ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

ACU African Copper

0.055
0.00 (0.00%)
17 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
African Copper LSE:ACU London Ordinary Share GB00B03TH577 ORD 1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.055 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

African Copper PLC African Copper Plc: Production and Exploration Update for the Third Quarter of Fiscal 2014

11/02/2014 7:00am

UK Regulatory



 
TIDMACU 
 
African Copper Plc: Production and Exploration Update for the Third Quarter of Fiscal 2014 
 
FOR:  AFRICAN COPPER PLC 
 
AIM SYMBOL:  ACU 
 
February 11, 2014 
 
African Copper Plc: Production and Exploration Update for the Third Quarter of Fiscal 2014 
 
LONDON, UNITED KINGDOM--(Marketwired - Feb. 11, 2014) - African Copper Plc (AIM:ACU)(BOTSWANA:AFRICAN COPPER) 
("African Copper" or the "Company"), the AIM and Botswana listed copper production and exploration company, 
announces a production and exploration update for the third quarter of its financial year to 31 March 2014 
("Fiscal 2014"). 
 
Summary 
 
/T/ 
 
=-  For the third quarter of Fiscal 2014, the Company produced 2,499 metric 
    tonnes ("Mt") of copper in concentrate, a marginal decrease on the same 
    period last year but a substantial increase on Q2 this year. 
=-  Following a planned 10 day shutdown in November, ore processed and 
    copper production increased significantly in December. 
=-  Geotechnical test work initiated to the north of the Mowana open pit, 
    the results of which will be incorporated into studies for a proposed 
    Mowana underground mine. 
=-  January 2014 production of copper in concentrate maintained at the 
    December 2013 level of 1,124 Mt, but with lower ore processed due to 
    higher grades and recovery as higher grade sulphide ore from the 
    adjacent Thakadu pit became available. 
 
/T/ 
 
Mr Jordan Soko, Acting Chief Executive of African Copper, said: "Work during the November shutdown was 
completed successfully, on time and on budget. With the mill and processing plant now working efficiently and 
with higher grade ore available, our production operations are well positioned for the remainder of our 
financial year. " 
 
For further information please visit www.africancopper.com. 
 
Notes to Editors: 
 
African Copper is an AIM and Botswana listed copper producer and exploration company, currently focused on 
Botswana. The Company's flagship project is the copper producing open pit Mowana Mine. African Copper also owns 
the rights to the adjacent Thakadu-Makala deposit. Both deposits are situated on the highly prospective 
Matsitama belt, located close to Botswana's second largest city, Francistown, in the north-eastern part of the 
country. 
 
PRODUCTION 
 
Production levels for the three months ended 31 December 2013 and for the month of January 2014 are set out 
below: 
 
/T/ 
 
=--------------------------------------------------------------------------- 
Description           Oct.   Nov.   Dec. Total Q3  Total Q3  Total Q2   Jan. 
                      2013   2013   2013    2013/     2012/     2013/   2014 
                                             2014      2013      2014 
=--------------------------------------------------------------------------- 
Ore processed       60,706 67,620 83,920  212,246   215,383   192,041 60,624 
 (Mt) 
=--------------------------------------------------------------------------- 
Cu grade (%)          1.36   1.21   1.48     1.36      1.71      1.60   2.02 
=--------------------------------------------------------------------------- 
Recovery (%)          76.3   91.0   90.5     86.6      69.8      60.4   91.8 
=--------------------------------------------------------------------------- 
Concentrate          2,957  2,945  4,502   10,404    11,829     9,209  4,227 
 produced (Mt) 
=--------------------------------------------------------------------------- 
Copper produced        632    743  1,124    2,499     2,577     1,862  1,124 
 in concentrate 
 (Mt) 
=--------------------------------------------------------------------------- 
 
/T/ 
 
Copper produced in concentrates for the third quarter 2013/2014 FY decreased marginally by 3% and volume 
processed by 2%, compared to the same period last year. 
 
During the three months to end December 2013, sulphide ore from the Thakadu pit constituted 99% of the total 
volume processed, with aggregate recoveries approaching 87%. Shortages of high grade sulphide ore from the 
Thakadu pit impacted October and November production levels primarily due to poor performance of the mining 
contractor in stripping sufficient hangingwall waste to expose sulphide ore for mining. 
 
Plant throughput was affected during November due to a planned 10 day shutdown to replace the mill girth gear 
and mill pinion, and to reinforce the pinion sole plate. The work was completed successfully within the planned 
shutdown period and the mill is now running efficiently. As a result milling throughput increased markedly from 
67,619 metric tonnes in November to 83,920 metric tonnes in December; and was also reflected by copper produced 
in concentrate increasing from 743 tonnes in November to 1,125 tonnes in December. 
 
Heavy rains experienced in late January 2014 over the ore transport route from Thakadu to Mowana negatively 
impacted January production levels. The rains led to flooding of the Lepashe River and impeded trucking 
operations for several days. 
 
GEOLOGY/ EXPLORATION 
 
Outcrop mapping was carried out over the high gravity anomaly south west of the Nakalakwana IOCG target, 
together with soil sampling, and updates made to the geological and alteration maps for this area. 
 
A thorough review of all geological data in the Phute area was completed and possible targets for future RC 
drilling identified. 
 
A ground magnetic survey was completed around the Thakadu pit to help in determining geological structure and 
reasons for termination of copper mineralisation east of the pit. 
 
NEAR MINE EXPLORATION 
 
Logging of the five geotechnical boreholes north of the current Mowana open pit was completed and samples for 
geotechnical test work selected. The test work results will be incorporated in studies for the proposed Mowana 
underground mine. 
 
The technical information in this announcement has been reviewed and approved by David De'Ath, BSc (Hons), MSc, 
GDE-Mining, MIMM and MAusIMM, the Company's Manager, Geology, of the Mowana Mine for the purposes of the 
current Guidance Note for Mining, Oil and Gas Companies issued by the London Stock Exchange in June 2009. 
 
This announcement contains forward-looking information. All statements, other than statements of historical 
fact, that address activities, events or developments that the Company believes, expects or anticipates will or 
may occur in the future including, without limitation, statements regarding the supply of sulphide ore from 
Thakadu and increasing throughput to raise production levels further towards the plant's capacity s are forward- 
looking information. This forward-looking information reflects the current expectations or beliefs of the 
Company based on information currently available to the Company. Forward-looking information is subject to a 
number of risks and uncertainties that may cause the actual results of the Company to differ materially from 
those discussed in the forward-looking information, and even if such actual results are realized or 
substantially realized, there can be no assurance that they will have the expected consequences to, or effects 
on the Company. Factors that could cause actual results or events to differ materially from current 
expectations include, among other things, risks related to failure to convert estimated mineral resources to 
reserves, conclusions of economic evaluations, changes in project parameters as plans continue to be refined, 
the possibility that actual circumstances will differ from the estimates and assumptions used in the current 
Thakadu mining plan, future prices of copper, unexpected increases in capital or operating costs, possible 
variations in mineral resources, grade or recovery rates, failure of equipment or processes to operate as 
anticipated, accidents, labour disputes and other risks of the mining industry and political risks arising from 
operating in Africa and changes in regulations affecting the Company. All forward-looking information speaks 
only as of the date hereof and, except as may be required by applicable securities laws, the Company disclaims 
any intent or obligation to update any forward-looking information, whether as a result of new information, 
future events or results or otherwise. Although the Company believes that its expectations reflected in the 
forward-looking information, as well as the assumptions inherent therein, are reasonable, forward-looking 
information is not a guarantee of future performance and, accordingly, undue reliance should not be put on such 
information due to the inherent uncertainty therein. 
 
FOR FURTHER INFORMATION PLEASE CONTACT: 
 
African Copper Plc 
Brad Kipp 
Chief Financial Officer 
+1 (416) 847 4866 
bradk@africancopper.com 
 
OR 
 
Tavistock Communications (PR and IR) 
Simon Hudson/Nuala Gallagher 
+44 (0) 20 7920 3150 
 
OR 
 
Canaccord Genuity Limited (NOMAD and Broker) 
Neil Elliot/Tarica Mpinga 
+44 (0) 20 7523 8000 
 
INDUSTRY:  Manufacturing and Production-Mining and Metals 
SUBJECT:   MEX 
 
 
African Copper PLC 
 

1 Year African Copper Chart

1 Year African Copper Chart

1 Month African Copper Chart

1 Month African Copper Chart