![](/cdn/assets/images/search/clock.png)
We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Upland Resources Limited | LSE:UPL | London | Ordinary Share | JE00BJXN4P16 | ORD NPV |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
-0.15 | -5.08% | 2.80 | 2.90 | 3.10 | 3.05 | 2.50 | 2.95 | 4,287,436 | 16:35:29 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
Crude Petroleum & Natural Gs | 0 | -2.17M | -0.0016 | -18.75 | 39.14M |
Date | Subject | Author | Discuss |
---|---|---|---|
01/8/2023 16:29 | Share price back to what is was a week ago. | henrymcivor1 | |
01/8/2023 16:28 | Ignore the noise. Wait for the news. | henrymcivor1 | |
01/8/2023 16:26 | Complete destruction from 2pSame pumpers on twitter now have run away | ![]() roberth176 | |
01/8/2023 16:25 | Pumpers swapping yoIog | ![]() roberth176 | |
01/8/2023 16:25 | Pumper gone | ![]() roberth176 | |
01/8/2023 16:25 | Anihilation | ![]() roberth176 | |
01/8/2023 16:00 | In a stock market statement, the company said its technical team is conducting rig evaluations during a visit to a site in Australia against specific requirements and well design specifications. The hope is that the rig will be confirmed as suitable to advance the project timeline and, in the words of Upland chair Bolhassan Di, “maximize the potential of this global scale asset in the most time efficient manner”. Bolhassan Di noted that the company anticipates updating the market on further progress “throughout the month of August”. Upland told investors its focus is turning to commercial arrangements and formalising partnerships towards a drilling campaign and it does not envisage raising capital by issuing new equity to fund wells, as it said “the company is well financed to meet its operational commitments into 2024”. | henrymcivor1 | |
01/8/2023 15:58 | #UPL . . . . "We are in the final stages of signing an MOU with a large O&G engineering service company. Additionally, we are now evaluating potential PSC partners & drilling services companies to develop block SK334 in Sarawak." | henrymcivor1 | |
01/8/2023 15:58 | #UPL - Big Oil Ventures has met with the Petroleum Authority of Brunei Darussalam, the central authority regulating the Brunei Darussalam oil & gas industry & with Brunei Energy Services & Trading to discuss collaboration on Block SK334 in Sarawak. .. | henrymcivor1 | |
01/8/2023 15:57 | .. First risk estimates for exploration potential assessed & internally classified as medium-low. .. Potential for Hydrocarbon bearing reservoir at several stratigraphic levels .. Data maps 3 closed structures at multiple horizons | henrymcivor1 | |
01/8/2023 15:57 | Some of the geological features present on Block SK334 #UPL ..Dome shaped 4 way dip closures, with presence of potential reservoir sands ..Adjacent to discoveries that share the same working petroleum system & OWC levels ..Surface level Oil & Gas shows & seeps | henrymcivor1 | |
01/8/2023 15:54 | So much placing stock wRrants to dump | ![]() roberth176 | |
01/8/2023 15:51 | UPL down. ROQ up. Interesting rotation. | ![]() shortcpx | |
01/8/2023 15:49 | The main objectives of the joint technical study under the Agreement are to de-risk the petroleum system elements and to upgrade the understanding on the prospectivity in Block SK334, especially to: Assess hydrocarbon potential of Block SK334; delineate prospective areas, and identify leads and prospects in the Study Area Recommend and design new seismic acquisition requirements and/or identify any other feasible exploration tools for future de-risking activities. | henrymcivor1 | |
01/8/2023 15:46 | . . . . . . hxxps://upland.energ | henrymcivor1 | |
01/8/2023 15:46 | Forward Plan: • Continuation of prospects/leads resource assessment works. • Continuation of conceptual field development plan. • Technical Workstation Review with PETROS is planned in Mid June 2023, in preparation of the upcoming Technical Workshop with PETROS. The Technical Workshop will discuss and deliberate results of seismic reprocessing and reconditioning, prospect/lead maps, FTG remodeling integration works, and resources assessment methodology. | henrymcivor1 | |
01/8/2023 15:46 | Progress to Date / Milestone Achieved: • Geological Study: Fieldwork report finalized. Near completion of deterministic and probabilistic HC resource assessment. • Geophysical Study: Seismic reprocessing and reconditioning works completed. Ongoing results evaluation. • FTG Study: Completed FTG remodeling final report. Completed integration works between FTG model, seismic interpretation, fieldwork lab result and regional geology. • Conceptual Engineering: Commencement of notional field development plan. HC evacuation plan identification currently ongoing | henrymcivor1 | |
01/8/2023 15:45 | Progressing assessment of onshore rig for Block SK334 in Sarawak Technical team conducting rig evaluations against specific requirements & well design specifications Progress in Block SK334 work programme, including completed seismic reprocessing & reconditioning | henrymcivor1 | |
01/8/2023 15:30 | Several for the filter list here. | ![]() soulsauce | |
01/8/2023 15:29 | 18% down and dropping fast | ![]() roberth176 | |
01/8/2023 15:29 | Skodaman to rhe rescue | ![]() roberth176 |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions