ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

AMER Amerisur Resources Plc

19.18
0.00 (0.00%)
14 Jun 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Amerisur Resources Plc LSE:AMER London Ordinary Share GB0032087826 ORD 0.1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 19.18 19.18 19.20 - 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Amerisur Resources Share Discussion Threads

Showing 84401 to 84425 of 105625 messages
Chat Pages: Latest  3385  3384  3383  3382  3381  3380  3379  3378  3377  3376  3375  3374  Older
DateSubjectAuthorDiscuss
19/10/2017
09:52
So good I posted it twice.
foiledagain
19/10/2017
09:52
this was the presentation about plat drilling, which is why I consider today's news a success

Significant upside potential:
• U and T Sand development –Pad 2N
• N Sand central anomaly
Work programme 5 wells - 2 development, 1 exploration, 2 appraisal

foiledagain
19/10/2017
09:33
I don't know if the well can be considered a success if it does not produce oil. I've been hunting for the strategy behind Plat-25 but have been unable to find it. It's easy to claim success if you can change what success looks like after the fact.

Having said that, I like the RNS, I'd rather we had a producer, but the work was needed to define the reservoir, the well can now be sidetracked to produce and the RNS read as an honest assessment of where we are. It felt less like a company trying to hide news and more like an honest assessment.

We're in to the latter stages of defining the field and building a strategy to maximise it's productivity, I'm not expecting every well to produce any more.

Seems to have been shrugged off by the market too.

al101uk
19/10/2017
09:26
The train is rolling in the right direction.
dodge city
19/10/2017
09:22
Someone asked:

2nd Oct RNS:

"Platanillo-21, located on Pad 2N was placed on commercial production at approximately 1,000 BOPD on 29 September."

Also, coz I missed it from the 5th July:

"In Platanillo-21, the second well on Pad 2N, a leak in the primary cement job was detected and that well is currently being recompleted after a cement squeeze was performed and is expected to be placed on production in the next week, thus further raising production levels."

al101uk
19/10/2017
09:10
RBC always referred to the OBA as a strategic asset. Once it can transport say 20,000 bopd consistently, it certainly will be and could stimulate some interest in the company from third parties.
blackdown2
19/10/2017
08:11
Astonishing that some must not have their specs on reading that RNS. Very good result, and if or when it creates a production well from that same pad, which was already the pad used for a previous well, costs are much lower. Good use of resources.
foiledagain
19/10/2017
08:10
Steady as she goes, justifies my modest top up this week.
moneylender
19/10/2017
08:09
which part of 25p+ on Oct production figures is negative, in your eyes?
fadilz
19/10/2017
08:06
oops wrong tgread sorry
rutter
19/10/2017
08:05
acv74 - finger in the wind, and hopefully some realism.

1k production, 6k capability (production on producing days):

Also in today's statement: 'routine well service operations have been undertaken on Platanillo 10, 11 and 20'

fadilz
19/10/2017
08:02
I mean plat 21 not plat 25
acv74
19/10/2017
08:00
On the 2nd of October they said current production was 7,400. So if plat 25 is producing at 1k per day (where did that figure come from), and there has been a modest production issue, I'm not sure why you think production will only be nearer 5k than 6k. Do you have some calcs?
acv74
19/10/2017
07:59
Yes, bob in foiledagain
tsmith2
19/10/2017
07:57
Credit where credit is due, this is a triumph in terms of strategy and planning.

To drill an 'exploration' well, gain all the geological data then carry on to find production well, is good management, good use of resources and will result in higher reserves as well as bringing into focus other zones that Amerisur previously encountered oil but did not utilise.

So not only do they line up the darts to ensure more success in future drills, they still intend having a producing well.

Two for the price of one, not exactly, but good strategy nonetheless.

foiledagain
19/10/2017
07:53
Plat-21 was producing at 1k, but will have been out for much of Oct. Capability in Sep was in region of 6k (but actual 4k).

My guess is Oct production will be between 5 and 6k, perhaps nearer 5 than 6. And if true that ought on my model justify share price in mid-20s+.

Barring further hold-ups Nov production might be in 6-7k range, which would justify something around 30p. That's ignoring any contribution from CPO-5 LTT.

fadilz
19/10/2017
07:47
No probs with that, good to have confirmation of N sands, new oil in days,
squiresquire
19/10/2017
07:45
Hi

Can someone explain what n sands and u sands are....
Although my understanding is limited this does not sound like a success. What do you guys think

lordyjordy1
19/10/2017
07:41
Positive comments so far....just waiting for the glass half empty guys now :-)
barbie60
19/10/2017
07:37
"Modest" production interruption.
chopper harris1
19/10/2017
07:35
I actually do like the fact they've mentioned possible production interruption. Honesty always the best policy.
boris cobaka
19/10/2017
07:24
JW Sounds pleased with platanillo and CPO5!!! A very good sign to me as he knows his stuff :))
laptop15
19/10/2017
07:21
N sands better than expected are an exciting prospect and must not be underestimated as could potentially increase reserves substantially. Looking foward to oil flowing from cpo-5 block by end of Oct. Good luck all
seball
19/10/2017
07:14
Those sells yesterday better not be related to today's rns.

Sounds a bit like ukog
'Production from the Platanillo-21 well has been managed carefully in order to minimise water production arising from the incomplete cementation of the 7" casing'

Think we might get bit of a wobble. Nothing majorly exciting and they've indicated possible interruptions to production.

GL all.

boris cobaka
19/10/2017
07:10
Pretty good update all :)))
laptop15
Chat Pages: Latest  3385  3384  3383  3382  3381  3380  3379  3378  3377  3376  3375  3374  Older

Your Recent History

Delayed Upgrade Clock