The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.
Most recently, Pasadena Refining's crude unit at its Pasadena, Texas, refinery was back to normal operations Monday following a lightning strike Saturday that disabled power to an emergency generator.
Also, Citgo said Monday that the fire at the East Plant alkylation unit at its Corpus Christi, Texas, refinery was under control. The fire started early on Sunday and injured a worker who was airlifted to a San Antonio hospital. The alkylation unit remains shut.
And Valero (VLO) Monday reported a brief snag at the coker unit at its Benicia, California refinery. The event had no material impact on operations, the company said.
BP (BP) Monday restarted a Resid Hydro-Treating Unit at its Texas City, Texas refinery; the unit was shuttered by an explosion during the last week of July in 2005.
On Friday, a person familiar with operations at BP's Carson, Calif., refinery said the FCCU and associated units shut over the July 11-12 weekend would be restarted at the end of the month.
ConocoPhillips (COP) recently shut an FCCU at its Alliance refinery in Belle Chasse, La., for unplanned maintenance, a trade source said Wednesday. The work is expected to take seven to 10 days.
ConocoPhillips on Wednesday began the process of restarting a hydrotreating unit and a desulfurization unit at its Bayway Refinery in Linden, New Jersey. The units were shuttered on Tuesday due to a "minor" fire, a person familiar with operations at the plant said.
And repairs are ongoing at Valero Energy Corp.'s (VLO) St. Charles refinery in Norco, La., the company said on July 13. A fire on June 9 shut the crude unit, the vacuum unit and a coker unit; the outages weren't expected to be lengthy at that time. There is no restart estimate yet.
Valero on July 7 said that the crude and fluid catalytic cracking units at its Ardmore, Okla., refinery still aren't producing any product following a power outage and fire. The fire was put out, but the hydrotreater is still shut down, a company spokesman said.
For more detailed information, search Dow Jones Newswires using the code N/REF.
Operator Refinery Capacity Description Restart (in 000s bbl/day) UNPLANNED CANADA EAST COAST Conoco Linden, NJ 238.0 Officials consider run cuts n/a due to slack demand. Hydrotreater and Desulfur- Jul 15 ization unit in restart start on July 15; units shut by a minor fire on July 14. CARIBBEAN GULF COAST BP Texas City, 467.0 Resid Hydro-Treating Unit Jul 24 TX following four-year shutdown. The unit was shut by an explo- sion in July, 2005. Citgo Corpus 163.0 Alkylation Unit shut by fire n/a Christ, TX on July 19; a worker was in- jured during the event. Conoco Belle Chasse 247.0 FCCU shut unplanned on July Jul 12/13; repairs expected to 19-23 take 7 to 10 days. Pasadena Pasadena, TX 120.0 Crude unit back at normal rates Jul 20 rates after running in circula- tion mode since late July 18 owing to a lightning strike. Total Port Arthur, 232.0 Unit 835, an FCCU, restarted Jul 14 Texas Jul 13 following a main air blower malfunction; it is unclear when the snag occurred. Valero Norco, LA 185.0 Crude, vacuum, coker units n/a remain shuttered the co. said July 13. No restart timing. The units were shut on June 9 owing to a "minor" fire. Valero Port Arthur 250.0 FCCU at planted rates, fol- Jul 13 TX a malfunction on July 10, the co. said on July 13 MIDWEST ROCKY MOUNTAINS Valero Ardmore 87.4 July 4 Fire puts crude, FCCU n/a on circulation. Hydrotreater shut. WEST COAST Alon Paramount, 53.0 Naphtha hydrotreater Early CA shut April 23 due to an July explosion will take 10 weeks to restart, the co. said on May 7. The refinery has been at re- duced rates since Apr. 23. BP Carson, CA 265.0 FCCU recently shut for End- unplanned work, a person July familiar with operations said on July 14; no restart estimate. PetroStar Valdez, AK 48.0 Refinery shut due to Dec. Jun/Jul 28 fire; expected to re- 2010 start in June/July 2010. Valero Benicia, CA 170.0 Brief coker unit upset on n/a July 20 has no impact on production. PLANNED CANADA CARIBBEAN Valero Aruba 235.0 The refinery is being shut Sep/Oct for economic reasons. All units to be down by July 17. Restart will be re- evaluated in two to three months. EAST COAST Sunoco Philadelphia, 340.0 Reformer unit shut in Girard n/a PA Point section in early Oct. for economic reasons. Shutdown to last one to six months. GULF COAST Chevron Pascagoula, 330.0 Pre-commercial heavy oil 2010 Miss. conversion project delayed from 2008 to 2010 due to economic factors. Exxon Baytown, TX 567.0 FCCU No. 3 boiler shut n/a for planned work July 10; the work will have no impact on the company's ability to supply customers. Flint Corpus 288.1 $250 mln project for new Spr Hills Christi, TX diesel desulfurization, 2010 sulfur recovery unit to begin in Fall 2008. Construction to last 18 months. Marathon Garyville 245.0 Project to increase crude oil 4Q LA refining capacity by 180,000- 2009 b/d 85% complete, the co. said on Apr. 30. New units expected start up in 4th-quarter, 2009. Motiva Port Arthur 285.0 Expansion project to increase 1st-Q TX throughput capacity by 325,000 2012 b/d, to 610,000-b/d, slowed. Completion now seen in 1st- quarter 2012, from 2010. Valero Corpus 340.0 Coker Unit shutdown for econo- n/a Christi, TX mic reasons and planned work; delayed to June 19 from June 12. The 20,000-b/d unit will remain off-line through July but could restart at any time if margins improve, the Co. said. 20,000-b/d FCCU in East n/a Plant shut; West Plant 50,000-b/d FCCU at reduced rates since mid-Dec. for economic reasons. Valero Norco, LA 250.0 Upgrade project to build 2012 a new diesel hydrotreater unit moved from 2010 to 4th-quarter 2012, the Co. said on Jan. 27. Valero Port Arthur 325.0 77,000-b/d FCCU at reduced n/a TX rates since mid-Dec. for economic reasons. Mainte- is planned at a hydrotreater unit, the company said on April 17; no details were given. Valero Norco, LA Turnaround at coker unit 1/Q delayed until the first 2010 quarter of 2010 from fourth
quarter 2009, the Co. said on Apr. 28. Valero Sunray, TX 170.0 55,000-b/d FCCU at reduced n/a rates since mid-Dec. for economic reasons. Valero Three Rivers 95.0 24,000-b/d FCCU at reduced n/a TX rates since mid-Dec. for economic reasons. Plant-wide 24-day turnaround Sep to begin in Sept., the Co. said on Apr. 28. WRB Borger, TX 152.0 Planned maintenance at Unit Jul 12 29 FCCU electrostatic precipi- tators starts May 31. Work will conclude on July 12. MID-WEST Frontier El Dorado 130.0 A coker turnaround and expan- Mid- KS sion project was delayed until Aug. Mid-July, and subsequently delayed until August. Valero Memphis, TN 195.0 FCCU upgrade originally slated 2012 for completion in 2009 has been shifted to 2012, the Co. said on Jan. 27. ROCKY MOUNTAINS Conoco Billings, 61.0 On Mar. 5 the Co. delayed for Jan. MT one year an expansion project 2010 which will increase capacity to 71,000 bbls. Construction of a new crude unit is now scheduled to begin in January 2010. Frontier Cheyenne 52.0 The refinery is operating at n/a WY reduced rates for economic reasons. WEST COAST Alon Paramount 55.0 Hydrocracker project post- CA poned indefinitely, the Co. said on Feb. 4 Chevron Richmond, 243.0 Hydrocracking Unit and re- Jun 27 CA former shut May 28 for 30- days planned maintenance. Judge halts construction on expansion project July 1. Exxon Torrance 155.0 Maintenance will begin in July July Mobil at one of two 26,000-b/d coker units, traders said on May 22. Work began July 7, on SRU Hydrogen Unit. Will last few weeks Flint North Pole 210.0 One of three processing n/a Hills AK units has been shut due to low jet fuel demand, the co. confirmed on Mar. 19. Shell Martinez 155.0 Crude Unit and Coker Unit Aug 15 CA to shut for planned main- tenance on July 10; re- start seen Aug. 15. Tesoro Wilmington, 97.0 39-days of turnaround main- CA tenance is planned for fourth-quarter 2009. Tesoro Wilmington, 97.0 39-days of turnaround main- CA tenance is planned for fourth-quarter 2009.
Order free Annual Report for BP plc
Visit http://djnewswires.ar.wilink.com/?link=BP or call 1-888-301-0513
Order free Annual Report for ConocoPhillips
Visit http://djnewswires.ar.wilink.com/?link=COP or call 1-888-301-0513
Order free Annual Report for Chevron Corporation
Visit http://djnewswires.ar.wilink.com/?link=CVX or call 1-888-301-0513
Order free Annual Report for Marathon Oil Corporation
Visit http://djnewswires.ar.wilink.com/?link=MRO or call 1-888-301-0513
Order free Annual Report for Exxon Mobil Corporation
Visit http://djnewswires.ar.wilink.com/?link=XOM or call 1-888-301-0513
Order free Annual Report for BP plc
Visit http://djnewswires.ar.wilink.com/?link=BP or call 1-888-301-0513
Order free Annual Report for ConocoPhillips
Visit http://djnewswires.ar.wilink.com/?link=COP or call 1-888-301-0513
Order free Annual Report for Chevron Corporation
Visit http://djnewswires.ar.wilink.com/?link=CVX or call 1-888-301-0513
Order free Annual Report for Marathon Oil Corporation
Visit http://djnewswires.ar.wilink.com/?link=MRO or call 1-888-301-0513
Order free Annual Report for Exxon Mobil Corporation
Visit http://djnewswires.ar.wilink.com/?link=XOM or call 1-888-301-0513
1 Year Casino Guichard Perrachon Chart |
1 Month Casino Guichard Perrachon Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions