supply chain has underpinned a five million tonne increase in Western Australia Iron Ore's production guidance for the 2014 financial year.
"We continue to build on the substantial US$2.7 billion reduction in controllable cash costs delivered in the 2013 financial year with strong momentum maintained in the first quarter. In addition, a 25 per cent reduction in capital and exploration expenditure to US$16 billion (ii) in the 2014 financial year has significantly increased internal competition for capital. Our rate of expenditure will decline again next year and our investment criteria cannot be met in any one project, product or geography, we will redirect our capital elsewhere or we will not invest.
"Active management of our portfolio has also delivered significant value for our shareholders. In this financial year completed transactions have already delivered proceeds of US$2.2 billion, further strengthening our solid A balance sheet. With strong production growth and our overriding commitment to substantially increase free cash flow, we are well positioned to grow returns to our shareholders."
(i) Refers to copper equivalent production based on average realised product prices for the 2013 financial year.
(ii) Capital and exploration expenditure guidance excludes deferred stripping and refers to BHP Billiton's equity interest.
Note: Unless specified otherwise: variance analysis relates to the relative performance of BHP Billiton and/or its operations during the September 2013 quarter compared with the September 2012 quarter; all references to production and capital expenditure are BHP Billiton share and reflect the adoption of the new accounting standard (IFRS 10); and all references to project capacity are 100 per cent.
Summary
SEP SEP Q13 SEP Q13 2013 vs vs Production summary QTR SEP Q12 JUN Q13 --------------------------------------- ------- --------- --------- Total petroleum products (million boe) 62.7 2% 6% --------------------------------------- ------- --------- --------- Copper ('000 tonnes) 403.3 6% -13% --------------------------------------- ------- --------- --------- Iron ore ('000 tonnes) 48,848 23% 2% --------------------------------------- ------- --------- --------- Metallurgical coal ('000 tonnes) 10,185 14% -6% --------------------------------------- ------- --------- --------- Energy coal ('000 tonnes) 19,639 3% 6% --------------------------------------- ------- --------- --------- Alumina ('000 tonnes) 1,251 7% -1% --------------------------------------- ------- --------- --------- Aluminium ('000 tonnes) 310 15% 0% --------------------------------------- ------- --------- --------- Manganese ore ('000 tonnes) 2,046 -5% -9% --------------------------------------- ------- --------- --------- Manganese alloy ('000 tonnes) 137 5% -25% --------------------------------------- ------- --------- --------- Nickel ('000 tonnes) 40.4 9% 0% --------------------------------------- ------- --------- ---------
BHP Billiton maintained strong momentum in the September 2013 quarter as production increased by 11 per cent from the prior corresponding period. Optimisation of the WAIO supply chain continues to unlock substantial value with 2014 financial year production guidance raised to 212 million tonnes (100 per cent basis). Full year production guidance is maintained for Petroleum, Copper and Coal.
Our WAIO business achieved another major milestone during the quarter with first production delivered from the Jimblebar Mine Expansion, six months ahead of its original schedule. The ramp up of phase one capacity to 35 million tonnes per annum (mtpa) is expected to be completed by the end of the 2015 financial year. Together with the recent installation of four mobile crushers, this will increase total WAIO supply chain capacity to in excess of 220 mtpa (100 per cent basis). Longer term, a low cost option to expand Jimblebar to 55 mtpa and the broader debottlenecking of the supply chain is expected to underpin capital efficient growth in capacity to approximately 260 mtpa to 270 mtpa (100 per cent basis).
First production was also achieved at Macedon, Bass Strait Turrum and North West Shelf North Rankin B Gas Compression (all Australia). In addition, the Newcastle Third Port Stage 3 project (Australia) achieved mechanical completion. These projects will not be reported in future quarterly reports. The remaining 12 major projects are tracking to plan.
During the September 2013 quarter, BHP Billiton announced an investment of US$3.4 billion (100 per cent basis) to construct a desalination facility which will deliver sustainable water supply to Escondida (Chile) over the long term. In addition, BHP Billiton announced it is investing US$2.6 billion to finish the excavation and lining of the Jansen Potash project (Canada) production and service shafts, and to continue the installation of essential surface infrastructure and utilities. Completion of both shafts is expected during the 2016 calendar year, while the associated works program will extend into the 2017 calendar year.
BHP Billiton's active program of portfolio simplification has delivered proceeds of US$2.2 billion since the commencement of the 2014 financial year with the completion of the Jimblebar (Australia) and Pinto Valley (US) transactions. In addition, the Group priced a four tranche, US$5.0 billion Global Bond during the September 2013 quarter. The proceeds will be used for general corporate purposes.
The new International Financial Reporting Standard (IFRS) 10 came into effect from 1 July 2013. The application of this accounting standard requires the full consolidation of Escondida, as compared to the proportional consolidation of our 57.5 per cent equity interest which has been applied historically. This report has been prepared on the basis of this new accounting standard and references to BHP Billiton share now include 100 per cent of Escondida. As a consequence, BHP Billiton's copper production guidance for the 2014 financial year now refers to 1.7 million tonnes, although the Group's equity interest remains unchanged at 1.2 million tonnes.
Petroleum and Potash
Production
SEP SEP Q13 SEP Q13 2013 vs vs QTR SEP Q12 JUN Q13 --------------------------------------------------------- ------ --------- --------- Crude oil, condensate and natural gas liquids ('000 boe) 26,053 16% 11% --------------------------------------------------------- ------ --------- --------- Natural gas (bcf) 219.66 -6% 2% --------------------------------------------------------- ------ --------- --------- Total petroleum products (million boe) 62.7 2% 6% --------------------------------------------------------- ------ --------- ---------
Total petroleum production - Total petroleum production for the September 2013 quarter was a record 62.7 million barrels of oil equivalent (BHP Billiton share). Guidance for the 2014 financial year remains unchanged at 250 million barrels of oil equivalent (BHP Billiton share).
Crude oil, condensate and natural gas liquids - A 16 per cent increase in liquids production in the September 2013 quarter was underpinned by significant growth in Onshore US volumes, primarily in the Black Hawk, and the start-up of a new production well at Atlantis (US). An additional Atlantis production well is scheduled for completion in the second half of the 2014 financial year. A significant increase in the number of producing wells in the liquids rich Eagle Ford contributed to a 29 per cent increase in Onshore US liquids production from the June 2013 quarter.
Planned maintenance and new well tie-ins at Pyrenees (Australia) are expected to impact conventional liquids production during the December 2013 quarter with the floating production storage and off-take (FPSO) facility offline for approximately one month. These additional production wells will mitigate natural field decline in the second half of the 2014 financial year.
Natural gas - Natural gas production declined by six per cent in the September 2013 quarter. The successful delivery of first gas from the Macedon project in August 2013 only partially offset softer seasonal demand at Bass Strait and lower production at Haynesville (US), following our deliberate decision to prioritise Onshore US development drilling in the liquids rich Black Hawk region of the Eagle Ford.
Projects
Initial Capital production expenditure target Project and ownership (US$m) date Capacity Progress --------------------- ----------- ---------- -------------------------------------- ------------------------------------------------------------------------------ Macedon (Australia) 1,050 CY13 200 million cubic feet of gas per day. First gas sales achieved in August 2013. The overall project is 100% complete. 71.43% (operator) --------------------- ----------- ---------- -------------------------------------- ------------------------------------------------------------------------------ Bass Strait Turrum 1,350 CY13 (iii) 11,000 barrels of condensate per day On revised schedule and budget for remaining scope. First gas achieved in June (Australia) and processing capacity of 200 million 2013. The overall 50% (non-operator) cubic feet of project is 91% complete. gas per day. --------------------- ----------- ---------- -------------------------------------- ------------------------------------------------------------------------------ North West Shelf 850 CY13 2,500 million cubic feet of gas per On budget. First production achieved in early October 2013. The overall North Rankin B Gas day. project is 99% complete. Compression (Australia) 16.67% (non-operator) --------------------- ----------- ---------- -------------------------------------- ------------------------------------------------------------------------------ North West Shelf 400 CY16 To maintain LNG plant throughput from On schedule and budget. The overall project is 60% complete. Greater Western the North West Shelf operations. Flank-A (Australia) 16.67% (non-operator) --------------------- ----------- ---------- -------------------------------------- ------------------------------------------------------------------------------ Bass Strait Longford 520 CY16 Designed to process approximately 400 On schedule and budget. The overall project is 20% complete. Gas Conditioning million cubic feet per day of high CO2 Plant (Australia) gas. 50% (non-operator) --------------------- ----------- ---------- -------------------------------------- ------------------------------------------------------------------------------
(iii) Initial production through the Turrum facilities is low CO2 gas. Additional high CO2 gas production from the Turrum reservoir will come online with completion of the Longford Gas Conditioning Plant in the 2016 calendar year.
Onshore US drilling and development expenditure totalled US$1.3 billion in the September 2013 quarter. The Company's rig count declined from 40 to 27 during the period which will result in lower expenditure in subsequent quarters. Approximately 75 per cent of drilling activity occurred in the Eagle Ford, with the majority focused on our liquids rich Black Hawk acreage. The optimisation of our dry gas program and the associated termination of rig contracts is expected to result in a charge of approximately US$100 million in the 2014 financial year, with the large majority to be booked in the first half. Guidance for Onshore US drilling and development expenditure remains unchanged at US$3.9 billion for the 2014 financial year.
Petroleum exploration
Exploration and appraisal wells drilled during the quarter or in the process of drilling as at 30 September 2013.
Well Location BHP Billiton equity Status ------------- -------------- -------------------- ------------------------- Raptor-1/ST-1 Gulf of Mexico 50% Plugged and abandoned DC535 (Anadarko operator) Hydrocarbons encountered ------------- -------------- -------------------- ------------------------- Sake Gulf of Mexico 60% Plugged and abandoned DC726 (Operator) Dry hole ------------- -------------- -------------------- -------------------------
Petroleum exploration expenditure for the September 2013 quarter was US$205 million, of which US$64 million was expensed. A US$600 million exploration program, largely focused on the Gulf of Mexico (US) and Western Australia, is planned for the 2014 financial year.
Potash
Investment Project and ownership (US$m) Scope Progress ---------------------- ----------- ------------------------------------------------------------------------------------ --------------------------------------- Jansen Potash (Canada) 2,600 Investment to finish the excavation and lining of the production and service shafts, Approval announced. See news release da and to ted 20 August 2013. continue the installation of essential surface infrastructure and utilities. 100% ---------------------- ----------- ------------------------------------------------------------------------------------ ---------------------------------------
Copper
Production
SEP SEP Q13 SEP Q13 2013 vs vs QTR SEP Q12 JUN Q13 --------------------------------------------- ------ --------- --------- Copper ('000 tonnes) 403.3 6% -13% --------------------------------------------- ------ --------- --------- Lead (tonnes) 46,445 -11% -31% --------------------------------------------- ------ --------- --------- Zinc (tonnes) 28,555 10% -38% --------------------------------------------- ------ --------- --------- Silver ('000 ounces) 8,688 -8% -25% --------------------------------------------- ------ --------- --------- Uranium oxide concentrate (Uranium) (tonnes) 970 -6% -12% --------------------------------------------- ------ --------- ---------
Copper - Copper production increased by six per cent in the September 2013 quarter to 403 thousand tonnes (BHP Billiton share). The application of IFRS 10 requires the full consolidation of Escondida, as compared to the proportional consolidation of our 57.5 per cent equity interest which has been applied historically. This report has been prepared on the basis of this new accounting standard and references to BHP Billiton share now include 100 per cent of Escondida. As a consequence, BHP Billiton's copper production guidance for the 2014 financial year now refers to 1.7 million tonnes, although the Group's equity interest remains unchanged at 1.2 million tonnes.
Escondida copper production increased by 12 per cent in the September 2013 quarter to 278 thousand tonnes (100 per cent basis) as milling rates improved. An eight per cent reduction from the June 2013 quarter, however, reflected planned maintenance, industrial action and lower copper ore grades, consistent with the mine plan. Escondida remains on track to produce approximately 1.1 million tonnes (100 per cent basis) of copper in the 2014 financial year before increasing to approximately 1.3 million tonnes (100 per cent basis) in the 2015 financial year.
As anticipated, Pampa Norte (Chile) copper production declined by 33 per cent from the June 2013 quarter primarily as a result of lower ore grades and recoveries at Spence. Production at Spence is expected to recover strongly in the second half of the 2014 financial year.
Antamina (Peru) achieved record copper production in the September 2013 quarter which reflected continued strong mill throughput and higher ore grades as mining progressed through a copper rich ore zone. Copper production at Antamina will be affected by lower ore grades in the second half of the 2014 financial year, consistent with the mine plan.
Olympic Dam (Australia) copper production was affected by smelter reliability issues during the September 2013 quarter. A maintenance outage scheduled for the March 2014 quarter will address smelter performance. Copper production at Olympic Dam for the 2014 financial year is expected to be in line with the prior year.
On 11 October 2013, BHP Billiton completed the sale of its Pinto Valley (US) mining operation and the associated San Manuel Arizona Railroad Company to Capstone Mining Corp. for US$650 million, subject to customary working capital adjustments.
Lead/silver - Lead and silver production decreased by 31 per cent and 25 per cent, respectively, from the June 2013 quarter as lower average ore grades affected performance at Cannington (Australia).
Zinc - Zinc production decreased by 38 per cent from the June 2013 quarter, driven by lower average zinc ore grades at Cannington and Antamina.
Uranium - Uranium production decreased by 12 per cent from the June 2013 quarter as a result of lower average uranium ore grades and planned maintenance at Olympic Dam.
Projects
Initial Capital production expenditure target Project and ownership (US$m) date Capacity Progress ------------------------------------------ ----------- ---------- -------------------------------------------------------------------------------- ------------------------------------- Escondida Oxide Leach Area Project (Chile) 721 (iv) H1 CY14 New dynamic leaching pad and mineral handling system. Maintains oxide leaching c On schedule and budget. The overall p apacity. roject is 76% complete. 57.5% ------------------------------------------ ----------- ---------- -------------------------------------------------------------------------------- ------------------------------------- Escondida Organic Growth Project 1 (Chile) 3,838 (iv) H1 CY15 Replaces the Los Colorados concentrator with a new 152,000 tonnes per day plant. On schedule and budget. The overall p roject is 51% complete. 57.5% ------------------------------------------ ----------- ---------- -------------------------------------------------------------------------------- ------------------------------------- Escondida Water Supply (Chile) 3,430 (iv) CY17 New desalination facility to ensure continued water supply to Escondida. Approval announced. See news release dated 25 July 2013. 57.5% ------------------------------------------ ----------- ---------- -------------------------------------------------------------------------------- -------------------------------------
(iv) Following the application of IFRS 10 from 1 July 2013, references to BHP Billiton share include 100 per cent of Escondida.
Iron Ore
Production
SEP SEP Q13 SEP Q13 2013 vs vs QTR SEP Q12 JUN Q13 ----------------------- ------ --------- --------- Iron ore ('000 tonnes) 48,848 23% 2% ----------------------- ------ --------- ---------
Iron ore- Iron ore production increased by 23 per cent in the September 2013 quarter to 49 million tonnes (BHP Billiton share).
WAIO achieved record production of 54 million tonnes (100 per cent basis) for the September 2013 quarter. Continued strong operating performance across the supply chain and the successful delivery of first production from the Jimblebar mine, ahead of schedule, contributed to the record result. The ramp up of phase one capacity at Jimblebar to 35 mtpa is expected to be completed by the end of the 2015 financial year.
The optimisation of the supply chain in the Pilbara continues to unlock substantial value and WAIO is now expected to produce 212 million tonnes (100 per cent basis) in the 2014 financial year, a five million tonne increase on prior guidance. Longer term, a low cost option to expand Jimblebar to 55 mtpa and the broader debottlenecking of the supply chain is expected to underpin further capital efficient growth in capacity to approximately 260 mtpa to 270 mtpa (100 per cent basis).
Samarco's (Brazil) three pellet plants continued to operate at capacity during the period.
Total iron ore production for the 2014 financial year, which includes Samarco, is now expected to increase to 192 million tonnes (BHP Billiton share).
Projects
Initial Capital production expenditure target Project and ownership (US$m) date Capacity Progress ----------------------------------------- ----------- ---------- -------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------ WAIO Jimblebar Mine Expansion (Australia) 3,220 (v) Q4 CY13 Increases mining and processing capacity to 35 million tonnes per annum with incremental debottlenecking First production achieved in Q3 CY13, ahead of schedule and on revised budget. opportunities to 55 million tonnes per annum. The overall project is 96% complete. 85% ----------------------------------------- ----------- ---------- -------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------ WAIO Port Blending and Rail Yard 1,000 (v) H2 CY14 Optimises resource and enhances efficiency across the WAIO supply chain. On schedule and budget on the basis of the revised scope. The overall project Facilities (Australia) is 93% complete. 85% ----------------------------------------- ----------- ---------- -------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------ Samarco Fourth Pellet Plant (Brazil) 1,750 H1 CY14 Increases iron ore pellet production capacity by 8.3 million tonnes per annum to 30.5 million On schedule and budget. The overall project is 95% complete. tonnes per annum. 50% ----------------------------------------- ----------- ---------- -------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------
(v) Excludes announced pre-commitment funding.
Coal
Production
SEP SEP Q13 SEP Q13 2013 vs vs QTR SEP Q12 JUN Q13 --------------------------------- ------ --------- --------- Metallurgical coal ('000 tonnes) 10,185 14% -6% --------------------------------- ------ --------- --------- Energy coal ('000 tonnes) 19,639 3% 6% --------------------------------- ------ --------- ---------
Metallurgical coal - Metallurgical coal production increased by 14 per cent in the September 2013 quarter to 10 million tonnes (BHP Billiton share).
Queensland Coal (Australia) continued to run at full supply chain capacity during the period with annualised production of 61 million tonnes (100 per cent basis). This strong result was underpinned by the continued ramp up of Daunia, record quarterly production at South Walker Creek and improved Coal Preparation Plant performance at Blackwater and Saraji. This was partially offset by a planned longwall move at Crinum and scheduled Coal Preparation Plant maintenance at Goonyella Riverside and Peak Downs.
Illawarra Coal (Australia) production decreased by 39 per cent from the June 2013 quarter and reflected an extended outage at Dendrobium and a scheduled longwall move at West Cliff. Despite a roof fall at Dendrobium in October 2013, production is expected to improve in the December 2013 quarter, with total Illawarra Coal production weighted towards the second half of the 2014 financial year.
Total metallurgical coal production guidance for the 2014 financial year remains unchanged at 41 million tonnes (BHP Billiton share).
Energy coal - Energy coal production increased by three per cent in the September 2013 quarter to 20 million tonnes (BHP Billiton share). Record quarterly production at both New South Wales Energy Coal (Australia) and Cerrejon Coal (Colombia) contributed to the strong result.
Total energy coal production guidance for the 2014 financial year remains unchanged at 73 million tonnes (BHP Billiton share).
Projects
Initial Capital production expenditure target Project and ownership (US$m) date Capacity Progress ------------------------------------------- ----------- ---------- ------------------------------------------------------------------------------------------------------ ------------------------------------- Cerrejon P40 Project (Colombia) 437 CY13 Increases saleable thermal coal production by 8 million tonnes per annum to approximately On schedule and budget. The overall p 40 million tonnes per annum. roject is 79% complete. 33.3% ------------------------------------------- ----------- ---------- ------------------------------------------------------------------------------------------------------ ------------------------------------- Newcastle Third Port Project Stage 3 367 CY14 Increases total coal terminal capacity from 53 million tonnes per annum to 66 million tonnes First coal was loaded in Q2 CY13 and (Australia) per annum. mechanical completion was achieved in 35.5% Q3 CY13, ahead of schedule and on budget. The overall project is 76% complete. ------------------------------------------- ----------- ---------- ------------------------------------------------------------------------------------------------------ ------------------------------------- Caval Ridge (Australia) 1,870 (vi) CY14 Greenfield mine development to produce an initial 5.5 million tonnes per annum of export metallurgical On schedule and budget. The overall p coal. roject is 86% complete. 50% ------------------------------------------- ----------- ---------- ------------------------------------------------------------------------------------------------------ ------------------------------------- Hay Point Stage Three Expansion (Australia) 1,505 (vi) CY15 Increases port capacity from 44 million tonnes per annum to 55 million tonnes per annum and On revised schedule and budget. The o reduces storm vulnerability. verall project is 72% complete. 50% ------------------------------------------- ----------- ---------- ------------------------------------------------------------------------------------------------------ ------------------------------------- Appin Area 9 (Australia) 845 CY16 Maintains Illawarra Coal's production capacity with a replacement mining domain and capacity On schedule and budget. The overall p to produce 3.5 million tonnes per annum of metallurgical coal. roject is 51% complete. 100% ------------------------------------------- ----------- ---------- ------------------------------------------------------------------------------------------------------ -------------------------------------
(vi) Excludes announced pre-commitment funding.
Aluminium, Manganese and Nickel
Production
SEP SEP Q13 SEP Q13 2013 vs vs QTR SEP Q12 JUN Q13 ------------------------------ ------ --------- --------- Alumina ('000 tonnes) 1,251 7% -1% ------------------------------ ------ --------- --------- Aluminium ('000 tonnes) 310 15% 0% ------------------------------ ------ --------- --------- Manganese ore ('000 tonnes) 2,046 -5% -9% ------------------------------ ------ --------- --------- Manganese alloy ('000 tonnes) 137 5% -25% ------------------------------ ------ --------- --------- Nickel ('000 tonnes) 40.4 9% 0% ------------------------------ ------ --------- ---------
Alumina - Alumina production increased by seven per cent in the September 2013 quarter to 1.3 million tonnes (BHP Billiton share) as the Efficiency and Growth project at Worsley (Australia) approached nameplate capacity.
Aluminium - Aluminium production increased by 15 per cent in the September 2013 quarter to 310 thousand tonnes (BHP Billiton share). Production benefited from strong operating performance at our Southern African smelters which included a second consecutive quarterly production record at Hillside (South Africa).
Manganese ore - Manganese ore production decreased during the September 2013 quarter due to a planned shutdown at Hotazel (South Africa) and lower recoveries at GEMCO (Australia).
Manganese alloy - Manganese alloy volumes increased by five per cent from the September 2012 quarter which was affected by the temporary suspension of operations at TEMCO (Australia). Planned maintenance at Metalloys (South Africa) and TEMCO contributed to the 25 per cent decline in manganese alloy volumes from the June 2013 quarter.
Nickel - Nickel production increased by nine per cent in the September 2013 quarter to 40 thousand tonnes (BHP Billiton share) and reflected strong operating performance at Nickel West (Australia).
Minerals exploration
Greenfield minerals exploration is focused on advancing copper targets within Chile and Peru. Minerals exploration expenditure in the September 2013 quarter was US$115 million, of which US$105 million was expensed (vii).
(vii) Reported on the basis of IFRS 10 which requires the full consolidation of Escondida, as compared to the proportional consolidation of our 57.5 per cent equity interest which has been applied historically.
This report represents the Interim Management Statement for the purposes of the UK Listing Authority's Disclosure and Transparency Rules. There have been no significant changes in the financial position of the Group in the quarter ended 30 September 2013.
Further information on BHP Billiton can be found at: www.bhpbilliton.com
Media Relations Investor Relations Australia Australia Emily Perry James Agar Tel: +61 3 9609 2800 Mobile: +61 477 325 803 Tel: +61 3 9609 2222 Mobile: +61 467 807 064 email: Emily.Perry@bhpbilliton.com email: James.Agar@bhpbilliton.com Fiona Hadley Andrew Gunn Tel: +61 3 9609 2211 Mobile: +61 427 777 908 Tel: +61 3 9609 3575 Mobile: +61 402 087 354 email: Fiona.Hadley@bhpbilliton.com email: Andrew.Gunn@bhpbilliton.com Eleanor Nichols United Kingdom and South Africa Tel: +61 3 9609 2360 Mobile: +61 407 064 748 email: Eleanor.Nichols@bhpbilliton.com Tara Dines Tel: +44 20 7802 7113 Mobile: +44 7825 342 232 United Kingdom Email: Tara.Dines@bhpbilliton.com Ruban Yogarajah Americas Tel: +44 20 7802 4033 Mobile: +44 7827 082 022 email: Ruban.Yogarajah@bhpbilliton.com James Agar Tel: +61 3 9609 2222 Mobile: +61 467 807 064 Jennifer White email: James.Agar@bhpbilliton.com Tel: +44 20 7802 7462 Mobile: +44 7827 253 764 email: Jennifer.White@bhpbilliton.com Matt Chism Tel: +1 71 359 96158 Mobile: +1 281 782 2238 Americas email: Matt.E.Chism@bhpbilliton.com Jaryl Strong Tel: +1 713 499 5548 Mobile: +1 281 222 6627 email: Jaryl.Strong@bhpbilliton.com BHP Billiton Limited ABN 49 004 028 077 BHP Billiton Plc Registration number 3196209 Registered in Australia Registered in England and Wales Registered Office: Level 16, 171 Collins Registered Office: Neathouse Place Street London SW1V 1BH United Kingdom Melbourne Victoria 3000 Australia Tel +44 20 7802 4000 Fax +44 20 7802 4111 Tel +61 1300 55 4757 Fax +61 3 9609 3015 Members of the BHP Billiton Group which is headquartered in Australia BHP BILLITON PRODUCTION SUMMARY ------------------------------------------------------------------------------------------------------------------------------------- QUARTER ENDED YEAR TO DATE % CHANGE --------------------------------------------- ---------------------------- ------------------ SEP SEP Q13 Q13 SEP JUN SEP SEP SEP vs vs 2012 2013 2013 2013 2012 SEP JUN Q12 Q13 --------------- ------------- ------------- ------------- ------------- ------- --------- PETROLEUM Crude oil & condensate ('000 bbl) 18,036 18,559 20,421 20,421 18,036 13% 10% Natural gas (bcf) 232.85 214.49 219.66 219.66 232.85 -6% 2% NGL ('000 boe) 4,411 4,882 5,632 5,632 4,411 28% 15% Total petroleum (million products boe) 61.3 59.2 62.7 62.7 61.3 2% 6% COPPER Copper ('000 tonnes) 379.4 461.7 403.3 403.3 379.4 6% -13% Lead (tonnes) 52,183 67,034 46,445 46,445 52,183 -11% -31% Zinc (tonnes) 25,922 45,881 28,555 28,555 25,922 10% -38% Gold (ounces) 39,968 56,070 45,045 45,045 39,968 13% -20% Silver ('000 ounces) 9,446 11,602 8,688 8,688 9,446 -8% -25% Uranium oxide concentrate (tonnes) 1,030 1,105 970 970 1,030 -6% -12% Molybdenum (tonnes) 454 376 458 458 454 1% 22% IRON ORE Iron Ore ('000 tonnes) 39,772 47,689 48,848 48,848 39,772 23% 2% COAL Metallurgical coal ('000 tonnes) 8,938 10,858 10,185 10,185 8,938 14% -6% Energy coal ('000 tonnes) 19,144 18,561 19,639 19,639 19,144 3% 6% ALUMINIUM, MANGANESE AND NICKEL Alumina ('000 tonnes) 1,170 1,265 1,251 1,251 1,170 7% -1% Aluminium ('000 tonnes) 269 310 310 310 269 15% 0% Manganese ore ('000 tonnes) 2,146 2,246 2,046 2,046 2,146 -5% -9% Manganese alloy ('000 tonnes) 130 182 137 137 130 5% -25% Nickel ('000 tonnes) 37.0 40.3 40.4 40.4 37.0 9% 0%
Throughout this report figures in italics indicate that this figure has been adjusted since it was previously reported.
BHP BILLITON ATTRIBUTABLE PRODUCTION -------------------------------------------------------------------------------------------------------------------------------------------------------- QUARTER ENDED YEAR TO DATE -------------------------------------------------------------------------------------- -------------------------------- BHP Billiton SEP DEC MAR JUN SEP SEP SEP interest 2012 2012 2013 2013 2013 2013 2012 ------------------ --------- ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- PETROLEUM Production Crude oil and condensate ('000 bbl) 18,036 19,228 16,689 18,559 20,421 20,421 18,036 Natural gas (bcf) 232.85 219.66 207.27 214.49 219.66 219.66 232.85 NGL ('000 boe) (a) 4,411 4,064 4,182 4,882 5,632 5,632 4,411 Total petroleum products (million boe) 61.3 59.9 55.4 59.2 62.7 62.7 61.3 ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- COPPER (b) COPPER Payable metal in concentrate ('000 tonnes) Escondida (c) 57.5% 176.0 209.9 222.6 223.0 205.1 205.1 176.0 Antamina 33.8% 40.2 39.6 25.2 34.7 41.9 41.9 40.2 Pinto Valley 100% - 0.5 5.3 10.8 10.9 10.9 - Total 216.2 250.0 253.1 268.5 257.9 257.9 216.2 ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- Cathode ('000 tonnes) Escondida (c) 57.5% 72.3 71.0 75.3 79.3 73.2 73.2 72.3 Pampa Norte (d) 100% 52.7 58.8 56.4 64.7 43.5 43.5 52.7 Pinto Valley 100% 1.2 1.2 1.2 1.3 0.8 0.8 1.2 Olympic Dam 100% 37.0 33.6 47.7 47.9 27.9 27.9 37.0 Total 163.2 164.6 180.6 193.2 145.4 145.4 163.2 Total Copper 379.4 414.6 433.7 461.7 403.3 403.3 379.4 ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- LEAD Payable metal in concentrate (tonnes) Cannington 100% 51,923 45,937 48,899 66,666 46,287 46,287 51,923 Antamina 33.8% 260 198 181 368 158 158 260 Total 52,183 46,135 49,080 67,034 46,445 46,445 52,183 ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- ZINC Payable metal in concentrate (tonnes) Cannington 100% 11,408 13,622 11,045 20,206 16,033 16,033 11,408 Antamina 33.8% 14,514 12,587 19,148 25,675 12,522 12,522 14,514 Total 25,922 26,209 30,193 45,881 28,555 28,555 25,922 ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- GOLD Payable metal in concentrate (ounces) Escondida (c) 57.5% 16,951 18,359 18,626 17,593 17,347 17,347 16,951 Olympic Dam (refined gold) 100% 23,017 24,215 27,531 38,477 27,649 27,649 23,017 Pinto Valley 100% - - - - 49 49 - Total 39,968 42,574 46,157 56,070 45,045 45,045 39,968 ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- SILVER Payable metal in concentrate ('000 ounces) Escondida (c) 57.5% 631 696 743 890 891 891 631 Antamina 33.8% 919 934 802 1,297 1,205 1,205 919 Cannington 100% 7,689 6,949 7,323 9,101 6,361 6,361 7,689 Olympic Dam (refined silver) 100% 207 193 214 266 190 190 207 Pinto Valley 100% - - 11 48 41 41 - Total 9,446 8,772 9,093 11,602 8,688 8,688 9,446 ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- URANIUM OXIDE CONCENTRATE Payable metal in concentrate (tonnes) Olympic Dam 100% 1,030 1,005 926 1,105 970 970 1,030 Total 1,030 1,005 926 1,105 970 970 1,030 ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- MOLYBDENUM Payable metal in concentrate (tonnes) Antamina 33.8% 454 410 321 376 458 458 454 Total 454 410 321 376 458 458 454 ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- Refer footnotes on page 15. IRON ORE Production ('000 tonnes) (e) Newman (f) 85% 11,752 12,809 13,028 15,408 15,362 15,362 11,752 Goldsworthy Joint Venture 85% 432 378 296 - 202 202 432 Area C Joint Venture 85% 10,937 10,245 10,983 12,552 11,814 11,814 10,937 Yandi Joint Venture 85% 13,771 15,954 13,302 17,027 18,146 18,146 13,771 Jimblebar 85% - - - - 595 595 - Samarco 50% 2,880 2,804 2,596 2,702 2,729 2,729 2,880 Total 39,772 42,190 40,205 47,689 48,848 48,848 39,772 ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- COAL METALLURGICAL COAL Production ('000 tonnes) (g) BMA 50% 5,182 5,440 5,327 6,696 6,705 6,705 5,182 BHP Mitsui Coal (h) 80% 1,766 1,589 1,862 1,846 2,057 2,057 1,766 Illawarra 100% 1,990 1,859 1,777 2,316 1,423 1,423 1,990 Total 8,938 8,888 8,966 10,858 10,185 10,185 8,938 ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- ENERGY COAL Production ('000 tonnes) South Africa (i) 90% 8,454 7,969 7,302 7,902 7,937 7,937 8,454 USA 100% 3,408 3,280 3,351 2,752 3,145 3,145 3,408 Australia 100% 4,453 4,827 3,837 4,893 5,372 5,372 4,453 Colombia 33% 2,829 2,662 1,512 3,014 3,185 3,185 2,829 Total 19,144 18,738 16,002 18,561 19,639 19,639 19,144 ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- ALUMINIUM, MANGANESE AND NICKEL ALUMINA Saleable production ('000 tonnes) Worsley 86% 859 944 911 961 946 946 859 Alumar 36% 311 288 302 304 305 305 311 Total 1,170 1,232 1,213 1,265 1,251 1,251 1,170 ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- ALUMINIUM Production ('000 tonnes) Hillside 100% 139 167 178 181 184 184 139 Bayside 100% 24 24 24 24 24 24 24 Alumar 40% 39 39 37 39 35 35 39 Mozal 47% 67 67 64 66 67 67 67 Total 269 297 303 310 310 310 269 ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- MANGANESE ORES Saleable production ('000 tonnes) South Africa (j) 44.4% 858 834 859 939 864 864 858 Australia (j) 60% 1,288 1,283 1,149 1,307 1,182 1,182 1,288 Total 2,146 2,117 2,008 2,246 2,046 2,046 2,146 ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- MANGANESE ALLOYS Saleable production ('000 tonnes) South Africa (j) (k) 60% 93 91 86 104 86 86 93 Australia (j) 60% 37 62 57 78 51 51 37 Total 130 153 143 182 137 137 130 ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- NICKEL Saleable production ('000 tonnes) Cerro Matoso 99.9% 13.3 12.4 12.3 12.8 12.0 12.0 13.3 Nickel West 100% 23.7 22.3 29.8 27.5 28.4 28.4 23.7 Total 37.0 34.7 42.1 40.3 40.4 40.4 37.0 ---------------- ---------------- ---------------- ---------------- -------------- -------------- ----------------
Refer footnotes on page 15
(a) LPG and ethane are reported as Natural Gas Liquid (NGL). Product-specific conversions are made and NGL is reported in barrels of oil equivalent (boe).
(b) Metal production is reported on the basis of payable metal.
(c) Shown on 100% basis following the application of the new IFRS 10 which came into effect from 1 July 2013. BHP Billiton interest in saleable production is 57.5%.
(d) Includes Cerro Colorado and Spence.
(e) Iron ore production is reported on a wet tonnes basis.
(f) Newman includes Mt Newman Joint Venture and Wheelarra.
(g) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.
(h) Shown on 100% basis. BHP Billiton interest in saleable production is 80%.
(i) Shown on 100% basis. BHP Billiton interest in saleable production is 90%.
(j) Shown on 100% basis. BHP Billiton interest in saleable production is 60%, except Hotazel Manganese Mines which is 44.4%.
(k) Production includes Medium Carbon Ferro Manganese.
PRODUCTION AND SALES REPORT -------------------- QUARTER ENDED YEAR TO DATE ----------------------------------------------------------------------------------- -------------------------------- SEP DEC MAR JUN SEP SEP SEP 2012 2012 2013 2013 2013 2013 2012 ------------------ ---------------- -------------- -------------- ---------------- --------------- ---------------- -------------- PETROLEUM BHP Billiton attributable production unless otherwise stated. CRUDE OIL & CONDENSATE ('000 barrels) Bass Strait 2,569 2,081 1,934 2,229 2,247 2,247 2,569 North West Shelf 1,867 1,829 1,526 1,646 1,865 1,865 1,867 Stybarrow 534 464 323 401 348 348 534 Pyrenees 2,605 2,379 1,659 1,817 1,707 1,707 2,605 Other Australia (a) 17 15 15 12 14 14 17 Atlantis (b) 1,554 2,376 1,471 2,594 2,953 2,953 1,554 Mad Dog (b) 369 906 791 649 732 732 369 Shenzi (b) 3,783 4,008 3,580 3,378 3,467 3,467 3,783 Onshore US (c) 2,358 2,658 3,071 3,614 5,044 5,044 2,358 Trinidad/Tobago 376 362 331 259 320 320 376 Other Americas (b) (d) 367 410 384 403 378 378 367 UK (e) 260 355 326 282 142 142 260 Algeria 1,309 1,316 1,207 1,210 1,142 1,142 1,309 Pakistan 68 69 71 65 62 62 68 Total 18,036 19,228 16,689 18,559 20,421 20,421 18,036 ---------------- -------------- -------------- ---------------- --------------- ---------------- -------------- NATURAL GAS (billion cubic feet) Bass Strait 40.06 26.67 23.38 33.63 34.20 34.20 40.06 North West Shelf 35.33 34.09 31.29 30.29 34.18 34.18 35.33 Other Australia (a) 6.20 5.48 5.17 4.54 9.32 9.32 6.20 Atlantis (b) 0.59 0.89 0.54 0.83 1.26 1.26 0.59 Mad Dog (b) 0.06 0.18 0.15 0.05 0.11 0.11 0.06 Shenzi (b) 2.11 0.94 0.81 0.78 0.80 0.80 2.11 Onshore US (c) 122.59 123.03 115.69 118.08 114.89 114.89 122.59 Trinidad/Tobago 9.21 9.15 8.84 9.07 9.90 9.90 9.21 Other Americas (b) (d) 0.35 0.48 0.59 0.29 0.27 0.27 0.35 UK (e) 3.29 5.26 6.44 4.09 3.47 3.47 3.29 Pakistan 13.06 13.49 14.37 12.84 11.26 11.26 13.06 Total 232.85 219.66 207.27 214.49 219.66 219.66 232.85 ---------------- -------------- -------------- ---------------- --------------- ---------------- -------------- NGL ('000 barrels of oil equivalent) Bass Strait 2,053 1,342 1,405 1,753 2,001 2,001 2,053 North West Shelf 385 354 323 312 399 399 385 Atlantis (b) 54 209 96 200 255 255 54 Mad Dog (b) 16 72 55 - 38 38 16 Shenzi (b) 370 324 269 224 266 266 370 Onshore US (c) 1,516 1,736 2,004 2,375 2,656 2,656 1,516 Other Americas (b) (d) 17 16 13 9 11 11 17 UK (e) - 11 17 9 6 6 - Total 4,411 4,064 4,182 4,882 5,632 5,632 4,411 ---------------- -------------- -------------- ---------------- --------------- ---------------- -------------- TOTAL PETROLEUM PRODUCTS 61.3 59.9 55.4 59.2 62.7 62.7 61.3 ---------------- -------------- -------------- ---------------- --------------- ---------------- -------------- (million barrels of oil equivalent) (f)
(a) Other Australia includes Minerva and Macedon. Macedon achieved first production in August 2013.
(b) Gulf of Mexico volumes are net of royalties.
(c) Onshore US volumes are net of mineral holder royalties.
(d) Other Americas includes Neptune, Genesis and Overriding Royalty Interest.
(e) An agreement to sell Liverpool Bay was reached in October 2013 and the transaction is expected to close before the end of the 2014 financial year.
(f) Total barrels of oil equivalent (boe) conversions are based on 6,000 scf of natural gas equals 1 boe.
PRODUCTION AND SALES REPORT -------------------------------- QUARTER ENDED YEAR TO DATE -------------------------------------------------------------------------------------- -------------------------------- SEP DEC MAR JUN SEP SEP SEP 2012 2012 2013 2013 2013 2013 2012 ------------- --------------- ---------------- ---------------- ---------------- ---------------- -------------- -------------- ---------------- COPPER BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless otherwise stated. Escondida, Chile (a) Material mined ('000 tonnes) 102,499 96,938 94,567 98,665 93,744 93,744 102,499 Sulphide ore milled ('000 tonnes) 16,850 18,796 18,964 19,295 18,276 18,276 16,850 Average copper grade (%) 1.35% 1.39% 1.44% 1.42% 1.37% 1.37% 1.35% Production ex mill ('000 tonnes) 185.2 216.6 229.3 231.9 210.6 210.6 185.2 Production Payable copper ('000 tonnes) 176.0 209.9 222.6 223.0 205.1 205.1 176.0 Payable gold concentrate (fine ounces) 16,951 18,359 18,626 17,593 17,347 17,347 16,951 Copper cathode (EW) ('000 tonnes) 72.3 71.0 75.3 79.3 73.2 73.2 72.3 Payable silver concentrate ('000 ounces) 631 696 743 890 891 891 631 Sales Payable copper ('000 tonnes) 165.6 226.6 215.8 228.2 192.3 192.3 165.6 Payable gold concentrate (fine ounces) 15,650 19,235 18,325 15,831 12,490 12,490 15,650 Copper cathode (EW) ('000 tonnes) 67.5 81.4 59.1 95.0 63.0 63.0 67.5 Payable silver concentrate ('000 ounces) 563 772 720 908 836 836 563 (a) Shown on 100% basis following the application of the new IFRS 10 which came into effect from 1 July 2013. BHP Billiton interest in saleable production is 57.5%. Pampa Norte, Chile Cerro Colorado Material mined ('000 tonnes) 16,067 15,722 14,964 16,303 15,771 15,771 16,067 Ore milled ('000 tonnes) 4,505 4,206 4,350 4,351 4,161 4,161 4,505 Average copper grade (%) 0.55% 0.66% 0.65% 0.82% 0.78% 0.78% 0.55% Production Copper cathode (EW) ('000 tonnes) 17.8 17.9 14.6 21.2 17.6 17.6 17.8 Sales Copper cathode (EW) ('000 tonnes) 16.1 18.8 13.7 21.7 17.3 17.3 16.1 Spence Material mined ('000 tonnes) 27,541 25,999 28,861 28,646 24,331 24,331 27,541 Ore milled ('000 tonnes) 3,752 4,161 4,041 4,146 4,860 4,860 3,752 Average copper grade (%) 1.17% 1.29% 1.38% 1.16% 1.11% 1.11% 1.17% Production Copper cathode (EW) ('000 tonnes) 34.9 40.9 41.8 43.5 25.9 25.9 34.9 Sales Copper cathode (EW) ('000 tonnes) 31.1 42.6 29.8 57.9 25.9 25.9 31.1 Antamina, Peru Material mined (100%) ('000 tonnes) 54,482 49,246 48,032 56,254 56,428 56,428 54,482 Sulphide ore milled (100%) ('000 tonnes) 12,274 11,752 10,330 12,424 11,765 11,765 12,274 Average head grades - Copper (%) 1.15% 1.16% 0.88% 1.03% 1.21% 1.21% 1.15% - Zinc (%) 0.66% 0.64% 0.93% 1.02% 0.56% 0.56% 0.66% Production Payable copper ('000 tonnes) 40.2 39.6 25.2 34.7 41.9 41.9 40.2 Payable zinc (tonnes) 14,514 12,587 19,148 25,675 12,522 12,522 14,514 Payable silver ('000 ounces) 919 934 802 1,297 1,205 1,205 919 Payable lead (tonnes) 260 198 181 368 158 158 260 Payable molybdenum (tonnes) 454 410 321 376 458 458 454 Sales Payable copper ('000 tonnes) 39.7 42.7 24.1 31.9 41.3 41.3 39.7 Payable zinc (tonnes) 15,519 17,874 16,062 22,560 16,123 16,123 15,519 Payable silver ('000 ounces) 849 1,101 772 1,165 1,503 1,503 849 Payable lead (tonnes) 330 276 115 262 297 297 330 Payable molybdenum (tonnes) 536 381 371 283 411 411 536 Cannington, Australia Material mined ('000 tonnes) 717 817 810 802 893 893 717 Ore milled ('000 tonnes) 773 793 713 866 750 750 773 Average head grades - Silver (g/t) 355 317 364 401 315 315 355 - Lead (%) 7.6% 7.0% 7.7% 9.1% 7.4% 7.4% 7.6% - Zinc (%) 2.5% 2.9% 2.7% 3.8% 3.2% 3.2% 2.5% Production Payable silver ('000 ounces) 7,689 6,949 7,323 9,101 6,361 6,361 7,689 Payable lead (tonnes) 51,923 45,937 48,899 66,666 46,287 46,287 51,923 Payable zinc (tonnes) 11,408 13,622 11,045 20,206 16,033 16,033 11,408 Sales Payable silver ('000 ounces) 8,506 6,694 7,265 7,793 7,844 7,844 8,506 Payable lead (tonnes) 59,042 46,319 48,661 64,633 56,500 56,500 59,042 Payable zinc (tonnes) 10,379 16,321 9,439 21,056 17,286 17,286 10,379 Olympic Dam, Australia Material mined (a) ('000 tonnes) 2,226 2,123 2,448 2,750 2,897 2,897 2,226 Ore milled ('000 tonnes) 2,471 2,435 2,353 2,641 2,404 2,404 2,471 Average copper grade (%) 1.90% 1.71% 1.73% 1.86% 1.85% 1.85% 1.90% Average uranium grade (kg/t) 0.54 0.51 0.50 0.56 0.53 0.53 0.54 Production Copper cathode (ER) ('000 tonnes) 34.0 30.4 44.7 45.1 25.9 25.9 34.0 Copper cathode (EW) ('000 tonnes) 3.0 3.2 3.0 2.8 2.0 2.0 3.0 Uranium oxide concentrate (tonnes) 1,030 1,005 926 1,105 970 970 1,030 Refined gold (fine ounces) 23,017 24,215 27,531 38,477 27,649 27,649 23,017 Refined silver ('000 ounces) 207 193 214 266 190 190 207 Sales Copper cathode (ER) ('000 tonnes) 35.1 33.2 40.1 46.4 26.8 26.8 35.1 Copper cathode (EW) ('000 tonnes) 3.4 2.7 3.1 3.5 2.1 2.1 3.4 Uranium oxide concentrate (tonnes) 615 1,343 816 1,374 930 930 615 Refined gold (fine ounces) 20,949 25,227 24,678 38,394 21,675 21,675 20,949 Refined silver ('000 ounces) 265 169 211 275 176 176 265 (a) Material mined refers to run of mine ore mined and hoisted. Pinto Valley, US (a) Production Payable copper ('000 tonnes) - 0.5 5.3 10.8 10.9 10.9 - Copper cathode (EW) ('000 tonnes) 1.2 1.2 1.2 1.3 0.8 0.8 1.2 Payable silver ('000 ounces) - - 11 48 41 41 - Payable gold (ounces) - - - - 49 49 - Sales Payable copper ('000 tonnes) - - 2.6 9.9 7.3 7.3 - Copper cathode (EW) ('000 tonnes) 1.2 1.2 1.1 1.4 1.1 1.1 1.2 Payable silver ('000 ounces) - - 11 48 41 41 - Payable gold (ounces) - - - - 49 49 -
(a) On 11 October 2013 BHP Billiton completed the sale of its Pinto Valley operations.
PRODUCTION AND SALES REPORT ----------------------------------- QUARTER ENDED YEAR TO DATE ------------------------------------------------------------------------------------- ------------------------------- SEP DEC MAR JUN SEP SEP SEP 2012 2012 2013 2013 2013 2013 2012 --- ----------------- ------- ---------------- ---------------- ---------------- ---------------- ------------- ------------- ---------------- IRON ORE BHP Billiton attributable production and sales unless otherwise stated. ('000 tonnes) IRON ORE Pilbara, Australia Production (a) Newman (b) 11,752 12,809 13,028 15,408 15,362 15,362 11,752 Goldsworthy Joint Venture 432 378 296 - 202 202 432 Area C Joint Venture 10,937 10,245 10,983 12,552 11,814 11,814 10,937 Yandi Joint Venture 13,771 15,954 13,302 17,027 18,146 18,146 13,771 Jimblebar - - - - 595 595 - Total (BHP Billiton share) 36,892 39,386 37,609 44,987 46,119 46,119 36,892 ---------------- ---------------- ---------------- ---------------- ------------- ------------- ---------------- Total production (100%) 43,403 46,337 44,245 52,926 54,258 54,258 43,403 Sales Lump 8,338 9,806 9,339 11,284 10,292 10,292 8,338 Fines 28,718 30,479 28,370 34,621 35,235 35,235 28,718 Total (BHP Billiton share) 37,056 40,285 37,709 45,905 45,527 45,527 37,056 ---------------- ---------------- ---------------- ---------------- ------------- ------------- ---------------- Total sales (100%) 43,595 47,393 44,363 54,006 53,561 53,561 43,595 (a) Iron ore production and sales are reported on a wet tonnes basis. (b) Newman includes Mt Newman Joint Venture and Wheelarra. Samarco, Brazil Production (a) 2,880 2,804 2,596 2,702 2,729 2,729 2,880 Sales 2,622 3,227 2,515 2,651 2,676 2,676 2,622
(a) Iron ore production and sales are reported on a wet tonnes basis.
PRODUCTION AND SALES REPORT ----------------- QUARTER ENDED YEAR TO DATE --------------------------------------------------------------------------------- ------------------------------- SEP DEC MAR JUN SEP SEP SEP 2012 2012 2013 2013 2013 2013 2012 --------------- ---------------- ---------------- -------------- -------------- ------------- ------------- ---------------- COAL BHP Billiton attributable production and sales unless otherwise stated. ('000 tonnes) METALLURGICAL COAL Queensland, Australia Production (a) BMA Blackwater 1,148 1,588 1,157 1,539 1,691 1,691 1,148 Goonyella 1,535 1,392 1,478 1,816 1,737 1,737 1,535 Peak Downs 1,029 1,151 1,225 1,140 1,112 1,112 1,029 Saraji 773 994 711 971 1,197 1,197 773 Gregory Joint Venture (b) 697 315 657 854 464 464 697 Daunia - - 99 376 504 504 - BMA total 5,182 5,440 5,327 6,696 6,705 6,705 5,182 ---------------- ---------------- -------------- -------------- ------------- ------------- ---------------- BHP Mitsui Coal (c) South Walker Creek 1,084 864 1,188 1,215 1,298 1,298 1,084 Poitrel 682 725 674 631 759 759 682 BHP Mitsui Coal total 1,766 1,589 1,862 1,846 2,057 2,057 1,766 ------------- ---------------- Queensland total 6,948 7,029 7,189 8,542 8,762 8,762 6,948 ---------------- ---------------- -------------- -------------- ------------- ------------- ---------------- Sales Coking coal 4,058 5,561 4,933 6,316 6,123 6,123 4,058 Weak coking coal 1,545 1,820 2,029 2,417 2,397 2,397 1,545 Thermal coal 239 237 75 30 160 160 239 Total 5,842 7,618 7,037 8,763 8,680 8,680 5,842 ---------------- ---------------- -------------- -------------- ------------- ------------- ---------------- (a) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal. (b) Gregory open-cut ceased production on 10 October 2012. (c) Shown on 100% basis. BHP Billiton interest in saleable production is 80%. Illawarra, Australia Production (a) 1,990 1,859 1,777 2,316 1,423 1,423 1,990 Sales Coking coal 1,775 1,785 1,595 1,877 1,084 1,084 1,775 Thermal coal 502 327 145 436 359 359 502 Total 2,277 2,112 1,740 2,313 1,443 1,443 2,277 ---------------- ---------------- -------------- -------------- ------------- ------------- ----------------
(a) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.
ENERGY COAL South Africa (a) Production 8,454 7,969 7,302 7,902 7,937 7,937 8,454 Sales Export 3,385 3,583 3,604 3,363 2,504 2,504 3,385 Local utility 4,869 4,615 4,171 4,353 4,543 4,543 4,869 Inland 38 28 32 24 - - 38 Total 8,292 8,226 7,807 7,740 7,047 7,047 8,292 -------------- -------------- -------------- -------------- ---------------- ---------------- -------------- (a) Shown on 100% basis. BHP Billiton interest in saleable product is 90%. New Mexico, US Production Navajo Coal 1,943 2,012 1,944 1,569 1,670 1,670 1,943 San Juan Coal 1,465 1,268 1,407 1,183 1,475 1,475 1,465 Total 3,408 3,280 3,351 2,752 3,145 3,145 3,408 -------------- -------------- -------------- -------------- ---------------- ---------------- -------------- Sales - local utility 3,420 3,265 3,275 2,815 3,129 3,129 3,420 NSW Energy Coal, Australia Production 4,453 4,827 3,837 4,893 5,372 5,372 4,453 Sales Export 4,488 4,187 4,505 4,289 4,037 4,037 4,488 Inland 250 265 174 478 446 446 250 Total 4,738 4,452 4,679 4,767 4,483 4,483 4,738 -------------- -------------- -------------- -------------- ---------------- ---------------- -------------- Cerrejon Coal, Colombia Production 2,829 2,662 1,512 3,014 3,185 3,185 2,829 Sales - export 2,630 2,702 1,774 3,157 3,155 3,155 2,630 PRODUCTION AND SALES REPORT ----------------- QUARTER ENDED YEAR TO DATE -------------------------------------------------------------------------------- -------------------------------- SEP DEC MAR JUN SEP SEP SEP 2012 2012 2013 2013 2013 2013 2012 --------------- -------------- -------------- -------------- -------------- ---------------- ---------------- -------------- ALUMINIUM, MANGANESE AND NICKEL BHP Billiton attributable production and sales unless otherwise stated. ('000 tonnes) ALUMINA Saleable production Worsley, Australia 859 944 911 961 946 946 859 Alumar, Brazil 311 288 302 304 305 305 311 Total 1,170 1,232 1,213 1,265 1,251 1,251 1,170 -------------- -------------- -------------- -------------- ---------------- ---------------- -------------- Sales Worsley, Australia 820 916 910 1,031 897 897 820 Alumar, Brazil 352 298 296 329 278 278 352 Total 1,172 1,214 1,206 1,360 1,175 1,175 1,172 -------------- -------------- -------------- -------------- ---------------- ---------------- -------------- ALUMINIUM Production Hillside, South Africa 139 167 178 181 184 184 139 Bayside, South Africa 24 24 24 24 24 24 24 Alumar, Brazil 39 39 37 39 35 35 39 Mozal, Mozambique 67 67 64 66 67 67 67 Total 269 297 303 310 310 310 269 -------------- -------------- -------------- -------------- ---------------- ---------------- -------------- Sales Hillside, South Africa 139 171 166 191 180 180 139 Bayside, South Africa 26 26 27 26 24 24 26 Alumar, Brazil 46 41 39 38 34 34 46 Mozal, Mozambique 58 65 76 65 68 68 58 Total 269 303 308 320 306 306 269 -------------- -------------- -------------- -------------- ---------------- ---------------- -------------- MANGANESE ORE Saleable production South Africa (a) 858 834 859 939 864 864 858 Australia (a) 1,288 1,283 1,149 1,307 1,182 1,182 1,288 Total 2,146 2,117 2,008 2,246 2,046 2,046 2,146 Sales South Africa (a) 878 808 835 970 920 920 878 Australia (a) 1,171 979 1,326 1,102 1,078 1,078 1,171 Total 2,049 1,787 2,161 2,072 1,998 1,998 2,049 MANGANESE ALLOY Saleable production South Africa (a) (b) 93 91 86 104 86 86 93 Australia (a) 37 62 57 78 51 51 37 Total 130 153 143 182 137 137 130 Sales South Africa (a) (b) 74 112 89 110 88 88 74 Australia (a) 46 52 68 61 54 54 46 Total 120 164 157 171 142 142 120 (a) Shown on 100% basis. BHP Billiton interest in saleable production is 60%, except Hotazel Manganese Mines which is 44.4%. (b) Production includes Medium Carbon Ferro Manganese. NICKEL Cerro Matoso, Colombia Production 13.3 12.4 12.3 12.8 12.0 12.0 13.3 Sales 12.3 13.7 13.0 13.1 12.6 12.6 12.3 Nickel West, Australia Saleable production Nickel contained in concentrate 1.3 4.1 3.1 3.0 3.4 3.4 1.3 Nickel contained in finished matte 5.8 7.6 9.7 8.6 8.8 8.8 5.8 Nickel metal 16.6 10.6 17.0 15.9 16.2 16.2 16.6 -------------- -------------- -------------- -------------- ---------------- Nickel production 23.7 22.3 29.8 27.5 28.4 28.4 23.7 -------------- -------------- -------------- -------------- ---------------- ---------------- -------------- Sales Nickel contained in concentrate 1.6 2.9 3.1 3.0 2.7 2.7 1.6 Nickel contained in finished matte 6.7 7.0 9.0 9.7 7.8 7.8 6.7 Nickel metal 14.2 12.8 19.5 17.7 15.3 15.3 14.2 -------------- -------------- -------------- -------------- ---------------- Nickel sales 22.5 22.7 31.6 30.4 25.8 25.8 22.5 -------------- -------------- -------------- -------------- ---------------- ---------------- --------------
This information is provided by RNS
The company news service from the London Stock Exchange
END
MSCDBBDGCDDBGXB
1 Year Bhp Chart |
1 Month Bhp Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions