ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

TTE Totalenergies Se

66.15
-0.50 (-0.75%)
03 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Totalenergies Se LSE:TTE London Ordinary Share FR0000120271 TOTALENERGIES ORD SHS
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  -0.50 -0.75% 66.15 63.10 69.30 224,238 16:35:14
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Crude Petroleum & Natural Gs 219.47B 21.38B 8.7423 7.59 162.32B

Ivory Coast: Total Becomes the Operator of the LNG Terminal Project

25/11/2016 7:37am

Business Wire


Totalenergies (LSE:TTE)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Totalenergies Charts.

Regulatory News:

The CI-GNL (Ivory Coast LNG) consortium led by Total (Paris:FP) (LSE:TTA) (NYSE:TOT) has been awarded the rights to build and operate a liquefied natural gas (LNG) re-gasification terminal in Ivory Coast with a capacity of 3 million tons per year.

The decision announced by the Government of the Ivory Coast on October 4th was followed by the signature of the shareholders’ agreement in Abidjan between Total, which will operate the project with a 34% interest, national companies PetroCI (11%) and CI Energies (5%) as well as SOCAR (26%), Shell (13%), Golar (6%) and Endeavor Energy (5%).

Total will use the terminal to supply LNG volumes from its global portfolio in proportion to its participating interest in the project. The re-gasification terminal project is expected to become operational by mid 2018.

“This project illustrates Total's strategy to develop new gas markets by unlocking access to LNG for fast-growing economies. Working closely with our partners enabled us to put together an integrated proposal combining LNG supply and import infrastructure through a floating storage and re-gasification unit,” said Philippe Sauquet, President Gas, Renewables and Power of Total. “We are very pleased to have been selected by the Ivorian authorities to manage this project, which will meet growing domestic and regional needs for gas and power.”

The project involves the construction of a terminal with a floating storage and re-gasification unit (FSRU) in Vridi, Abidjan area, and a pipeline connecting the FSRU to existing and planned power plants in Abidjan, as well as to regional markets connected to the Ivorian network. This will enable Ivory Coast to become the first regional LNG import Hub in West Africa, and to meet both regional and domestic demand.

* * * * *

About Total

Total is a global integrated energy producer and provider, a leading international oil and gas company, and the world’s second-ranked solar energy operator with SunPower. Our 96,000 employees are committed to better energy that is safer, cleaner, more efficient, more innovative and accessible to as many people as possible. As a responsible corporate citizen, we focus on ensuring that our operations in more than 130 countries worldwide consistently deliver economic, social and environmental benefits. total.com

Cautionary note

This press release, from which no legal consequences may be drawn, is for information purposes only. The entities in which TOTAL S.A. directly or indirectly owns investments are separate legal entities. TOTAL S.A. has no liability for their acts or omissions. In this document, the terms “Total” and “Total Group” are sometimes used for convenience where general references are made to TOTAL S.A. and/or its subsidiaries. Likewise, the words “we”, “us” and “our” may also be used to refer to subsidiaries in general or to those who work for them.This document may contain forward-looking information and statements that are based on a number of economic data and assumptions made in a given economic, competitive and regulatory environment. They may prove to be inaccurate in the future and are subject to a number of risk factors. Neither TOTAL S.A. nor any of its subsidiaries assumes any obligation to update publicly any forward-looking information or statement, objectives or trends contained in this document whether as a result of new information, future events or otherwise.

TotalMike SANGSTERNicolas FUMEXKim HOUSEGORomain RICHEMONTTel. : + 44 (0)207 719 7962Fax : + 44 (0)207 719 7959orRobert HAMMOND (U.S.)Tel. : +1 713-483-5070Fax : +1 713-483-5629

1 Year Totalenergies Chart

1 Year Totalenergies Chart

1 Month Totalenergies Chart

1 Month Totalenergies Chart

Your Recent History

Delayed Upgrade Clock