We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Tomco Energy Plc | LSE:TOM | London | Ordinary Share | IM00BZBXMN96 | ORD NPV |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 0.0275 | - | 0.00 | 01:00:00 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
Drilling Oil And Gas Wells | 0 | -2.35M | -0.0006 | -0.50 | 1.07M |
Date | Subject | Author | Discuss |
---|---|---|---|
01/4/2021 13:16 | Quadrise RNS today: Quadrise Fuels International, the supplier of MSAR® and bioMSARTM emulsion technology and fuels, low-cost, cleaner alternatives to heavy fuel oil and biofuels, notes the announcement by TomCo Energy plc ("TomCo") today in relation to Greenfield Energy LLC ("Greenfield") and the Front End Engineering and Design ("FEED") study being carried out on the Petroteq Oils Sands Plant at Asphalt Ridge, Utah ("POSP"). The TomCo announcement explains in detail why commissioning and start-up of the POSP has been delayed during Q1'21, to enable the processing of ore from a potential site (the "Potential Site") which is being assessed and on which Greenfield's first 10,000 bopd plant may be built. It is expected that the enhanced POSP will restart after Easter, and that oil samples extracted from ore of the Potential Site will then be taken, assayed, and then shipped in April to the UK, to enable the Company to complete the necessary lab and pilot testing at the Quadrise Research Facility ("QRF") as planned. As previously noted, we anticipate being able to complete the MSAR® tests at QRF within three weeks of samples being received. For further information, please refer to the Company's website at www.quadrisefuels.co | hotfinance14 | |
01/4/2021 13:03 | Greenfield have had to come in and redesign/rebuild much of what PQE had previously cobbled together. This is possibly another element that Valkor have improved the design of. | stuart little | |
01/4/2021 12:34 | There is a petroteq video from months ago regarding the new heating equipemnt which was installed so they could work through the cold winter months. This has been addressed months ago. | rmart | |
01/4/2021 11:24 | It's good to see vauch you can keep your head when all around are losing there's | wilson2 | |
01/4/2021 11:05 | But could have been a consolidation, who knows | vauch | |
01/4/2021 11:04 | I dreamt this was at 25p | vauch | |
01/4/2021 11:03 | Yep no a lot to look forward to in life so dreaming is a great way to escape. | vauch | |
01/4/2021 11:00 | Vauch, dreamer. | goulding1215 | |
01/4/2021 10:14 | Dont get me wrong in in this, but it would be a miracle to have news form our own source first. Especially as we seem to find out most news a week or two before TOM | vauch | |
01/4/2021 10:12 | Why dont they just be honest at tell us what is happening at the appropriate time. ROLL ON TURBO SHALE | vauch | |
01/4/2021 10:09 | We knew the added equipment was on site on the 23rd March. from newswire on the 23rd March The facility maintenance program and equipment redesign have been completed for sand separation, clean sand production, and liquid and sediment extraction equipment. All equipment is now on site and commissioning of these devices is expected to begin immediately. | vauch | |
01/4/2021 09:43 | You see, the world is so corrupt and lies are so universally used to control and deceive that the lies start to form a reality all of their own. The web becomes reality and the truth is actually never sought or believed necessary. This is the world you exist in and how your beliefs are formed. Easier to believe than to challenge. Simpler to conform to deceit than than stand aside with the truth. Our governments and oligarchs get away with it so readily and know they should really be hanging from gallows so why not any low life of the same system use the same tactic. Tom is a system entity, there to provide the plankton for the wider corrupt financial ecosystem. But you cannot see this because to see it you must first break free from the conformity but that is too frightening for you with all the consequences it brings. Dear me. | thesageofsaint | |
01/4/2021 09:34 | Also you must all see how you are being walked down from the expectation of 500bopd. This was a simple made up number that they casually littered into previous RNS in the same way they used similar figures for the turboshale farce. First the expectation was diluted to 250 in 12 hours, which cannot be just extrapolated to 500 in 24, as they tacitly suggest you can. Now the contraption is having a whole more modifications and using different input material such that in future RNS they will no longer refer or suggest relevant any production rates, as it has morphed into this amorphous non-specified 'test' which has no validation criteria and no configuration and variable consistency. So you will never truly know what happened across the last year or where your money went. Only the future story is relevant not the historic one. And therein lies the con you are all taken in by. | thesageofsaint | |
01/4/2021 09:31 | Lopodop, They only thing that is seriously flawed is your orchestrated smear campaign for personal gain. You have been rumbled and the clock is ticking. I repeat..... "Oh, what a tangled web we weave, when first we practice to deceive!" Walter Scott | damac | |
01/4/2021 09:27 | Diddymen, Yes, Tomco could have issued it last Monday as per Petroteq. Why did they delay it a week? I don’t know, perhaps they wanted to be more sure than Petroteq with regards to when the modifications would be complete ergo the comment about completion shortly after Easter. Re your post by Sage from somewhere, I’m afraid he clearly doesn’t understand the concept of a FEED study. You can’t pick and choose which months of the year a FEED study applies to on a business model that is being designed to run all year round. It also has to be relative to the characteristics of the ore being processed. They stated that due to a temperature issue on part of the process, the ore from the proposed site currently (not Nov, Dec or Jan, currently!) being processed was not yielding the desired quantity. If they can demonstrate that introducing temperature to a certain part of the production process increases the yield from the ore now, then they can extrapolate that across the even colder periods of the year to calculate expected annual yield. Therefore, data gathered after the plant is turned back on next week is essential to turning out an informed and comprehensive FEED study. | damac | |
01/4/2021 09:20 | Goulding crcl started to move. | rmart | |
01/4/2021 08:45 | Buy the heaters now , even though we don't need them. I know a fella who could tweak this plant without all these new heaters | wilson2 | |
01/4/2021 08:45 | In a few weeks time the weather will be good enough for a return to turboshale | rmart | |
01/4/2021 08:26 | Well, the following is an improvement, so that's good news: "Greenfield believes that this will then enable the POSP to produce at higher rates of production than achieved to date, particularly during periods of cold weather, and that the oil produced by the POSP will be of a higher overall quality." | freedom97 | |
01/4/2021 08:23 | Relax, be confident, have faith. The model is seriously flawed but the driver will persevere. | lopodop | |
01/4/2021 07:57 | Tomco will be 10% in my opinion today | wilson2 | |
01/4/2021 07:56 | What happened that this was going tweaked to perfection on January 4th, just another feeble excuse to punters so directors get another years salaryFor producing nothing | wilson2 |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions