ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

POLY Polymetal International Plc

215.00
0.00 (0.00%)
13 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Polymetal International Plc LSE:POLY London Ordinary Share JE00B6T5S470 ORD NPV
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 215.00 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Polymetal International PLC Q1 2017 Production Results (6858C)

19/04/2017 7:00am

UK Regulatory


Polymetal (LSE:POLY)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Polymetal Charts.

TIDMPOLY

RNS Number : 6858C

Polymetal International PLC

19 April 2017

 
 
  Release time    IMMEDIATE 
Date            19 April 2017 
 

Polymetal International plc

Q1 2017 production results

Polymetal International plc (LSE, MOEX: POLY, ADR: AUCOY) (together with its subsidiaries - "Polymetal", the "Company", or the "Group") is pleased to announce the Group's production results for the first quarter ended March 31, 2017.

HIGHLIGHTS

-- Polymetal produced 280 Koz of gold equivalent (GE) in Q1 2017 which is an 8% increase over Q1 2016. A strong performance at Omolon and contributions from our newly acquired operations - Komar (Varvara) and Kapan added to the positive momentum in the period.

-- Gold production for the quarter increased 18% over 2016 to 199 Koz, while, as expected, silver production decreased 15% due to the anticipated grade decline at Dukat.

-- Gold and silver sales in the period lagged production due to the traditional shutdown of Russian refineries in January, and a seasonal increase of concentrate in transit from Dukat to off-takers. This working capital accumulation is expected to reverse by Q4 2017.

-- At Kyzyl, construction and pre-stripping activities are progressing in line with the project schedule. Kyzyl is on track to produce its first concentrate in Q3 2018.

-- The ompany is pleased to report that the introduction of a new Critical Risks Management system is now complete, contributing to a material improvement in the Company's safety performance in Q1 2017 with LTIFR of 0.12, a 37% decrease compared to the prior year period, and no fatalities.

-- Net debt increased from US$ 1,329 million as at 31 December 2016 to US$ 1,506 million as at 31 March 2017, due to the lag between production and sales, seasonal advance purchases of diesel fuel, and increased spending at Kyzyl. As in prior years, free cash flow generation will be skewed towards the second half of the year, with input from Mayskoye concentrate sales and seasonal heap leach production at Svetloye.

-- The Company reconfirms its production guidance of 1.40 Moz of gold equivalent in FY2017 at total cash costs of US$ 600-650/ GE oz and all-in sustaining cash costs of US$ 775-825/GE oz. The cost guidance remains contingent on the Rouble/Dollar exchange rate dynamic that has a significant effect on the Group's Rouble-denominated operating costs.

"We are pleased to report a strong start to the year with a solid set of production results that were further enhanced by our recently acquired assets", said Vitaly Nesis, Group CEO of Polymetal, commenting on the results. "We remain on track to deliver on our production and cost targets for the current year".

 
                                                                 3 months ended Mar 31,           % change(1) 
                                                              ---------------------------  ------------------------ 
                                                                   2017          2016 
                                                              -------------  ------------  ------------------------ 
 
 Waste mined, Mt                                                   25.5          13.7                +86% 
 Underground development, km                                       24.9          20.2                +24% 
 Ore mined, Kt                                                    3,314          2,998               +11% 
   Open-pit                                                       2,203          2,191                +1% 
   Underground                                                    1,110           807                +38% 
 Ore processed, Kt                                                2,843          2,506               +13% 
 Production 
   Gold, Koz                                                       199            169                +18% 
   Silver, Moz                                                     6.1            7.2                -15% 
   Copper, Kt                                                      0.5            0.2                +88% 
   Zinc, Kt                                                        1.1             -                 NA(5) 
   Gold equivalent, Koz(2)                                         280            260                 +8% 
 Sales 
   Gold, Koz                                                       176            162                 +9% 
   Silver, Moz                                                     4.6            6.5                -28% 
   Copper, Kt                                                      0.1             -                  NA 
   Zinc, Kt                                                        0.5             -                  NA 
   Revenue, US$m(3)                                                298            286                 +4% 
 Net debt, US$m(4)                                                1,506          1,329               +13% 
 Safety(6) 
   LTIFR                                                           0.12          0.19                -37% 
   Fatalities                                                       -              -                  NA 
            Notes: (1) % changes can be different from zero even when absolute numbers are unchanged because 
             of rounding. Likewise, % changes can be equal to zero when absolute numbers differ due to 
             the same reason. This note applies to all tables in this release. 
             (2) Based on 1:80 Ag/Au, 5:1 Cu/Au and 2:1 Zn/Au conversion ratios. 
             (3) Calculated based on the unaudited consolidated management accounts. Concentrate sales 
             are recorded based on forward prices for the expected dates of final settlement and concentrate 
             revenue is presented net of refining and treatment charges. 
             (4) Non-IFRS measure, based on unaudited consolidated management accounts. Net debt equals 
             to current and non-current borrowings less cash and cash equivalents. Comparative information 
             is presented for 31 December 2016. 
             (5) NA = not available. 
             (6) LTIFR =lost time injury frequency rate per 200,000 hours worked. 
 

PRODUCTION BY MINE

 
                        3 months ended March 31,    % change(1) 
                                                      (Y-o-Y) 
                      ---------------------------  ------------ 
                           2017          2016 
                      -------------  ------------  ------------ 
 
 GOLD EQ. (KOZ) (2) 
 Dukat                      79            98           -20% 
 Albazino-Amursk            68            64            +7% 
 Omolon                     51            29           +72% 
 Mayskoye                   5             11           -51% 
 Varvara                    29            14           +109% 
 Voro                       26            28            -7% 
 Okhotsk                    11            15           -26% 
 Kapan                      10             -           +100% 
--------------------  -------------  ------------  ------------ 
 TOTAL                     280            260           +8% 
 

Notes: (1) % changes can be different from zero even when absolute numbers are unchanged because of rounding. Likewise, % changes can be equal to zero when absolute numbers differ due to the same reason. This note applies to all tables in this release.

(2) Based on 1:80 Ag/Au, 5:1 Cu/Au and 2:1 Zn/Au conversion ratios.

CONFERENCE CALL AND WEBCAST

Polymetal will hold a conference call and webcast on Wednesday, 19 April, 14:00 London time (16:00 Moscow time).

To participate in the call, please dial:

8 10 800 204 140 11 access code 85704505# (free from Russia), or

+44 20 3367 9456 (free from the UK), or

+1 855 402 7762 (free from the US), or

any of the above numbers (from outside the UK, the US and Russia) or follow the link:

http://www.audio-webcast.com/cgi-bin/visitors.ssp?fn=visitor&id=4483.

Please be prepared to introduce yourself to the moderator or register.

Webcast replay will be available on Polymetal's website (www.polymetalinternational.com) and at http://www.audio-webcast.com/cgi-bin/visitors.ssp?fn=visitor&id=4483. A recording of the call will be available immediately after the call at +44 20 3367 9460 (from within the UK), 1 877 6423 018 (USA Toll Free) and +7 495 745 79 48 (from within Russia), access code 307897#, from 14:00 London time (16:00 Moscow time) Wednesday, April 19, till 14:00 London time (16:00 Moscow time) Wednesday, April 26, 2017.

Enquiries

 
 Media                                  Investor Relations 
-----------------  ------------------  ---------------------------------------------------- 
 FTI Consulting     +44 20 3727 1000    Polymetal             ir@polymetalinternational.com 
  Leonid Fink                            Evgenia Onuschenko    +44 20 7016 9505 (UK) 
  Jenny Payne                            Maryana Nesis 
                                         MichaelVasiliev       +7 812 334 3666 (Russia) 
-----------------  ------------------  --------------------  ------------------------------ 
 Joint Corporate Brokers 
-------------------------------------  ---------------------------------------------------- 
 Morgan Stanley 
  Sam McLennan 
  Richard Brown     +44 20 7425 8000 
 
  Panmure Gordon                        RBC Europe Limited 
  Adam James                             Tristan Lovegrove 
  Tom Salvesen       +44 20 7886 2500    Marcus Jackson       +44 20 7653 4000 
-----------------  ------------------  --------------------  ------------------------------ 
 

FORWARD-LOOKING STATEMENTS

THIS RELEASE MAY INCLUDE STATEMENTS THAT ARE, OR MAY BE DEEMED TO BE, "FORWARD-LOOKING STATEMENTS". THESE FORWARD-LOOKING STATEMENTS SPEAK ONLY AS AT THE DATE OF THIS RELEASE. THESE FORWARD-LOOKING STATEMENTS CAN BE IDENTIFIED BY THE USE OF FORWARD-LOOKING TERMINOLOGY, INCLUDING THE WORDS "TARGETS", "BELIEVES", "EXPECTS", "AIMS", "INTS", "WILL", "MAY", "ANTICIPATES", "WOULD", "COULD" OR "SHOULD" OR SIMILAR EXPRESSIONS OR, IN EACH CASE THEIR NEGATIVE OR OTHER VARIATIONS OR BY DISCUSSION OF STRATEGIES, PLANS, OBJECTIVES, GOALS, FUTURE EVENTS OR INTENTIONS. THESE FORWARD-LOOKING STATEMENTS ALL INCLUDE MATTERS THAT ARE NOT HISTORICAL FACTS. BY THEIR NATURE, SUCH FORWARD-LOOKING STATEMENTS INVOLVE KNOWN AND UNKNOWN RISKS, UNCERTAINTIES AND OTHER IMPORTANT FACTORS BEYOND THE COMPANY'S CONTROL THAT COULD CAUSE THE ACTUAL RESULTS, PERFORMANCE OR ACHIEVEMENTS OF THE COMPANY TO BE MATERIALLY DIFFERENT FROM FUTURE RESULTS, PERFORMANCE OR ACHIEVEMENTS EXPRESSED OR IMPLIED BY SUCH FORWARD-LOOKING STATEMENTS. SUCH FORWARD-LOOKING STATEMENTS ARE BASED ON NUMEROUS ASSUMPTIONS REGARDING THE COMPANY'S PRESENT AND FUTURE BUSINESS STRATEGIES AND THE ENVIRONMENT IN WHICH THE COMPANY WILL OPERATE IN THE FUTURE. FORWARD-LOOKING STATEMENTS ARE NOT GUARANTEES OF FUTURE PERFORMANCE. THERE ARE MANY FACTORS THAT COULD CAUSE THE COMPANY'S ACTUAL RESULTS, PERFORMANCE OR ACHIEVEMENTS TO DIFFER MATERIALLY FROM THOSE EXPRESSED IN SUCH FORWARD-LOOKING STATEMENTS. THE COMPANY EXPRESSLY DISCLAIMS ANY OBLIGATION OR UNDERTAKING TO DISSEMINATE ANY UPDATES OR REVISIONS TO ANY FORWARD-LOOKING STATEMENTS CONTAINED HEREIN TO REFLECT ANY CHANGE IN THE COMPANY'S EXPECTATIONS WITH REGARD THERETO OR ANY CHANGE IN EVENTS, CONDITIONS OR CIRCUMSTANCES ON WHICH ANY SUCH STATEMENTS ARE BASED

DUKAT OPERATIONS

 
                                 3 months ended Mar 31,    % change 
                               -------------------------  --------- 
                                   2017          2016 
                               ------------  -----------  --------- 
 MINING 
 Dukat 
 Underground development, m        8,012        8,575        -7% 
 Ore mined (underground), Kt        399          420         -5% 
 
 Goltsovoye 
 Underground development, m        1,387        1,754        -21% 
 Ore mined (underground), Kt        45            48         -5% 
 
 Perevalnoye 
 Underground development, m         502           -         +100% 
 
 Lunnoye + Arylakh 
 Underground development, m        1,648        1,103        +49% 
 Ore mined (underground), Kt        144          108         +34% 
 
   TOTAL HUB 
 Underground development, m       11,549        11,432       +1% 
 Ore mined (underground), Kt        588          575         +2% 
 
 PROCESSING 
 Dukat 
 Ore processed, Kt                  476          498         -4% 
 Grade 
   Gold, g/t                        0.5          0.5         -14% 
   Silver, g/t                      329          380         -13% 
 Recovery(1) 
   Gold                            83.6%        85.8%        -3% 
   Silver                          87.6%        85.2%        +3% 
 Production 
   Gold, Koz                        5.6          7.3         -24% 
   Silver, Moz                      4.3          5.3         -19% 
 
   Lunnoye 
 Ore processed, Kt                  113          110         +3% 
 Grade 
   Gold, g/t                        1.3          1.8         -27% 
   Silver, g/t                      381          494         -23% 
 Recovery(1) 
   Gold                            91.9%        92.6%        -1% 
   Silver                          92.5%        92.5%        -0% 
 Production 
   Gold, Koz                        4.3          5.7         -25% 
   Silver, Moz                      1.3          1.6         -20% 
 TOTAL PRODUCTION 
   Gold, Koz                        9.8          13.0        -24% 
   Silver, Moz                      5.5          6.8         -19% 
 

Note: (1) Technological recovery, includes gold and silver within work-in-progress inventory (concentrate, precipitate)

Q1 silver production at Dukat decreased 24% year-on-year to 5.5 Moz due to anticipated grade decline. The Goltsovoye mine is starting to wind down and the share of lower-grade feed from Lunnoye at the Omsukchan concentrator is increasing. The concentrator continues to operate significantly above nameplate throughput capacity and demonstrated a meaningful improvement in the silver recovery rate.

At Lunnoye, ore mined volumes increased by 34% year-on-year as the new Zone 5 vein was brought into production. Gold and silver production declined 25% and 20% respectively, as higher-grade tonnage from the Zone 7 vein has declined significantly.

At Perevalnoye, one of Dukat's satellite deposits, underground development has commenced with first ore expected in Q4 2017.

 
 ALBAZINO-AMURSK                  3 months ended Mar 31,    % change 
                                -------------------------  --------- 
                                    2017          2016 
                                ------------  -----------  --------- 
 MINING 
 Waste mined, Kt                    4,401        4,094        +7% 
 Underground development, m         1,587        1,419        +12% 
 Ore mined, Kt                       482          452         +7% 
 Open-pit                            406          388         +5% 
 Underground                         76            63         +20% 
 
 PROCESSING 
 Albazino concentrator 
 Ore processed, Kt                   417          400         +4% 
 Gold head grade, g/t                4.7          4.9         -5% 
 Gold recovery(1)                   86.3%        85.6%        +1% 
 Concentrate produced, Kt           35.3          33.0        +7% 
  Concentrate gold grade, g/t       48.6          52.0        -7% 
  Gold in concentrate, Koz(2)       55.1          55.1        -0% 
 
 Amursk POX 
 Concentrate processed, Kt          43.1          40.1        +8% 
 Gold head grade, g/t               53.0          51.0        +4% 
 Recovery                           96.1%        94.1%        +2% 
 Gold produced, Koz(3)              68.3          64.1        +7% 
 TOTAL PRODUCTION 
   Gold, Koz(3)                     68.3          64.1        +7% 
 
   Notes:     (1) To concentrate 

(2) For information only; not considered as gold produced and therefore not reflected in the table representing total production. Included in total production upon completion of downstream processing at the Amursk POX

(3) Q1 2016 now includes gold produced from the third-party concentrate, previously accounted in Mayskoye production

At Albazino-Amursk, gold production in the first quarter of 2017 increased 7% over 2016, mainly driven by higher recoveries and the re-introduction of 3(rd) party concentrate to the feed at Amursk.

The moderate grade decline at Albazino was offset by increased throughput and improved recoveries at the concentrator, resulting in flat gold in concentrate production. Underground mine productivity and dilution control continues to improve resulting in an increase in underground ore mined both year-on-year and quarter-on-quarter.

The POX debottlenecking project is on schedule with earthworks and concrete foundations for the oxygen plant now complete. In addition, the water treatment section has been fully debottlenecked, resulting in improved recovery levels. Polymetal plans to ramp up the debottlenecked POX plant to its full expanded capacity in the second half of 2018, in time to take feed from the Kyzyl concentrator.

A 7-week shutdown commenced on April 6th and will incorporate, among regular maintenance, partial vessel re-lining and the completion of necessary adjustments for the debottlenecking project.

OMOLON OPERATIONS

 
                                 3 months ended Mar 31,    % change 
                               -------------------------  --------- 
                                   2017          2016 
                               ------------  -----------  --------- 
 MINING 
 Sopka 
 Waste mined, Kt                    427           -           NA 
 
 Tsokol 
 Underground development, m         905          915         -1% 
 Ore mined (underground), Kt        35            6         +493% 
 
 Birkachan 
 Waste mined, Kt                     -           396        -100% 
 Underground development, m        1,146          -           NA 
 Ore mined, Kt                      27           302         -91% 
  Open-pit                           -           302        -100% 
  Underground                       27            -           NA 
 
 Oroch 
 Waste mined, Kt                    109         1,446        -92% 
 Ore mined (open pit), Kt           81           217         -62% 
 
 Olcha 
 Waste mined, Kt                    184           -           NA 
 Underground development, m         506           -           NA 
 Ore mined (open pit), Kt           73            -           NA 
 
 TOTAL HUB 
 Waste mined, Kt                    719         1,842        -61% 
 Underground development, m        2,557         915        +179% 
 Ore mined, Kt                      216          525         -59% 
  Open-pit                          154          519         -70% 
  Underground                       62            6           NM 
 
 PROCESSING 
 
   Kubaka Mill 
 Ore processed, Kt                  215          205         +5% 
 Grade 
   Gold, g/t                        7.3          4.8         +54% 
   Silver, g/t                      22            27         -19% 
 Recovery(1) 
   Gold                            93.7%        93.3%        +0% 
   Silver                          78.7%        78.1%        +1% 
 Gold production, Koz              49.0          28.3        +73% 
 Silver production, Moz             0.1          0.1         +43% 
 TOTAL PRODUCTION 
   Gold, Koz                       49.0          28.3        +73% 
   Silver, Moz                      0.1          0.1         +43% 
 
   Note:       (1) Technological recovery, includes gold and silver within work-in-progress inventory 

Omolon has delivered a strong set of results in the first quarter of 2017 with gold production jumping by 73% year-on-year. The gold grade in ore processed increased 54% compared to 2016 on the back of higher-grade ore from the new Olcha open pit, as well as Tsokol and Birkachan underground mines.

Open-pit mining at Olcha and Oroch has been completed, with equipment and personnel relocated to Sopka where the open pit is anticipated to deliver first ore in Q4 2017. In the meantime, underground development started at Olcha where first ore is expected in Q4 2017.

MAYSKOYE

 
                                  3 months ended Mar 31,    % change 
                                -------------------------  --------- 
                                    2017          2016 
                                ------------  -----------  --------- 
 MINING 
 Waste mined, Kt                    1,018          -         +100% 
 Underground development, m         4,608        5,328        -14% 
 Ore mined, Kt                       254          121        +110% 
  Open-pit                           23            -          +100% 
  Underground                        231          121         +91% 
 
 PROCESSING 
 Ore processed, Kt                   207          148         +39% 
 Gold grade, g/t                     6.2          6.2         +0% 
 Gold recovery(1)                   87.1%        87.6%        -1% 
 Concentrate produced, Kt           18.6          15.3        +21% 
  Concentrate gold grade, g/t       60.4          53.5        +13% 
  Gold in concentrate, Koz(2)       36.1          26.3        +37% 
 
 Amursk POX 
 Concentrate processed, Kt           4.2          5.8         -27% 
 Gold grade, g/t                    48.6          57.6        -16% 
 Recovery                           96.1%        94.1%        +2% 
 Gold produced, Koz                  5.2          10.6        -51% 
 
 TOTAL PRODUCTION 
   Gold, Koz                         5.2          10.6        -51% 
 
   Notes:     (1) To concentrate 

(2) For information only; not considered as gold produced and therefore not reflected in the table representing total production. Included in total production upon sale to off-taker or internal downstream processing to saleable metal product.

(3) Q1 2016 now excludes gold produced from the third-party concentrate, which is accounted in Albazino/Amursk production

At Mayskoye, gold production in Q1 2017 totalled 5.2 Koz, a 51% drop from the prior year period as most of Mayskoye concentrate is stockpiled in the port of Pevek for third-party off-takers, and Amursk POX capacity is taken up by third-party material.

The new underground mining method (sublevel open stoping with backfill) at Mayskoye continues to make good progress as the total amount of ore mined during the quarter grew 110% to 254 Kt year-on-year and 12% compared to Q4 2016.

The improvement in mining led to increased processing volumes at the concentrator, up 39% compared to the previous year. Gold grades remained flat year-on-year at 6.2 g/t and increased 15% over Q4 2016. The focus remains on achieving rapid backfill to ensure lower dilution from secondary stopes and to enable reduced primary stope length.

The Company has made meaningful progress on the project to extract crown pillars at Zones 1 and 2 by open-pit mining. First ore from the open pit was mined in Q1 2017 and the leaching circuit is scheduled to start processing ore in Q3 2017. The crown pillar project is planned to result in materially higher production at Mayskoye in 2017 on the back of higher grades in the open pit.

VARVARA

 
                                       3 months ended Mar 31,    % change 
                                     -------------------------  --------- 
                                         2017          2016 
                                     ------------  -----------  --------- 
 MINING 
 Varvara 
 Waste mined, Kt                         3,677        4,888        -25% 
 Ore mined (open pit), Kt                 502          659         -24% 
 
      *    float ore                      139           4           NM 
 
      *    leach ore                      363          655         -45% 
 
 Komarovskoye 
 Waste mined, Kt                         2,304          -           NA 
 Ore mined (open pit), Kt                 433           -           NA 
 
   TOTAL HUB 
 Waste mined, Kt                         5,981        4,888        +22% 
 Ore mined (open pit), Kt                 935          659         +42% 
 
 PROCESSING 
 Flotation 
 Ore processed, Kt                        57           123         -54% 
 Grade 
    Gold, g/t                             1.9          1.0         +85% 
    Copper                               0.56%        0.31%        +80% 
 Recovery(1) 
   Gold                                  61.0%        57.6%        +6% 
   Copper                                76.1%        67.5%        +13% 
 Production 
   Gold (in concentrate), Koz             1.6          1.6         -3% 
   Copper (in concentrate), Kt            0.2          0.2         -13% 
 
 Toll-treated ore processed, Kt(2)        11            -         +100% 
 
   Leaching 
   Ore processed, Kt                      738          626         +18% 
   Gold grade, g/t                        1.4          0.7         +92% 
 Gold recovery(1)                        82.1%        72.6%        +13% 
 Gold production, Koz                    26.1          10.9       +140% 
 
 Total ore processed, Kt                  805          749         +8% 
 
 TOTAL PRODUCTION 
 Gold, Koz                               27.6          12.5       +121% 
 Copper, Kt                               0.2          0.2         -13% 
 
   Note:       (1) Technological recovery, includes gold and copper within work-in-progress inventory 

(2) To be further processed at Amursk POX.

In the first quarter, Varvara delivered a 121% increase in gold production over the previous year. A strong improvement in grades and recovery levels in the leaching circuit was enabled by the quick ramp-up in ore railed from Komar. The successful streamlining of ore logistics from Komar to the Varvara processing plant prompted the decision to shift more mining and processing volumes from Varvara to Komar.

The results of significant in-fill and step-out drilling at Komar together with the updated cost estimates based on recent performance, will form the foundation for the re-assessment of Komar mineral resources and ore reserves. The updated estimate is expected to be completed in Q4 2017.

In the period, Varvara toll-treated some of the refractory gold ore bought by Polymetal in Russia. The produced gold concentrate will then be processed at the Amursk POX facility. Gold production from this material will be booked following dore production from concentrate at Amursk.

VORO

 
                              3 months ended Mar 31,    % change 
                            -------------------------  --------- 
                                2017          2016 
                            ------------  -----------  --------- 
 MINING 
 Voro 
 Waste mined, Kt                2,519        2,651        -5% 
 Ore mined (open pit), Kt        420          305         +38% 
 
      *    primary               367          291         +26% 
 
      *    oxidised              53            14        +295% 
 
 PROCESSING 
 Voro Heap Leach 
 Ore stacked, Kt                  -            -           NA 
 Gold grade, g/t                  -            -           NA 
 Gold production, Koz            2.5          2.9         -12% 
 Voro CIP 
 Ore processed, Kt               247          245         +1% 
 Gold grade, g/t                 3.6          4.3         -18% 
 Gold recovery(1)               80.0%        78.7%        +2% 
 Gold production, Koz           23.3          24.9        -6% 
 TOTAL PRODUCTION 
   Gold, Koz                    25.9          27.8        -7% 
 
   Note:       (1) Technological recovery, includes gold within work-in-progress inventory 

Gold production at Voro in Q1 2017 decreased 7% year-on-year, due to a scheduled grade decline at the CIP processing plant. Ore stacking for the heap leach operation is expected to commence in Q2 2017.

Ore mining at Voro increased by 38% year-on-year to 420 Kt, and continues to be focused on primary ore as oxidised ore reserves are nearing depletion.

OKHOTSK OPERATIONS

 
                                 3 months ended Mar 31,    % change 
                               -------------------------  --------- 
                                   2017          2016 
                               ------------  -----------  --------- 
 MINING 
 Avlayakan 
 Underground development, m        1,244        1,072        +16% 
 Ore mined (underground), Kt        39            42         -6% 
 
 Svetloye 
 Waste mined, Kt                    189          269         -30% 
 Ore mined (open pit), Kt           264          320         -17% 
 
 TOTAL HUB 
 Waste mined, Kt                    189          269         -30% 
 Underground development, m        1,244        1,072        +16% 
 Ore mined, Kt                      303          361         -16% 
   Open-pit                         264          320         -17% 
   Underground                      39            42         -6% 
 
 PROCESSING 
 Khakanja 
 Ore processed, Kt                  153          152         +1% 
 Grade 
   Gold, g/t                        1.3          2.6         -49% 
   Silver, g/t                      100           69         +44% 
 Recovery(1) 
   Gold                            96.9%        94.9%        +2% 
   Silver                          73.9%        74.7%        -1% 
 Gold production, Koz               7.0          12.3        -43% 
 Silver production, Moz             0.3          0.2         +39% 
 
 Svetloye Heap Leach 
 Ore stacked, Kt                    96            -           NA 
 Gold grade, g/t                    3.8           -           NA 
 
 TOTAL PRODUCTION 
   Gold, Koz                        7.0          12.3        -43% 
   Silver, Moz                      0.3          0.2         +39% 
 

Note: (1) Technological recovery, includes gold and silver within work-in-progress inventory (precipitate)

At Okhotsk, gold production in the first quarter decreased by 43% year-on-year due to anticipated grade decline processed from the historic ore stockpiles. Silver production grew 39% to 0.3 Moz, as 3(rd) -party ore with higher silver grades was introduced to the feed.

Svetloye seasonal heap leach operation is anticipated to resume in Q2 2017 and deliver substantial gold production in H2 2017.

Avlayakan's life-of-mine has been extended to H2 2018 with further positive down-dip exploration results received in the quarter.

KAPAN

 
                                3 months ended Mar 31,    % change 
                              -------------------------  --------- 
                                   2017         2016 
                              -------------  ----------  --------- 
 MINING 
 Underground development, m       3,368           -          NA 
 Ore mined (underground), Kt       115            -          NA 
 
 PROCESSING 
 Ore processed, Kt                 115            -          NA 
 Grade 
  Gold, g/t                        2.1            -          NA 
  Silver, g/t                      43.0                      NA 
  Copper, %                       0.27%           -          NA 
  Zinc, %                         1.33%                      NA 
 Recovery 
  Gold                            83.1%           -          NA 
  Silver                          83.0%                      NA 
  Copper                          90.9%           -          NA 
  Zinc                            88.3%                      NA 
 
 TOTAL PRODUCTION 
   Gold, Koz                       5.8            -          NA 
   Silver, Moz                     0.1            -          NA 
   Copper, Kt                      0.3                       NA 
   Zinc, Kt                        1.1            -          NA 
 

In Q1 2017, Kapan achieved an important milestone by mining the highest monthly ore tonnage in more than 10 years, reflecting the ongoing improvement measures to debottleneck the underground mine.

Quarterly gold production at Kapan increased 52% to 5.8 Koz, with higher ore volumes processed and substantially improved grades of 2.1 g/t, up 31% quarter-on-quarter.

In the meantime, in-fill and step-out drilling is underway at Lichkvaz, a satellite deposit that is expected to provide additional tonnage to the existing concentrator.

We remain on track to producing a JORC-compliant reserve estimate and a combined LOM for Kapan and Lichkvaz in Q3 2017.

KYZYL

 
                    3 months ended Mar 31,    % change 
                  -------------------------  --------- 
                       2017          2016 
                  --------------  ---------  --------- 
 MINING 
 
 Waste mined, Kt      10,698          -          NA 
 

In Q1 2017, a record amount of waste was mined at Kyzyl. Mining activities are on schedule and continue to focus on pre-stripping.

The processing plant building is now fully enclosed and winterized, with foundation works for processing equipment currently underway. Project development remains on schedule, with the mill foundations 50% complete and construction activities focused on site infrastructure. Engineering and design has been finalised. The boiler houses for the village and the plant have been commissioned.

Dams for the tailings storage facility have been completed. Installation of water isolation will commence after the arrival of consistent above-zero temperatures.

OTHER DEVELOPMENTS

At Prognoz, in which Polymetal acquired a 5% indirect interest on January 19, the winter road has been completed and drilling activities are currently underway.

At Nezhda, following an extensive exploration campaign in 2016, we expect to produce an initial JORC reserve and resource estimate at Nezhda's Zone 1 in 2017. In-fill drilling and geomechanical studies are currently underway.

HEALTH AND SAFETY

Polymetal is pleased to report that in the first quarter of 2017, we decreased LTIFR by 37% to 0.12 compared to 0.19 in the prior year period. This improvement is largely attributable to the newly introduced Critical Risks Management System that is expected to decrease risk to the health and safety of our employees,

In the course of 2017, we will continue moving towards our overarching goal of eliminating accidents and fatalities at all of our operations.

This information is provided by RNS

The company news service from the London Stock Exchange

END

DRLSFDSIUFWSEIL

(END) Dow Jones Newswires

April 19, 2017 02:00 ET (06:00 GMT)