We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Bhp Group Limited | LSE:BHP | London | Ordinary Share | AU000000BHP4 | ORD NPV (DI) |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
19.00 | 0.93% | 2,055.00 | 2,055.00 | 2,058.00 | 2,060.00 | 2,039.00 | 2,039.00 | 141,292 | 09:39:27 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
Crude Petroleum & Natural Gs | 56.94B | 7.9B | 1.5575 | 25.63 | 103.23B |
TIDMBLT
RNS Number : 8488O
BHP Billiton PLC
16 October 2012
NEWS RELEASE Release Time IMMEDIATE Date 17 October 2012 Number 25/12
BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2012
-- The release of latent capacity and robust operating performance across our diversified portfolio continues to underpin strong growth in our high margin businesses.
-- Petroleum production averaged a record 666 thousand barrels of oil equivalent per day during the September 2012 quarter as the Atlantis and Mad Dog facilities in the Gulf of Mexico successfully recommenced production.
-- Queensland Coal volumes rose by 20% during the September 2012 quarter as BMA production increased to over 80% of supply chain capacity.
-- Western Australia Iron Ore achieved another significant milestone with first ore loaded from the two recently installed shiploaders at Nelson Point as part of the Inner Harbour Expansion project.
-- Escondida copper production remains on track to increase by 20% in the 2013 financial year following the completion of scheduled maintenance and tie-in activities in the September 2012 quarter.
Petroleum
SEP Q12 vs SEP 2012 QTR SEP Q12 vs SEP Q11 JUN Q12 --------------------------------------------------------- ------------ ------------------ ---------- Crude oil, condensate and natural gas liquids ('000 boe) 22,765 4% 17% --------------------------------------------------------- ------------ ------------------ ---------- Natural gas (bcf) 230.89 30% 4% --------------------------------------------------------- ------------ ------------------ ---------- Total petroleum products (million boe) 61.25 19% 9% --------------------------------------------------------- ------------ ------------------ ----------
Total petroleum production- Petroleum production averaged a record 666 thousand barrels of oil equivalent per day during the September 2012 quarter.
Crude oil, condensate and natural gas liquids- Liquids production increased by 17 per cent from the June 2012 quarter as the Atlantis and Mad Dog facilities in the Gulf of Mexico (US) successfully recommenced production. Reduced levels of planned maintenance at Bass Strait and the North West Shelf (both Australia) and development drilling at Shenzi (US) and Pyrenees (Australia) also contributed to the strong result.
Onshore US liquids production increased to a record 3.9 million barrels of oil equivalent (MMboe) during the September 2012 quarter. With the drilling program running ahead of infrastructure development, robust growth is anticipated over the remainder of the 2013 financial year as pipeline capacity is installed and additional wells are brought online.
Petroleum production guidance for the 2013 financial year remains unchanged at 240 MMboe and includes an expected 15 per cent increase in valuable liquids production, largely attributable to our Onshore US business and Gulf of Mexico facilities.
Natural gas - Seasonally high gas demand at Bass Strait and strong operational performance at North West Shelf underpinned a quarterly production record for natural gas in the September 2012 quarter.
Aluminium
SEP 2012 QTR SEP Q12 vs SEP Q11 SEP Q12 vs JUN Q12 ------------------------ ------------ ------------------ ------------------ Alumina ('000 tonnes) 1,170 10% 13% ------------------------ ------------ ------------------ ------------------ Aluminium ('000 tonnes) 270 -14% 9% ------------------------ ------------ ------------------ ------------------
Alumina - The ramp up of the Worsley Efficiency & Growth project (Australia) and continued strong operating performance at the Alumar refinery (Brazil) contributed to record alumina production in the September 2012 quarter.
Aluminium - Production was higher than the June 2012 quarter as potline capacity at Hillside (South Africa) recovered following a major unplanned outage in the March 2012 quarter. Operations are expected to progressively return to full technical capacity by the end of the 2012 calendar year.
Base Metals
SEP 2012 SEP Q12 vs SEP Q12 vs QTR SEP Q11 JUN Q12 --------------------------------------------- -------- ---------- ---------- Copper ('000 tonnes) 273.9 24% -12% --------------------------------------------- -------- ---------- ---------- Lead (tonnes) 52,183 -6% -18% --------------------------------------------- -------- ---------- ---------- Zinc (tonnes) 25,922 11% -16% --------------------------------------------- -------- ---------- ---------- Silver ('000 ounces) 9,165 0% -21% --------------------------------------------- -------- ---------- ---------- Uranium oxide concentrate (Uranium) (tonnes) 1,042 4% -4% --------------------------------------------- -------- ---------- ----------
Copper - A 24 per cent increase in production from the September 2011 quarter reflected the mining of higher grade ore at Escondida (Chile) and the impact of industrial action in the corresponding period. Record quarterly production was achieved at Antamina (Peru) as milling rates continued to exceed recently expanded ore processing capacity.
A reduction in smelter throughput affected Olympic Dam (Australia) production in the September 2012 quarter. A 27 day smelter outage is scheduled for the December 2012 quarter.
Escondida copper production remains on track to increase by 20 per cent in the 2013 financial year following the completion of scheduled maintenance and tie-in activities in the September 2012 quarter.
Lead/silver - Lower head grades at Cannington (Australia) contributed to a reduction in lead and silver production in the September 2012 quarter.
Zinc - Zinc production at Antamina declined during the September 2012 quarter as mining progressed through a copper-rich ore zone.
Uranium - Production for the September 2012 quarter was broadly in line with all comparable periods.
Diamonds & Specialty Products
SEP 2012 QTR SEP Q12 vs SEP Q11 SEP Q12 vs JUN Q12 ----------------------- -------- ------------------ ------------------ Diamonds ('000 carats) 313 -32% -24% ----------------------- -------- ------------------ ------------------
Diamonds - Production was lower than all comparable periods and reflected temporarily restricted mining conditions and unscheduled maintenance at EKATI (Canada). While production is expected to recover in the December 2012 quarter, it is forecast to remain constrained in the medium term as the operation extracts lower grade material, consistent with the mine plan.
The sale of BHP Billiton's 37 per cent non-operated interest in Richards Bay Minerals (South Africa) to Rio Tinto was completed during the September 2012 quarter. The review of BHP Billiton's diamonds business is continuing.
Nickel
SEP 2012 QTR SEP Q12 vs SEP Q11 SEP Q12 vs JUN Q12 --------------------- ------------ ------------------ ------------------ Nickel ('000 tonnes) 37.0 5% -13% --------------------- ------------ ------------------ ------------------
Nickel - An increase in nickel metal production in the September 2012 quarter reflected strong operating performance at both Cerro Matoso (Colombia) and the Nickel West Kwinana refinery (Australia). Total saleable production declined as nickel matte was stockpiled in advance of planned maintenance at the Nickel West Kalgoorlie smelter in the December 2012 quarter.
Iron Ore
SEP 2012 QTR SEP Q12 vs SEP Q11 SEP Q12 vs JUN Q12 ----------------------- ------------ ------------------ ------------------ Iron ore ('000 tonnes) 39,772 1% -3% ----------------------- ------------ ------------------ ------------------
Iron ore - Western Australia Iron Ore (WAIO) sustained strong performance in the September 2012 quarter despite the impact of a planned shutdown associated with the Inner Harbour Expansion project. Our Pilbara operations achieved another significant milestone during the quarter with first ore loaded from two recently installed shiploaders at Nelson Point.
WAIO production guidance remains unchanged with a five per cent increase anticipated in the 2013 financial year.
Samarco's (Brazil) three pellet plants continued to operate at capacity during the period.
Manganese
SEP 2012 QTR SEP Q12 vs SEP Q11 SEP Q12 vs JUN Q12 ------------------------------ ------------ ------------------ ------------------ Manganese ore ('000 tonnes) 2,146 6% 4% ------------------------------ ------------ ------------------ ------------------ Manganese alloy ('000 tonnes) 130 -33% 73% ------------------------------ ------------ ------------------ ------------------
Manganese ore - Consistently strong operating performance and improved plant availability at GEMCO (Australia) contributed to record ore production in the September 2012 quarter.
Manganese alloy - The resumption of production at TEMCO (Australia) in July 2012 led to a substantial increase in alloy production from the June 2012 quarter. The decline in alloy production from the September 2011 quarter reflected the permanent closure of energy intensive silicomanganese production at Metalloys (South Africa) in January 2012.
Metallurgical Coal
SEP 2012 QTR SEP Q12 vs SEP Q11 SEP Q12 vs JUN Q12 --------------------------------- ------------ ------------------ ------------------ Metallurgical coal ('000 tonnes) 8,938 -4% 10% --------------------------------- ------------ ------------------ ------------------
Metallurgical coal- Queensland Coal (Australia) production increased by 20 per cent during the September 2012 quarter as significant latent capacity was released across the supply chain. Production at BMA benefited from a reduction in industrial activity with no significant work stoppages experienced since July 2012. A ballot on the BMA Enterprise Agreement will be conducted during October 2012. During the September 2012 quarter, BMA announced it would cease production at its Gregory open-cut mine following a review of the mine's profitability.
A planned longwall move at the Appin mine led to lower production at Illawarra Coal (Australia) during the September 2012 quarter. A longwall move at the Dendrobium mine is expected to commence at the end of the December 2012 quarter.
Energy Coal
SEP 2012 QTR SEP Q12 vs SEP Q11 SEP Q12 vs JUN Q12 -------------------------- ------------ ------------------ ------------------ Energy coal ('000 tonnes) 19,607 6% 6% -------------------------- ------------ ------------------ ------------------
Energy coal - Production was higher than all comparable periods and reflected strong operating performance across the BHP Billiton Energy Coal portfolio. New South Wales Energy Coal (Australia) achieved record quarterly production following the completion of the RX1 project in the June 2012 quarter, ahead of schedule. In addition, the San Juan Coal mine (US) benefited from a full quarter of production following the resumption of longwall mining activity in the June 2012 quarter.
This report, together with the Exploration and Development Report, represents the Interim Management Statement for the purposes of the UK Listing Authority's Disclosure and Transparency Rules. There have been no significant changes in the financial position of the Group in the quarter ended 30 September 2012.
Further information on BHP Billiton can be found at: www.bhpbilliton.com
Media Relations Investor Relations Australia Australia Antonios Papaspiropoulos James Agar Tel: +61 3 9609 3830 Mobile: +61 477 325 803 Tel: +61 3 9609 2222 Mobile: +61 467 807 064 email: Antonios.Papaspiropoulos@bhpbilliton.com email: James.Agar@bhpbilliton.com Fiona Hadley Andrew Gunn Tel: +61 3 9609 2211 Mobile: +61 427 777 908 Tel: +61 3 9609 3575 Mobile: +61 439 558 454 email: Fiona.Hadley@bhpbilliton.com email: Andrew.Gunn@bhpbilliton.com Eleanor Nichols United Kingdom and South Africa Tel: +61 3 9609 2360 Mobile: +61 407 064 748 email: Eleanor.Nichols@bhpbilliton.com Tara Dines Tel: +44 20 7802 7113 Mobile: +44 7825 342 232 United Kingdom Email: Tara.Dines@bhpbilliton.com Ruban Yogarajah Americas Tel: +44 20 7802 4033 Mobile: +44 7827 082 022 email: Ruban.Yogarajah@bhpbilliton.com Brendan Harris Tel: +44 20 7802 4131 Mobile: +44 7990 527 726 Americas email: Brendan.Harris@bhpbilliton.com Jaryl Strong Matt Chism Tel: +1 713 499 5548 Mobile: +1 281 222 6627 Tel: +1 71 359 96158 Mobile: +1 281 782 2238 email: Jaryl.Strong@bhpbilliton.com email: Matt.E.Chism@bhpbilliton.com BHP Billiton Limited ABN 49 004 028 077 BHP Billiton Plc Registration number 3196209 Registered in Australia Registered in England and Wales Registered Office: 180 Lonsdale Street Registered Office: Neathouse Place Melbourne Victoria 3000 Australia London SW1V 1BH United Kingdom Tel +61 1300 55 4757 Fax +61 3 9609 3015 Tel +44 20 7802 4000 Fax +44 20 7802 4111 Members of the BHP Billiton Group which is headquartered in Australia BHP BILLITON PRODUCTION SUMMARY ------------- ------------ ------------ ------------ ----- ------ QUARTER ENDED YEAR TO DATE % CHANGE ----------------------------------------- -------------------------- ------------- SEP SEP Q12 Q12 SEP JUN SEP SEP SEP vs vs SEP JUN 2011 2012 2012 2012 2011 Q11 Q12 ------------ ------------- ------------ ------------ ------------ ----- ------ PETROLEUM Crude oil & condensate ('000 bbl) 18,482 15,726 18,413 18,413 18,482 0% 17% Natural gas (bcf) 177.35 221.25 230.89 230.89 177.35 30% 4% NGL ('000 boe) 3,356 3,758 4,352 4,352 3,356 30% 16% Total petroleum products (million boe) 51.40 56.36 61.25 61.25 51.40 19% 9% ALUMINIUM Alumina ('000 tonnes) 1,060 1,039 1,170 1,170 1,060 10% 13% Aluminium ('000 tonnes) 315 248 270 270 315 -14% 9% BASE METALS Copper ('000 tonnes) 220.3 312.5 273.9 273.9 220.3 24% -12% Lead (tonnes) 55,659 63,667 52,183 52,183 55,659 -6% -18% Zinc (tonnes) 23,444 30,748 25,922 25,922 23,444 11% -16% Gold (ounces) 39,439 40,569 32,436 32,436 39,439 -18% -20% Silver ('000 ounces) 9,151 11,539 9,165 9,165 9,151 0% -21% Uranium oxide concentrate (tonnes) 1,000 1,080 1,042 1,042 1,000 4% -4% Molybdenum (tonnes) 595 464 454 454 595 -24% -2% DIAMONDS AND SPECIALTY PRODUCTS Diamonds ('000 carats) 457 413 313 313 457 -32% -24% NICKEL Nickel ('000 tonnes) 35.1 42.7 37.0 37.0 35.1 5% -13% IRON ORE Iron ore ('000 tonnes) 39,572 40,891 39,772 39,772 39,572 1% -3% MANGANESE Manganese ore ('000 tonnes) 2,019 2,066 2,146 2,146 2,019 6% 4% Manganese alloy ('000 tonnes) 194 75 130 130 194 -33% 73% METALLURGICAL COAL Metallurgical coal ('000 tonnes) 9,291 8,109 8,938 8,938 9,291 -4% 10% ENERGY COAL Energy coal ('000 tonnes) 18,460 18,484 19,607 19,607 18,460 6% 6% --------------- --------------- ------------ ------------- ------------ ------------ ------------ ----- ------ BHP BILLITON ATTRIBUTABLE PRODUCTION --------------- ----------------- --------------- --------------- --------------- QUARTER ENDED YEAR TO DATE ------------------------------------------------------------------------------------- -------------------------------- BHP Billiton SEP DEC MAR JUN SEP SEP SEP Interest 2011 2011 2012 2012 2012 2012 2011 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- PETROLEUM Production Crude oil & condensate ('000 bbl) 18,482 18,866 18,127 15,726 18,413 18,413 18,482 Natural gas (bcf) 177.35 214.49 209.17 221.25 230.89 230.89 177.35 NGL ('000 boe) (a) 3,356 3,362 3,609 3,758 4,352 4,352 3,356 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Total petroleum products (million boe) 51.40 57.98 56.60 56.36 61.25 61.25 51.40 ----------------------------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- ALUMINIUM ALUMINA Production ('000 tonnes) Worsley 86% 752 694 741 730 859 859 752 Alumar 36% 308 307 311 309 311 311 308 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Total 1,060 1,001 1,052 1,039 1,170 1,170 1,060 ------------------ --------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- ALUMINIUM Production ('000 tonnes) Hillside 100% 180 180 144 117 139 139 180 Bayside 100% 25 24 26 23 25 25 25 Alumar 40% 44 42 42 42 39 39 44 Mozal 47% 66 67 65 66 67 67 66 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Total 315 313 277 248 270 270 315 ------------------ --------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- BASE METALS (b) COPPER Payable metal in concentrate ('000 tonnes) Escondida 57.5% 49.9 80.4 87.7 115.8 101.2 101.2 49.9 Antamina 33.8% 30.3 30.9 30.9 34.9 40.2 40.2 30.3 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Total 80.2 111.3 118.6 150.7 141.4 141.4 80.2 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Cathode ('000 tonnes) Escondida 57.5% 32.9 43.0 47.4 48.7 41.6 41.6 32.9 Pampa Norte (c) 100% 65.4 70.0 66.2 62.1 52.7 52.7 65.4 Pinto Valley 100% 1.4 1.4 1.4 1.2 1.2 1.2 1.4 Olympic Dam 100% 40.4 54.6 47.8 49.8 37.0 37.0 40.4 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Total 140.1 169.0 162.8 161.8 132.5 132.5 140.1 ------------------ --------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- LEAD Payable metal in concentrate (tonnes) Cannington 100% 55,557 66,787 53,412 63,334 51,923 51,923 55,557 Antamina 33.8% 102 205 148 333 260 260 102 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Total 55,659 66,992 53,560 63,667 52,183 52,183 55,659 ------------------ --------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- ZINC Payable metal in concentrate (tonnes) Cannington 100% 14,488 14,745 12,904 12,540 11,408 11,408 14,488 Antamina 33.8% 8,956 13,553 16,823 18,208 14,514 14,514 8,956 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Total 23,444 28,298 29,727 30,748 25,922 25,922 23,444 ------------------ --------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Refer footnotes on page 4. BASE METALS (continued) GOLD Payable metal in concentrate (ounces) Escondida 57.5% 11,063 14,242 12,732 12,817 9,419 9,419 11,063 Olympic Dam (refined gold) 100% 28,376 29,765 31,952 27,752 23,017 23,017 28,376 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Total 39,439 44,007 44,684 40,569 32,436 32,436 39,439 ------------------ --------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- SILVER Payable metal in concentrate ('000 ounces) Escondida 57.5% 403 549 481 488 350 350 403 Antamina 33.8% 972 1,087 1,170 1,043 919 919 972 Cannington 100% 7,559 9,056 7,836 9,757 7,689 7,689 7,559 Olympic Dam (refined silver) 100% 217 211 228 251 207 207 217 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Total 9,151 10,903 9,715 11,539 9,165 9,165 9,151 ------------------ --------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- URANIUM OXIDE CONCENTRATE Payable metal in concentrate (tonnes) Olympic Dam 100% 1,000 909 896 1,080 1,042 1,042 1,000 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Total 1,000 909 896 1,080 1,042 1,042 1,000 ------------------ --------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- MOLYBDENUM Payable metal in concentrate (tonnes) Antamina 33.8% 595 766 521 464 454 454 595 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Total 595 766 521 464 454 454 595 ------------------ --------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- DIAMONDS AND SPECIALTY PRODUCTS DIAMONDS Production ('000 carats) EKATI (TM) 80% 457 481 433 413 313 313 457 ------------------ --------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- NICKEL NICKEL Production ('000 tonnes) CMSA 99.9% 10.4 12.3 13.4 12.8 13.3 13.3 10.4 Nickel West 100% 24.7 26.1 28.3 29.9 23.7 23.7 24.7 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Total 35.1 38.4 41.7 42.7 37.0 37.0 35.1 ------------------ --------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Refer footnotes on page 4. IRON ORE Production ('000 tonnes) (d) Newman (e) 85% 13,158 13,247 11,789 13,132 11,752 11,752 13,158 Goldsworthy Joint Venture 85% 254 334 37 143 432 432 254 Area C Joint Venture 85% 10,479 10,437 10,343 11,166 10,937 10,937 10,479 Yandi Joint Venture 85% 12,708 14,170 13,063 13,595 13,771 13,771 12,708 Samarco 50% 2,973 2,884 2,711 2,855 2,880 2,880 2,973 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Total 39,572 41,072 37,943 40,891 39,772 39,772 39,572 ------------------ --------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- MANGANESE MANGANESE ORES Saleable production ('000 tonnes) South Africa (f) 44.4% 911 808 917 989 858 858 911 Australia (f) 60% 1,108 998 1,123 1,077 1,288 1,288 1,108 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Total 2,019 1,806 2,040 2,066 2,146 2,146 2,019 ------------------ --------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- MANGANESE ALLOYS Saleable production ('000 tonnes) South Africa (f) (g) 60% 124 124 81 75 93 93 124 Australia (f) 60% 70 71 57 - 37 37 70 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Total 194 195 138 75 130 130 194 ------------------ --------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- METALLURGICAL COAL Production ('000 tonnes) (h) BMA 50% 5,274 5,006 4,226 4,105 5,182 5,182 5,274 BHP Mitsui Coal (i) 80% 1,803 1,580 1,649 1,661 1,766 1,766 1,803 Illawarra 100% 2,214 1,907 1,462 2,343 1,990 1,990 2,214 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Total 9,291 8,493 7,337 8,109 8,938 8,938 9,291 ------------------ --------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- ENERGY COAL Production ('000 tonnes) South Africa 100% 9,095 7,976 7,895 8,313 8,454 8,454 9,095 USA 100% 2,467 2,163 2,109 2,673 3,871 3,871 2,467 Australia 100% 4,046 4,027 4,291 4,393 4,453 4,453 4,046 Colombia 33% 2,852 2,753 2,953 3,105 2,829 2,829 2,852 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Total 18,460 16,919 17,248 18,484 19,607 19,607 18,460 ------------------ --------- --------------- --------------- --------------- ----------------- --------------- --------------- ---------------
(a) LPG and ethane are reported as Natural Gas Liquid (NGL). Product-specific conversions are made and NGL is reported in barrels of oil equivalent (boe).
(b) Metal production is reported on the basis of payable metal.
(c) Includes Cerro Colorado and Spence.
(d) Iron ore production is reported on a wet tonnes basis.
(e) Newman includes Mt Newman Joint Venture and Jimblebar.
(f) Shown on 100% basis. BHP Billiton interest in saleable production is 60%, except Hotazel Manganese Mines which is 44.4%.
(g) Production includes Medium Carbon Ferro Manganese.
(h) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.
(i) Shown on 100% basis. BHP Billiton interest in saleable production is 80%.
PRODUCTION AND SALES REPORT ------------------------------------- QUARTER ENDED YEAR TO DATE --------------------------------------------------------------------------------------------- ------------------------------------ SEP DEC MAR JUN SEP SEP SEP 2011 2011 2012 2012 2012 2012 2011 ----------------- ----------------- ----------------- ----------------- ----------------- ----------------- ----------------- ----------------- PETROLEUM BHP Billiton attributable production unless otherwise stated. CRUDE OIL & CONDENSATE ('000 barrels) Bass Strait 2,527 2,190 2,285 2,357 2,659 2,659 2,527 North West Shelf 1,400 1,686 1,671 1,587 1,844 1,844 1,400 Stybarrow 1,171 836 618 635 534 534 1,171 Pyrenees 3,901 3,207 2,540 2,482 2,605 2,605 3,901 Other Australia (a) 13 13 13 13 17 17 13 Atlantis (b) 2,081 2,390 2,262 39 1,586 1,586 2,081 Mad Dog (b) - - - - 377 377 - Shenzi (b) (c) 3,848 4,119 4,071 3,607 4,035 4,035 3,848 Onshore US (d) 672 1,631 2,202 2,434 2,358 2,358 672 Trinidad/Tobago 466 466 453 488 397 397 466 Other Americas (b) (e) 373 374 373 348 367 367 373 UK 447 433 328 367 252 252 447 Algeria (f) 1,498 1,437 1,236 1,291 1,309 1,309 1,498 Pakistan 85 84 75 78 73 73 85 Total 18,482 18,866 18,127 15,726 18,413 18,413 18,482 ----------------- ----------------- ----------------- ----------------- ----------------- ----------------- ----------------- NATURAL GAS (billion cubic feet) Bass Strait 31.88 23.65 19.74 31.47 39.39 39.39 31.88 North West Shelf 32.97 32.56 29.60 29.80 35.41 35.41 32.97 Other Australia (a) 4.45 4.56 4.42 4.87 6.20 6.20 4.45 Atlantis (b) 0.64 0.67 1.18 0.01 0.50 0.50 0.64 Mad Dog (b) - - - - 0.06 0.06 - Shenzi (b) (c) 0.62 0.57 0.56 0.47 0.96 0.96 0.62 Onshore US (d) 77.59 121.63 124.17 124.53 122.59 122.59 77.59 Trinidad/Tobago 9.31 9.72 9.50 9.54 9.08 9.08 9.31 Other Americas (b) (e) 1.19 0.98 1.09 0.79 0.35 0.35 1.19 UK 3.91 5.51 5.03 5.54 3.33 3.33 3.91 Pakistan 14.79 14.64 13.88 14.23 13.02 13.02 14.79 Total 177.35 214.49 209.17 221.25 230.89 230.89 177.35 ----------------- ----------------- ----------------- ----------------- ----------------- ----------------- ----------------- NGL ('000 barrels of oil equivalent) Bass Strait 1,823 1,407 1,355 1,738 2,074 2,074 1,823 North West Shelf 423 434 421 342 394 394 423 Atlantis (b) 120 123 221 1 37 37 120 Mad Dog (b) - - - - 9 9 - Shenzi (b) (c) 296 293 291 244 309 309 296 Onshore US (d) 416 943 1,275 1,388 1,516 1,516 416 Other Americas (b) (e) 41 34 34 24 13 13 41 UK 18 45 12 21 - - 18 Algeria (f) 219 83 - - - - 219 Total 3,356 3,362 3,609 3,758 4,352 4,352 3,356 ----------------- ----------------- ----------------- ----------------- ----------------- ----------------- ----------------- TOTAL PETROLEUM PRODUCTS 51.40 57.98 56.60 56.36 61.25 61.25 51.40 ----------------- ----------------- ----------------- ----------------- ----------------- ----------------- ----------------- (million barrels of oil equivalent) (g)
(a) Other Australia includes Minerva.
(b) Gulf of Mexico volumes are net of royalties.
(c) The Genghis Khan operation is reported in Shenzi.
(d) Fayetteville shale acquisition completed on 31 March 2011. Petrohawk Energy Corporation acquisition completed on 20 August 2011. Onshore US volumes are net of mineral holder royalties.
(e) Other Americas includes Neptune, West Cameron 76, Genesis and Starlifter. West Cameron 76 and Starlifter were divested in May 2012.
(f) Algeria includes ROD and Ohanet. The Ohanet Risk Sharing Contract expired in October 2011.
(g) Total barrels of oil equivalent (boe) conversions are based on 6,000 scf of natural gas equals 1 boe.
PRODUCTION AND SALES REPORT QUARTER ENDED YEAR TO DATE ----------------------------------------------------------------------------------- -------------------------------- SEP DEC MAR JUN SEP SEP SEP 2011 2011 2012 2012 2012 2012 2011 --------------- --------------- --------------- --------------- --------------- --------------- --------------- ALUMINIUM BHP Billiton attributable production and sales unless otherwise stated. ('000 tonnes) ALUMINA Saleable production Worsley, Australia 752 694 741 730 859 859 752 Alumar, Brazil 308 307 311 309 311 311 308 --------------- --------------- --------------- --------------- --------------- --------------- --------------- Total 1,060 1,001 1,052 1,039 1,170 1,170 1,060 --------------- --------------- --------------- --------------- --------------- --------------- --------------- Sales Worsley, Australia 720 745 713 750 820 820 720 Alumar, Brazil 280 349 216 356 352 352 280 --------------- --------------- --------------- --------------- --------------- --------------- --------------- Total 1,000 1,094 929 1,106 1,172 1,172 1,000 ---------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- ALUMINIUM Production Hillside, South Africa 180 180 144 117 139 139 180 Bayside, South Africa 25 24 26 23 25 25 25 Alumar, Brazil 44 42 42 42 39 39 44 Mozal, Mozambique 66 67 65 66 67 67 66 --------------- --------------- --------------- --------------- --------------- --------------- --------------- Total 315 313 277 248 270 270 315 --------------- --------------- --------------- --------------- --------------- --------------- --------------- Sales Hillside, South Africa 163 186 141 126 139 139 163 Bayside, South Africa 24 25 27 21 26 26 24 Alumar, Brazil 44 43 31 45 46 46 44 Mozal, Mozambique 60 85 66 54 58 58 60 --------------- --------------- --------------- --------------- --------------- --------------- --------------- Total 291 339 265 246 269 269 291 ---------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- PRODUCTION AND SALES REPORT --------------- --------------- --------------- --------------- --------------- --------------- --------------- QUARTER ENDED YEAR TO DATE ----------------------------------------------------------------------------------- -------------------------------- SEP DEC MAR JUN SEP SEP SEP 2011 2011 2012 2012 2012 2012 2011 --------------- --------------- --------------- --------------- --------------- --------------- --------------- BASE METALS BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless otherwise stated. Escondida, Chile Material ('000 mined (100%) tonnes) 69,006 96,152 103,321 109,724 102,499 102,499 69,006 Sulphide ore milled ('000 (100%) tonnes) 12,029 18,663 16,449 18,640 16,850 16,850 12,029 Average copper grade (%) 0.97% 0.97% 1.14% 1.37% 1.35% 1.35% 0.97% Production ex mill ('000 (100%) tonnes) 91.9 144.3 153.1 211.7 185.2 185.2 91.9 Production Payable ('000 copper tonnes) 49.9 80.4 87.7 115.8 101.2 101.2 49.9 Payable gold (fine concentrate ounces) 11,063 14,242 12,732 12,817 9,419 9,419 11,063 Copper ('000 cathode (EW) tonnes) 32.9 43.0 47.4 48.7 41.6 41.6 32.9 Payable silver ('000 concentrate ounces) 403 549 481 488 350 350 403 Sales Payable ('000 copper tonnes) 49.2 82.1 82.6 113.1 95.7 95.7 49.2 Payable gold (fine concentrate ounces) 10,974 14,435 11,998 12,683 8,999 8,999 10,974 Copper ('000 cathode (EW) tonnes) 25.7 45.3 44.3 53.4 38.8 38.8 25.7 Payable silver ('000 concentrate ounces) 404 558 454 483 324 324 404 -------------- ---------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- Pampa Norte, Chile Cerro Colorado Material ('000 mined tonnes) 14,736 16,792 16,320 16,246 16,067 16,067 14,736 ('000 Ore milled tonnes) 4,608 4,601 4,300 4,388 4,505 4,505 4,608 Average copper grade (%) 0.72% 0.71% 0.72% 0.61% 0.55% 0.55% 0.72% Production Copper ('000 cathode (EW) tonnes) 22.5 23.5 18.7 18.7 17.8 17.8 22.5 Sales Copper ('000 cathode (EW) tonnes) 22.4 23.8 20.2 19.1 16.1 16.1 22.4 Spence Material ('000 mined tonnes) 19,816 26,511 29,982 28,594 27,541 27,541 19,816 ('000 Ore milled tonnes) 3,862 4,909 4,279 3,604 3,752 3,752 3,862 Average copper grade (%) 1.30% 1.46% 1.20% 1.28% 1.17% 1.17% 1.30% Production Copper ('000 cathode (EW) tonnes) 42.9 46.5 47.5 43.4 34.9 34.9 42.9 Sales Copper ('000 cathode (EW) tonnes) 43.2 46.6 44.1 51.3 31.1 31.1 43.2 -------------- ---------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- Antamina, Peru Material ('000 mined (100%) tonnes) 44,212 38,759 41,474 48,256 54,482 54,482 44,212 Sulphide ore milled ('000 (100%) tonnes) 9,396 9,656 10,162 12,295 12,274 12,274 9,396 Average head grades - Copper (%) 1.11% 1.15% 1.10% 1.01% 1.15% 1.15% 1.11% - Zinc (%) 0.68% 0.72% 0.84% 0.80% 0.66% 0.66% 0.68% Production Payable ('000 copper tonnes) 30.3 30.9 30.9 34.9 40.2 40.2 30.3 Payable zinc (tonnes) 8,956 13,553 16,823 18,208 14,514 14,514 8,956 Payable ('000 silver ounces) 972 1,087 1,170 1,043 919 919 972 Payable lead (tonnes) 102 205 148 333 260 260 102 Payable molybdenum (tonnes) 595 766 521 464 454 454 595 Sales Payable ('000 copper tonnes) 28.2 31.7 30.7 32.7 39.7 39.7 28.2 Payable zinc (tonnes) 9,586 12,654 13,464 18,174 15,519 15,519 9,586 Payable ('000 silver ounces) 833 940 1,114 896 849 849 833 Payable lead (tonnes) 91 139 200 48 330 330 91 Payable molybdenum (tonnes) 549 591 669 488 536 536 549 -------------- ---------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- Cannington, Australia Material ('000 mined tonnes) 819 778 756 880 717 717 819 ('000 Ore milled tonnes) 826 888 778 845 773 773 826 Average head grades - Silver (g/t) 332 370 367 417 355 355 332 - Lead (%) 7.9% 8.8% 8.0% 8.6% 7.6% 7.6% 7.9% - Zinc (%) 2.9% 2.9% 2.7% 2.5% 2.5% 2.5% 2.9% Production Payable ('000 silver ounces) 7,559 9,056 7,836 9,757 7,689 7,689 7,559 Payable lead (tonnes) 55,557 66,787 53,412 63,334 51,923 51,923 55,557 Payable zinc (tonnes) 14,488 14,745 12,904 12,540 11,408 11,408 14,488 Sales Payable ('000 silver ounces) 6,434 8,960 7,081 10,784 8,506 8,506 6,434 Payable lead (tonnes) 48,258 66,657 49,027 73,400 59,042 59,042 48,258 Payable zinc (tonnes) 15,734 14,078 10,780 14,399 10,379 10,379 15,734 -------------- ---------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- Olympic Dam, Australia Material ('000 mined (a) tonnes) 2,543 2,440 2,389 2,629 2,226 2,226 2,543 ('000 Ore milled tonnes) 2,471 2,440 2,195 2,475 2,471 2,471 2,471 Average copper grade (%) 1.98% 2.08% 2.01% 1.86% 1.90% 1.90% 1.98% Average uranium grade (kg/t) 0.54 0.50 0.57 0.55 0.54 0.54 0.54 Production Copper ('000 cathode (ER) tonnes) 37.6 51.5 45.2 46.0 34.0 34.0 37.6 Copper ('000 cathode (EW) tonnes) 2.8 3.1 2.6 3.8 3.0 3.0 2.8 Uranium oxide concentrate (tonnes) 1,000 909 896 1,080 1,042 1,042 1,000 (fine Refined gold ounces) 28,376 29,765 31,952 27,752 23,017 23,017 28,376 Refined ('000 silver ounces) 217 211 228 251 207 207 217 Sales Copper ('000 cathode (ER) tonnes) 36.4 51.7 44.4 47.8 35.1 35.1 36.4 Copper ('000 cathode (EW) tonnes) 3.5 2.5 3.0 3.1 3.4 3.4 3.5 Uranium oxide concentrate (tonnes) 910 1,126 640 1,252 615 615 910 (fine Refined gold ounces) 28,979 24,327 36,832 29,257 20,949 20,949 28,979 Refined ('000 silver ounces) 289 155 268 200 265 265 289 (a) Material mined refers to run of mine ore mined and hoisted. -------------------------------------------------------------------------------------------------------------------------------------------------- Pinto Valley, USA Production Copper ('000 cathode (EW) tonnes) 1.4 1.4 1.4 1.2 1.2 1.2 1.4 Sales Copper ('000 cathode (EW) tonnes) 1.7 1.2 1.2 1.2 1.2 1.2 1.7 -------------- ---------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- PRODUCTION AND SALES REPORT -------------- -------------- -------------- -------------- -------------- ------------- -------------- QUARTER ENDED YEAR TO DATE ------------------------------------------------------------------------------ ----------------------------- SEP DEC MAR JUN SEP SEP SEP 2011 2011 2012 2012 2012 2012 2011 -------------- -------------- -------------- -------------- -------------- ------------- -------------- DIAMONDS AND SPECIALTY PRODUCTS BHP Billiton attributable production and sales unless otherwise stated. DIAMONDS EKATI (TM) Canada Ore Processed (100%) ('000 tonnes) 1,177 1,090 1,001 1,214 1,042 1,042 1,177 Production ('000 carats) 457 481 433 413 313 313 457 ------------- --------------- -------------- -------------- -------------- -------------- -------------- ------------- -------------- PRODUCTION AND SALES REPORT QUARTER ENDED YEAR TO DATE ----------------------------------------------------------------------------------- -------------------------------- SEP DEC MAR JUN SEP SEP SEP 2011 2011 2012 2012 2012 2012 2011 --------------- --------------- --------------- --------------- --------------- --------------- --------------- NICKEL BHP Billiton attributable production and sales unless otherwise stated. ('000 tonnes) NICKEL Cerro Matoso, Colombia Production 10.4 12.3 13.4 12.8 13.3 13.3 10.4 Sales 7.7 13.1 13.8 12.9 12.3 12.3 7.7 ---------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- Nickel West, Australia Saleable production Nickel contained in concentrate 2.6 1.8 2.3 2.3 1.3 1.3 2.6 Nickel contained in finished matte 9.0 15.2 10.5 14.2 5.8 5.8 9.0 Nickel metal 13.1 9.1 15.5 13.4 16.6 16.6 13.1 --------------- --------------- --------------- --------------- --------------- --------------- --------------- Nickel production 24.7 26.1 28.3 29.9 23.7 23.7 24.7 --------------- --------------- --------------- --------------- --------------- --------------- --------------- Sales Nickel contained in concentrate 1.2 2.6 1.5 3.6 1.6 1.6 1.2 Nickel contained in finished matte 10.1 13.9 10.2 16.7 6.7 6.7 10.1 Nickel metal 9.4 10.9 14.2 15.7 14.2 14.2 9.4 --------------- --------------- --------------- --------------- --------------- --------------- --------------- Nickel sales 20.7 27.4 25.9 36.0 22.5 22.5 20.7 ---------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- PRODUCTION AND SALES REPORT QUARTER ENDED YEAR TO DATE ------------------------------------------------------------------------------- ------------------------------ SEP DEC MAR JUN SEP SEP SEP 2011 2011 2012 2012 2012 2012 2011 -------------- -------------- --------------- -------------- -------------- -------------- -------------- IRON ORE BHP Billiton attributable production and sales unless otherwise stated. ('000 tonnes) IRON ORE (a) Pilbara, Australia Production Newman (b) 13,158 13,247 11,789 13,132 11,752 11,752 13,158 Goldsworthy Joint Venture 254 334 37 143 432 432 254 Area C Joint Venture 10,479 10,437 10,343 11,166 10,937 10,937 10,479 Yandi Joint Venture 12,708 14,170 13,063 13,595 13,771 13,771 12,708 -------------- -------------- --------------- -------------- -------------- -------------- -------------- Total (BHP Billiton share) 36,599 38,188 35,232 38,036 36,892 36,892 36,599 -------------- -------------- --------------- -------------- -------------- -------------- -------------- Total production (100%) 43,058 44,927 41,449 44,748 43,403 43,403 43,058 Sales Lump 7,744 8,700 8,235 9,100 8,338 8,338 7,744 Fines 29,311 28,406 26,523 28,870 28,718 28,718 29,311 -------------- -------------- --------------- -------------- -------------- -------------- -------------- Total (BHP Billiton share) 37,055 37,106 34,758 37,970 37,056 37,056 37,055 -------------- -------------- --------------- -------------- -------------- -------------- -------------- Total sales (100%) 43,594 43,654 40,892 44,670 43,595 43,595 43,594 (a) Iron ore production and sales are reported on a wet tonnes basis. (b) Newman includes Mt Newman Joint Venture and Jimblebar. --------------- ---------------------------------------------------------------------------------------------------------------- Samarco, Brazil Production 2,973 2,884 2,711 2,855 2,880 2,880 2,973 Sales 2,926 2,961 2,453 2,778 2,622 2,622 2,926 ---------------- -------------- -------------- --------------- -------------- -------------- -------------- -------------- PRODUCTION AND SALES REPORT QUARTER ENDED YEAR TO DATE ------------------------------------------------------------------------------------- -------------------------------- SEP DEC MAR JUN SEP SEP SEP 2011 2011 2012 2012 2012 2012 2011 --------------- --------------- --------------- ----------------- --------------- --------------- --------------- MANGANESE BHP Billiton attributable production and sales unless otherwise stated. ('000 tonnes) MANGANESE ORE South Africa (a) Saleable production 911 808 917 989 858 858 911 Sales 861 853 871 866 702 702 861 ---------------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Australia (a) Saleable production 1,108 998 1,123 1,077 1,288 1,288 1,108 Sales 1,094 876 1,115 1,343 1,054 1,054 1,094 ---------------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- MANGANESE ALLOY South Africa (a) (b) Saleable production 124 124 81 75 93 93 124 Sales 95 138 122 104 74 74 95 ---------------- --------------- --------------- --------------- ----------------- --------------- --------------- --------------- Australia (a) Saleable production 70 71 57 - 37 37 70 Sales 91 58 57 23 46 46 91 ---------------- --------------- --------------- --------------- ----------------- --------------- --------------- ---------------
(a) Shown on 100% basis. BHP Billiton interest in saleable production is 60%, except Hotazel Manganese Mines which is 44.4%.
(b) Production includes Medium Carbon Ferro Manganese.
PRODUCTION AND SALES REPORT QUARTER ENDED YEAR TO DATE ----------------------------------------------------------------------------------- --------------------------------- SEP DEC MAR JUN SEP SEP SEP 2011 2011 2012 2012 2012 2012 2011 -------------- --------------- -------------- --------------- ----------------- ----------------- -------------- METALLURGICAL COAL BHP Billiton attributable production and sales unless otherwise stated. ('000 tonnes) METALLURGICAL COAL (a) Queensland, Australia Production BMA Blackwater 1,367 1,122 955 991 1,148 1,148 1,367 Goonyella 1,463 1,375 1,153 1,012 1,535 1,535 1,463 Peak Downs 971 992 788 783 1,029 1,029 971 Saraji 802 900 627 724 773 773 802 Norwich Park 365 369 248 193 - - 365 Gregory Joint Venture 306 248 455 402 697 697 306 -------------- --------------- -------------- --------------- ----------------- ----------------- -------------- BMA total 5,274 5,006 4,226 4,105 5,182 5,182 5,274 -------------- --------------- -------------- --------------- ----------------- ----------------- -------------- BHP Mitsui Coal (b) South Walker Creek 1,106 901 1,040 1,034 1,084 1,084 1,106 Poitrel 697 679 609 627 682 682 697 -------------- --------------- -------------- --------------- ----------------- ----------------- -------------- BHP Mitsui Coal total 1,803 1,580 1,649 1,661 1,766 1,766 1,803 -------------- --------------- -------------- --------------- ----------------- ----------------- -------------- Queensland total 7,077 6,586 5,875 5,766 6,948 6,948 7,077 -------------- --------------- -------------- --------------- ----------------- ----------------- -------------- Sales Coking coal 5,066 4,845 4,522 4,007 4,058 4,058 5,066 Weak coking coal 1,691 1,747 1,595 1,512 1,545 1,545 1,691 Thermal coal 176 20 111 90 239 239 176 -------------- --------------- -------------- --------------- ----------------- ----------------- -------------- Total 6,933 6,612 6,228 5,609 5,842 5,842 6,933 -------------- --------------- -------------- --------------- ----------------- ----------------- -------------- (a) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal. (b) Shown on 100% basis. BHP Billiton interest in saleable production is 80%. ---------------- ----------------------------------------------------------------------------------------------------------------------- Illawarra, Australia Production 2,214 1,907 1,462 2,343 1,990 1,990 2,214 Sales Coking coal 1,673 1,255 1,460 1,845 1,775 1,775 1,673 Thermal coal 159 441 219 279 502 502 159 -------------- --------------- -------------- --------------- ----------------- ----------------- -------------- Total 1,832 1,696 1,679 2,124 2,277 2,277 1,832 ----------------- -------------- --------------- -------------- --------------- ----------------- ----------------- -------------- PRODUCTION AND SALES REPORT QUARTER ENDED YEAR TO DATE --------------------------------------------------------------------------------- -------------------------------- SEP DEC MAR JUN SEP SEP SEP 2011 2011 2012 2012 2012 2012 2011 --------------- -------------- -------------- --------------- --------------- --------------- --------------- ENERGY COAL BHP Billiton attributable production and sales unless otherwise stated. ('000 tonnes) South Africa Production 9,095 7,976 7,895 8,313 8,454 8,454 9,095 Sales Export 3,439 3,546 3,807 3,314 3,385 3,385 3,439 Local utility 5,622 4,582 4,397 4,571 4,869 4,869 5,622 Inland 85 165 124 74 38 38 85 --------------- -------------- -------------- --------------- --------------- --------------- --------------- Total 9,146 8,293 8,328 7,959 8,292 8,292 9,146 ---------------- --------------- -------------- -------------- --------------- --------------- --------------- --------------- New Mexico, USA Production Navajo Coal 1,178 2,060 1,913 1,853 1,804 1,804 1,178 San Juan Coal 1,289 103 196 820 2,067 2,067 1,289 --------------- -------------- -------------- --------------- --------------- --------------- --------------- Total 2,467 2,163 2,109 2,673 3,871 3,871 2,467 --------------- -------------- -------------- --------------- --------------- --------------- --------------- Sales - local utility 3,630 3,108 3,057 2,773 3,420 3,420 3,630 ---------------- --------------- -------------- -------------- --------------- --------------- --------------- --------------- NSW Energy Coal, Australia Production 4,046 4,027 4,291 4,393 4,453 4,453 4,046 Sales Export 3,523 3,566 3,160 4,388 4,488 4,488 3,523 Inland 625 333 297 404 250 250 625 --------------- -------------- -------------- --------------- --------------- --------------- --------------- Total 4,148 3,899 3,457 4,792 4,738 4,738 4,148 ---------------- --------------- -------------- -------------- --------------- --------------- --------------- --------------- Cerrejon Coal, Colombia Production 2,852 2,753 2,953 3,105 2,829 2,829 2,852 Sales - export 2,901 2,784 2,652 2,942 2,630 2,630 2,901 ---------------- --------------- -------------- -------------- --------------- --------------- --------------- ---------------
This information is provided by RNS
The company news service from the London Stock Exchange
END
MSCLFFFLILLRLIF
1 Year Bhp Chart |
1 Month Bhp Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions