![](/cdn/assets/images/search/clock.png)
We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
Casino Guichard Perrachon | AQEU:COP | Aquis Europe | Ordinary Share |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
-0.1095 | -3.01% | 3.5305 | 3.4985 | 3.568 | 3.5775 | 3.44 | 3.5775 | 1,865 | 16:28:29 |
The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.
Most recently, repairs are on-going at Valero's St. Charles refinery in Norco, La. A fire on June 9 shut the crude unit, the vacuum unit and a coker unit; the outages weren't expected to be lengthy at that time. The company said there is no restart estimate yet.
Also, a FCCU at Valero's Port Arthur, Texas, refinery was back at normal operating rates Monday following a malfunction on Friday.
Total Petrochemicals USA (TOT) Monday began the process of restarting a key gasoline-making unit at its Port Arthur, Texas, refinery. The unit was shuttered owing to a main air blower malfunction; the filing to state regulators did not say when the shutdown occurred.
Alon USA's (ALJ) Big Spring, Texas refinery experienced a power interruption Saturday that resulted in emissions from multiple process units. The filing to state regulators said adjustments to processes and equipment were made to maintain operation and minimize emissions; the impact on production is not clear.
BP (BP) Sunday warned of planned flaring due to on-going routine maintenance at its Carson, California, refinery. The work is not affecting production at the plant, sources familiar with operations said.
Exxon Mobil Corp. (XOM) on July 10 reported to environmental regulators that it would begin shutting down a boiler at fluid catalytic cracking unit No. 3 for planned work at the Baytown, Texas refinery. Emissions associated with the shutdown were expected to continue until July 12. The shutdown "should have no impact on supplies and all customer needs should be met," the company said in the filing.
On July 8, Exxon said that a snag caused flaring from its fluid catalytic cracking unit No. 2 at the Baytown, Texas refinery. That event had no impact on production and all customer needs were met," according to a separate filing to state regulators.
Valero Energy Corp. (VLO) has begun a plant-wide shutdown at its Aruba refinery for economic reasons, the company said on July 9; the process is expected to conclude by the end of the week a company spokesman said. The economic situation will be re-evaluated in two to three months when Valero might restart the plant.
Valero on July 7 said that the crude and fluid catalytic cracking units at its Ardmore, Okla. refinery still aren't producing any product following a Saturday night power outage and fire. The fire was put out, but the hydrotreater is still shut down, a company spokesman said.
Exxon started work on a hydrogen unit as part of a sulfur recovery unit Tuesday at its Torrance, Calif. refinery, the company said. The work has already caused flaring and should last for a weeks, according to a company spokeswoman.
Marathon Corp.'s (MRO) St. Paul, Minn., refinery experienced a power blip Friday, the company said Monday. Shortly after the outage, the refinery resumed normal operations, company spokesman Robert Calmus said.
Last week, a California judge halted the expansion at Chevron Corp.'s (CVX) Richmond, Calif., refinery. The court ordered Chevron to halt any project-related activity until the city of Richmond has had a chance to reconsider its approval of an environmental review of the project and ensure that the review meets state environmental regulations. The order issued last week gives Chevron 60 days to "demobilize" workers and equipment from the construction site.
For more detailed information, search Dow Jones Newswires using the code N/REF.
Operator Refinery Capacity Description Restart (in 000s bbl/day) UNPLANNED CANADA EAST COAST CARIBBEAN GULF COAST Delek Tyler, TX 58.0 SCOT unit shut June 9 July 14 for approximately four days of unplanned work. Bad weather upsets units June 29 Exxon Baytown, TX 567.0 FCCU #3 boiler shut for planned work July 10 FCCU #2 hits snag July 8 Total Port Arthur, 232.0 Unit 835, an FCCU, restarted Jul 14 Texas Jul 13 following a main air blower malfunction; it is unclear when the snag occurred. Valero Norco, LA 185.0 Crude, vacuum, coker units Jul 5 remain shuttered the co. said July 13. No restart timing. The units were shut on June 9 owing to a "minor" fire. Valero Port Arthur 250.0 FCCU at plannted rates, fol- Jul 13 TX a malfunction on July 10, the co. said on July 13 MIDWEST Marathon St. Paul 74.0 Power blip disrupts refinery July 3 MN briefly July 3. ROCKY MOUNTAINS Valero Ardmore 87.4 July 4 Fire puts crude, fccu n/a on circulation. Hydrotreater shut. WEST COAST Alon Paramount, 53.0 Naphtha hydrotreater Early CA shut April 23 due to an July explosion will take 10 weeks to restart, the co. said on May 7. The refinery has been at re- duced rates since Apr. 23. PetroStar Valdez, AK 48.0 Refinery shut due to Dec. Jun/Jul 28 fire; expected to re- 2010 start in June/July 2010. PLANNED CANADA CARIBBEAN Valero Aruba 235.0 The refinery is being shut Sep/Oct for economic reasons. All units to be down by end July 17. Restart will be re- evaluated in two to three months. EAST COAST Sunoco Philadelphia, 340.0 Reformer unit shut in Girard n/a PA Point section in early Oct. for economic reasons. Shutdown to last one to six months. GULF COAST Chevron Pascagoula, 330.0 Pre-commercial heavy oil 2010 Miss. conversion project delayed from 2008 to 2010 due to economic factors. Flint Corpus 288.1 West Plant Coking Unit in re- Hills Christi, TX start mode on June 3; unit shut June 1 for planned maintenance. $250 mil. project for new Spr diesel desulfurization, 2010 sulfur recovery unit to begin in Fall 2008. Construction to last 18 months. Marathon Garyville 245.0 Project to increase crude oil 4Q LA refining capacity by 180,000- 2009 b/d 85% complete, the Co. said on Apr. 30. New units expected start up in 4th-quarter, 2009. Motiva Port Arthur 285.0 Expansion project to increase 1st-Q TX throughput capacity by 325,000 2012 b/d, to 610,000-b/d, slowed. Completion now seen in 1st- quarter 2012, from 2010. Valero Corpus 340.0 Coker Unit shutdown for econo- n/a Christi, TX mic reasons and planned work; delayed to June 19 from June 12. The 20,000-b/d unit will remain off-line through July but could restart at any time if margins improve, the Co. said. 20,000-b/d FCCU in East n/a Plant shut; West Plant 50,000-b/d FCCU at reduced rates since mid-Dec. for economic reasons. Valero Norco, LA 250.0 Upgrade project to build 2012 a new diesel hydrotreater unit moved from 2010 to 4th-quarter 2012, the Co. said on Jan. 27. Valero Port Arthur 325.0 77,000-b/d FCCU at reduced n/a TX rates since mid-Dec. for economic reasons. Mainte- is planned at a hydrotreater unit, the company said on April 17; no details were given. Valero Norco, LA Turnaround at coker unit 1/Q delayed until the first 2010
quarter of 2010 from fourth quarter 2009, the Co. said on Apr. 28. Valero Sunray, TX 170.0 55,000-b/d FCCU at reduced n/a rates since mid-Dec. for economic reasons. Valero Three Rivers 95.0 24,000-b/d FCCU at reduced n/a TX rates since mid-Dec. for economic reasons. Plant-wide 24-day turnaround Sep to begin in Sept., the Co. said on Apr. 28. WRB Borger, TX 152.0 Gas Oil Hydrodesulfurization Jun unit will be restart some 6-14 time between June 6 and 14. It is unclear when then unit was taken out of service. Planned maintenance at Unit Jul 12 29 FCCU electrostatic precipi- tators starts May 31. Work will conclude on July 12. MID-WEST Frontier El Dorado 130.0 A coker turnaround and expan- Mid- KS sion project was delayed until Aug. Mid-July, and subsequently delayed until August. Valero Memphis, TN 195.0 FCCU upgrade originally slated 2012 for completion in 2009 has been shifted to 2012, the Co. said on Jan. 27. ROCKY MOUNTAINS Conoco Billings, 61.0 On Mar. 5 the Co. delayed for Jan. MT one year an expansion project 2010 which will increase capacity to 71,000 bbls. Construction of a new crude unit is now scheduled to begin in January 2010. Frontier Cheyenne 52.0 The refinery is operating at n/a WY reduced rates for economic reasons. WEST COAST Alon Paramount 55.0 Hydrocracker project post- CA poned indefinitely, the Co. said on Feb. 4 Chevron Richmond, 243.0 Hydrocracking Unit and re- Jun 27 CA former shut May 28 for 30- days planned maintenance. Judge halts construction on expansion project July 1. Exxon Torrance 155.0 Maintenance will begin in July July Mobil at one of two 26,000-b/d coker units, traders said on May 22. Work began July 7, on SRU Hydrogen Unit. Will last few weeks Flint North Pole 210.0 One of three processing n/a Hills AK units has been shut due to low jet fuel demand, the co. confirmed on Mar. 19. Shell Martinez 155.0 Crude Unit and Coker Unit Aug 15 CA to shut for planned main- tenance on July 10; re- start seen Aug. 15. Tesoro Wilmington, 97.0 39-days of turnaround main- CA tenance is planned for fourth-quarter 2009. Tesoro Wilmington, 97.0 39-days of turnaround main- CA tenance is planned for fourth-quarter 2009.
Order free Annual Report for BP plc
Visit http://djnewswires.ar.wilink.com/?link=BP or call 1-888-301-0513
Order free Annual Report for ConocoPhillips
Visit http://djnewswires.ar.wilink.com/?link=COP or call 1-888-301-0513
Order free Annual Report for Chevron Corporation
Visit http://djnewswires.ar.wilink.com/?link=CVX or call 1-888-301-0513
Order free Annual Report for Marathon Oil Corporation
Visit http://djnewswires.ar.wilink.com/?link=MRO or call 1-888-301-0513
Order free Annual Report for Exxon Mobil Corporation
Visit http://djnewswires.ar.wilink.com/?link=XOM or call 1-888-301-0513
Order free Annual Report for BP plc
Visit http://djnewswires.ar.wilink.com/?link=BP or call 1-888-301-0513
Order free Annual Report for ConocoPhillips
Visit http://djnewswires.ar.wilink.com/?link=COP or call 1-888-301-0513
Order free Annual Report for Chevron Corporation
Visit http://djnewswires.ar.wilink.com/?link=CVX or call 1-888-301-0513
Order free Annual Report for Marathon Oil Corporation
Visit http://djnewswires.ar.wilink.com/?link=MRO or call 1-888-301-0513
Order free Annual Report for Exxon Mobil Corporation
Visit http://djnewswires.ar.wilink.com/?link=XOM or call 1-888-301-0513
1 Year Casino Guichard Perrachon Chart |
1 Month Casino Guichard Perrachon Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions