Share Name |
Share Symbol |
Market |
Type |
Share ISIN |
Share Description |
Andalas Energy And Power Plc |
LSE:ADL |
London |
Ordinary Share |
IM00BZ7PNY71 |
ORD NPV |
|
Price Change |
% Change |
Share Price |
Bid Price |
Offer Price |
High Price |
Low Price |
Open Price |
Shares Traded |
Last Trade |
|
0.00 |
0.0% |
0.20 |
0.19 |
0.21 |
|
|
- |
0.00 |
00:00:00 |
Industry Sector |
Turnover (m) |
Profit (m) |
EPS - Basic |
PE Ratio |
Market Cap (m) |
Alternative Energy |
0.0 |
-3.0 |
-0.8 |
- |
2 |
Andalas Energy And Power Share Discussion Threads

Showing 5126 to 5145 of 5225 messages
Date | Subject | Author | Discuss |
---|
19/9/2019 10:02 | You want a top |  ronjoe77 | |
19/9/2019 10:00 | At Ayr today |  ronjoe77 | |
19/9/2019 09:58 | LOL whats up Ron hows the gambling going.. |  therealtonythetiger | |
19/9/2019 09:57 | One black conman lol |  ronjoe77 | |
19/9/2019 09:56 | Tomy u false mf |  ronjoe77 | |
19/9/2019 09:40 | Ok going to aye in north coast |  ronjoe77 | |
19/9/2019 09:36 | Pos share dog |  jammydodger1 | |
19/9/2019 09:31 | Tony con man |  ronjoe77 | |
19/9/2019 09:16 | OMG Tony still still here you have faith lol love you heart. Lol ? |  ronjoe77 | |
18/9/2019 06:26 | Andalas Energy and Power Plc, the AIM traded upstream oil and gas company (AIM: ADL), is pleased to announce an operations update on the Betun Selo KSO, in which it has a production interest further to the agreement announced on 21 June 2019. The Company is currently undertaking a 4-well workover programme on the project. The Betun Field is currently producing 84.8 barrels of oil per day ("bopd") (gross).
· BTN 01: currently producing at a most recently tested rate of 10.4 bopd. This well was put back on production yesterday following further work on the pump which is now being operated at a reduced rate pending commissioning of the water disposal facilities referred to below. A further update will be provided as set out below.
· BTN 03: currently shut-in. Permits to enable the perforating gun explosives to be transported from Subang, West Java to Prabumulih have been issued and the explosives are being moved to the storage bunker. A further permit will be required to move the explosives from the bunker to site. A further update will be provided in due course.
· BTN 04: currently producing at a most recently tested rate of 44.0 bopd.
· BTN 14: currently producing at a most recently tested rate of 30.1 bopd.
· Following the workovers of both BTN 01 and BTN 14, produced water rates have increased significantly requiring both wells to be cut back to the current rates until a larger water injection pump (4,500 bfpd), currently being commissioned, is fully operational, which will take the installed water injection pumping capacity from 2,000 bfpd to 6,500 bfpd. Additional tankage is also being sourced. A further update will be provided after the new water injection pump has been commissioned and pumping rates have been increased and tested.
Andalas Energy, CEO, Simon Gorringe said "We are pleased with progresss at Betun Selo. The work programme is delivering results and we look forward to getting on with the workover of BTN 03." |  therealtonythetiger | |
06/9/2019 18:58 | They can't delay news good or bad you plonker, aim rules. It's either not ready or held up with the nomad. |  chesycustard | |
06/9/2019 18:12 | So where is that BTN-01 news? Only bad news gets delayed. |  sweet karolina2 | |
22/8/2019 13:50 | and it looks as if it's very good.... |  domple | |
22/8/2019 13:31 | BTN-01 news incoming |  therealtonythetiger | |
22/8/2019 13:11 | Will we get an update tomorrow? |  dr samsam | |
20/8/2019 20:01 | ARC MINERALS.. Oh Dear... |  therealtonythetiger | |
19/8/2019 13:07 | short-term traders hoping to make a quick buck on latest news not quite achieving it..... |  domple | |
18/8/2019 14:37 | I saw that CAV>AOGL>ADL link.. |  therealtonythetiger | |
18/8/2019 14:06 | Attis oil & gas ltd |  90005nelson | |
18/8/2019 09:54 | AOGL? Sorry can't work out what that is/means? |  tunley | |