We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Anglo Asian Mining Plc | LSE:AAZ | London | Ordinary Share | GB00B0C18177 | ORD 1P |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 62.50 | 61.00 | 64.00 | 62.50 | 62.00 | 62.00 | 24,779 | 15:33:58 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
Miscellaneous Metal Ores,nec | 84.72M | 3.66M | 0.0320 | 19.53 | 71.4M |
Date | Subject | Author | Discuss |
---|---|---|---|
26/10/2017 09:13 | Yes, agreed Matt. Yet cheap is good. Topped up again @31p. Looking at cash w view to further... Gotto go; other stuff happening. | 2sporrans | |
26/10/2017 09:08 | With Westhead at the helm Ordubad is getting an in-depth assessment and going from soviet reports there’s much to go after. Frurther Exploration Low cost exploration work also continued at the Ordubad contract licence area in the Nakhchivan region of Azerbaijan. During Q3 2017, 750 metres of road cleaning was completed to reach exploration adits and surface mineralisation at the Shakadara deposit in order to verify the presence of mineralisation as reported in Soviet reports. 604 linear metres of trenching was completed from which 441 samples were collected. Initial results confirm the presence of surface and underground mineralisation of both gold and copper. It is planned to test similar style surface gold-quartz mineralisation at the adjacent Keleki area. On confirmation of this gold mineralisation, the Company will decide on a strategy to fully assess these deposits along with the Piazbashi and Agyurt deposit in the Ordubad area. | bleepy | |
26/10/2017 09:04 | So much to digest and containing many nuggets of info... The Gedabek contract area hosts many targets of different styles of mineralisation, which are being assessed in order to prioritise future exploration programmes. It is planned to prepare an annual three year work programme to dovetail into the Company's gold and copper production profile. This demonstrates the geological opportunities available to the Company for further evaluation. Further information regarding exploration programmes during 2018 and beyond will be announced by the end of Q4 2017. | bleepy | |
26/10/2017 09:01 | By splitting out these last two RNS, which they have never done before, they have created a level of expectation in the market which has not been met by the detail in this release.Yes, it all shows there is plenty afoot & I don't doubt it will result in more exciting news in the months ahead but, in terms of managing the news flow, this was very clearly a mistake as there is insufficient objective data here to support a separate RNS.They've rather shot themselves in the foot this morning in terms of how to manage the market | mattjos | |
26/10/2017 09:00 | I see from the map shown on the British Embassy visit link the Soyudlu lies about the same distance from the Gedabek production plant as Ugur @ 5/6 Kim’s. Another gold and copper mineralisation on production plant doorstep. | bleepy | |
26/10/2017 08:58 | There's plenty juicy morsels to pick out here. The scale of AAZs intent has emerged significantly with this update. Not only 1 but 2 phases of major capacity increase in the tailings dam, the details of which conclude with this: "Work is also underway constructing a second pipeline between the tailings dam and the Company's processing facilities to facilitate planned expansion of the processing facilities." Expect initial details on plant extension/expansion will be announced along with or shortly after the analysis of the ongoing exploration samples and reporting thereof. Taking just the main pit, open cast extension drilling, this looks to be ~45% complete at end of Sept. Might be 100% by Xmas. So possibly enough will be known by end of January to announce the grades found etc? Potentially, we might be given a partial [halfway], interim report much sooner. "As at the end of Q3 2017, 31 RC drill-holes with a total of 2,978 metres and 34 DD drill-holes with a total of 1,792 metres were completed. Another 5,000 metres of drilling is planned for Q4 2017." Hope we are given details of what Gadir grades etc will be soon, given production has already recommenced. Guess AAZ are still analysing their samples. Ditto for those for the Gadir->Main Pit tunnel, phase 1 now complete. Maybe the selling today is because some investors expected a bunch of resource estimates, with grades, ore type details and more? Yet, what we have been advised is entirely consistent with expectations whetted by the recent informal articles we've read. I'm looking to take advantage of the price drop. | 2sporrans | |
26/10/2017 08:58 | Gedabek tailings dam wall raise to support planned expansion now underway - wall is being raised to provide additional six metres of vertical capacity in first phase and a further six metres in second phase - scheduled for completion by the end of 2017 | celeritas | |
26/10/2017 08:56 | I agree jbe, whats going on closer to the plant is keeping them very busy, increasing the tailings dam by so much is a dead giveaway. 12m is some raising. | celeritas | |
26/10/2017 08:49 | Stephen Westhead at the top of his game as always... Other Exploration Within the Gedabek contract area, reconnaissance sampling of surface outcrop has provided 34 samples with positive results for gold and copper mineralisation at the "Soyudlu" area, some two kilometres from the tailings dam facility. Follow-up geological mapping, alteration mapping and area definition for drilling is planned. This area was initially investigated as part of the planning to situate future expansion of the tailings dam. | bleepy | |
26/10/2017 08:48 | A few traders getting screwed as MMs drop the price. AAZ very cheap. Would expect some drilling news soon. AAZ have so much gold that they don't have time to explore Bittibulag which is only 6km from the plant! | jbe81 | |
26/10/2017 08:46 | doc, just sell on news...same old, same old | sportbilly1976 | |
26/10/2017 08:46 | Mattjos I disagree and really don’t understand your views on the update. There is so much to digest that it deserved a few rns’s. I am sure much news will follow detailing exploration results of the many areas mentioned. | bleepy | |
26/10/2017 08:44 | They are ridiculously cheap. AAM are in a new mindset regarding news releases, I expect a lot more of them now than we used to get. I've had a few more as well. | celeritas | |
26/10/2017 08:42 | any particular reason for this remarkable drop this morning? anything in the RNS that i couldn't understand? | doc_oj | |
26/10/2017 08:39 | Do you really think so. I thought this were ridiculously cheap before. so what are they now ? | jeanesy | |
26/10/2017 08:34 | Deservedly so, imo.This should not have been telegraphed separately as it contains nothing new or of value.Market is going to interpret this as nothing more than a very long way of saying that we're all very busy chaps ... so why say it? | mattjos | |
26/10/2017 08:34 | A 10% drop seems crazy to me , anyone would think that the news was bad, just not meat on the bones as Matt has said. decided to top up under 30p . Never thought i would see that price again. | jeanesy | |
26/10/2017 08:29 | Price is plummeting !!! | jeanesy | |
26/10/2017 08:24 | Very underwhelming. Just a very wordy pithy statement.I don't doubt the strategy or the effort & am sure it will be successful but, this particular piece should be RNS-Non. | mattjos | |
26/10/2017 08:18 | A few 'sell on news' brigade out as per at the opening... | sportbilly1976 | |
26/10/2017 08:14 | Highlights · Exploration underway at newly producing Ugur open pit mine with the objective of defining extensions of similar mineralisation to increase resource inventory · On-going drilling programme at Gedabek open pit to evaluate and optimise the mine plan ahead of recommencement of mining activities in Q1 2018 · Recommencement of Gadir underground mine following temporary pause in mining ore since February 2017 to enable development and exploration drilling: o Drilling has confirmed that Gadir can recommence production in Q4 2017 o Continuity of mineralisation demonstrated following evaluation of further down dip potential o First phase of the tunnel between Gadir and Gedabek underground mineralisation completed with Gedabek style mineralisation intersected - tunnel extension to continue into 2018 · Low-cost exploration work successfully completed at Ordubad contract licence with encouraging initial results confirming presence of surface and underground gold and copper mineralisation · Gedabek tailings dam wall raise to support planned expansion now underway - wall is being raised to provide additional six metres of vertical capacity in first phase and a further six metres in second phase - scheduled for completion by the end of 2017 | bleepy | |
26/10/2017 08:12 | Outstanding update outlining present and future expansion. They have been and are going at it at a rate of knots. Well done again Aaz. | bleepy | |
26/10/2017 08:01 | mmh plenty going on to wet the appetite,.. without giving too much away as to what has been found as regards numbers and figures from samples taken, we will just have to wait longer for those. Interesting news about orubad. | jeanesy | |
26/10/2017 07:30 | Cracking update - laying down the strategy for the end of this year and going into 2018. | 2prsimo |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions