ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

RPT Regal Petroleum Plc

15.325
0.00 (0.00%)
Last Updated: 01:00:00
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Regal Petroleum Plc LSE:RPT London Ordinary Share GB0031775819 ORD 5P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 15.325 14.75 15.90 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Regal Petroleum PLC MEX-109 Well Hook-up and Flow Testing (0702J)

26/06/2017 7:00am

UK Regulatory


Regal Petroleum (LSE:RPT)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Regal Petroleum Charts.

TIDMRPT

RNS Number : 0702J

Regal Petroleum PLC

26 June 2017

26 June 2017

Regal Petroleum plc

("Regal" or the "Company")

MEX-109 Well Hook-up and Flow Testing

Regal Petroleum plc (AIM: RPT), the AIM-quoted oil and gas exploration and production group, is pleased to announce the hook-up and flow testing of the MEX-109 well located at its Mekhediviska-Golotvshinska (MEX-GOL) gas and condensate field in Ukraine.

One interval in the well, at a drilled depth of 4,802 - 4,808 metres within the B-20 Visean reservoirs ("B-sands") was perforated, and after short-term initial flow testing established gas and condensate flow, works were undertaken to hook-up the well to the gas processing facility.

The hook-up has been completed and flow testing is currently underway to optimise the operating parameters of the well. Although this testing is likely to continue for up to a further four weeks before an optimal operating regime is finalised, the well is demonstrating good flow rates during test periods of approximately 85,000 m(3) /d of gas and 40 m(3) /d of condensate (778 boepd in aggregate).

Prior to the hook-up of MEX-109, average gas, condensate and LPG production from the MEX-GOL and Svyrydivske (SV) fields for the period from 1 January 2017 to 15 June 2017 was 127,041 m(3) /d of gas, 33.6 m(3) /d of condensate and 17.7 m(3) /d of LPG (1,079 boepd in aggregate).

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

For further information, please contact:

 
 Regal Petroleum plc             Tel: 020 3427 
                                  3550 
 Keith Henry, Chairman 
  Sergei Glazunov, Financial 
  Director 
 
 Strand Hanson Limited           Tel: 020 7409 
                                  3494 
 Rory Murphy / Richard Tulloch 
 
 Citigate Dewe Rogerson          Tel: 020 7638 
                                  9571 
 Martin Jackson / Louise Mason 
  / Shabnam Bashir 
 

Philip Frank, PhD Geology, Chartered Geologist, FGS, PESGB, consultant to the Company, has reviewed and approved the technical information contained within this press release in his capacity as a qualified person, as required under the AIM Rules.

 
 Definitions 
 boepd   barrels of oil equivalent 
          per day 
 m(3)    cubic metres per day 
  /d 
 

This information is provided by RNS

The company news service from the London Stock Exchange

END

DRLBLGDLGGDBGRX

(END) Dow Jones Newswires

June 26, 2017 02:00 ET (06:00 GMT)

1 Year Regal Petroleum Chart

1 Year Regal Petroleum Chart

1 Month Regal Petroleum Chart

1 Month Regal Petroleum Chart

Your Recent History

Delayed Upgrade Clock