We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Shanta Gold Limited | LSE:SHG | London | Ordinary Share | GB00B0CGR828 | ORD 0.01P |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 14.75 | 14.70 | 14.80 | 14.75 | 14.70 | 14.70 | 403,229 | 08:00:03 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
Gold Ores | 114.06M | -2.3M | -0.0022 | -67.05 | 155.09M |
TIDMSHG
RNS Number : 4513L
Shanta Gold Limited
03 October 2016
3 October 2016
Shanta Gold Limited
("Shanta Gold", "Shanta" or the "Company")
High grade intercepts at Singida
Shanta Gold (AIM: SHG), the East Africa-focused gold producer, developer and explorer, is pleased to announce high grade intercepts at its Singida project ("Singida") located in northern central Tanzania.
Singida is an advanced stage project with a mining licence in place and is expected to become an important contributor to Shanta's growth. As previously announced, Shanta is conducting a new exploration programme concurrent with a pilot plant project which will improve the Company's understanding of Singida's high grade orebody in advance of a full scale development plan. The pilot project is making progress and has been rescheduled to start in Q2 2017 targeting the Gold Tree 1 ore body while the Company prioritises expanding the resource through further exploration.
In 2009, a resource estimate at Singida identified 432,000oz of Measured Resources at a grade of 4.1g/t Au, 118,000oz of Indicated Resources at 2.0g/t Au and 309,000oz of Inferred Resources at 2.3g/t Au. The majority of the Measured Resources relate to a shear structure at the Gold Tree 1 ore body ("GT1"), one of nine identified ore bodies and begins at surface.
During historic definition drilling at GT1, several of the deeper holes intersected mineralisation high in the hanging wall. A very small proportion of the overall Indicated and Inferred resource was ascribed to these structures, Gold Tree 2 and Gold Tree 3 ("GT2" and "GT3") but they remained underexplored.
A recent exploration programme, completed in September by Shanta, was carried out to increase the drill density in the hanging wall shears. Thirty nine holes, for 4,204m were drilled and confirmed mineralisation along 400m of strike and down to a vertical depth of approximately 100m. High grade intersections indicate some potential pay-shoots within the plane of the shears GT2 and GT3 within zones of weaker mineralisation. The drill results will be incorporated into the resource model.
Drilling highlights:
-- 1m @ 7.72g/t from 68m-69m in SC653 -- 3m @ 9.94g/t from 59m-62m in SC657 -- 1m @ 12.45g/t from 65m-66m in SC662 -- 6m @ 3.81g/t from 52m-58m in SC665 -- 3m @ 5.66g/t from 105m-108m in SC668 -- 5m @ 6.91g/t from 69m-74m in SC676 -- 3m @ 4.44g/t from 100m-103m in SC677 -- 12m @ 9.24g/t from 130m-142m in SC679
The upper, shallow portion of the Measured Resource at GT1 is now the focus of the pilot plant project. Future work will include water supply hole drilling, then close-spaced grade control holes covering the "pit footprint" of the pilot mining slot, as well as further resource drilling on GT1, GT2 and GT3. Shanta is also planning IP surveys to track a Volcanogenic Semi Massive Sulphide horizon that is believed to be a preferred locality for brittle-ductile deformation and mineralisation.
Toby Bradbury, Chief Executive Officer, commented:
"With New Luika's expanding resource generating strong free cash flow, we have refocused on Shanta's original flagship project at Singida. The recent Singida drill results increase our confidence that, subject to an updated Feasibility Study, Shanta will be able to significantly increase its production of low cost ounces at an extremely competitive capital cost.
The results from this latest drilling campaign further reinforce the value that our exploration emphasis is creating and the exciting prospectivity of Shanta's portfolio both at Singida and in the Lupa Goldfield.
The portion of the GT2 and GT3 mineralisation that is near-surface may hold stripping ratio benefits when establishing an open pit for the Gold Tree 1 ore body. The drilling programme also highlights the potential to access multiple mineralised structures from underground infrastructure designed to exploit the Gold Tree 1 ore body with associated cost benefits.
Further exploration will continue to target resource drilling on the other known ore bodies that make up the Singida project. Meanwhile, we look forward to updating the market on progress at the pilot project in due course. Studies on the high grade, low tonnage, low capex pilot plant continue to look attractive and serve to demonstrate the Company's continued commitment to the development of the Singida Project."
Table 1: Intersection Summary - Singida Gold Tree 2 & Gold Tree 3 RC Drilling
BHID From To Intersection Width Au_Ave Notes ------- SC652 34 39 5 2.07 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC652 69 71 2 1.31 ----- ---- ------------------- ------- ------------------------ SC653 60 63 3 2.27 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC653 68 69 1 7.72 ----- ---- ------------------- ------- ------------------------ SC655 3 7 4 2.03 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC655 11 12 1 1.10 ----- ---- ------------------- ------- ------------------------ SC657 35 37 2 1.04 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC657 59 62 3 9.94 Including 1m @ 24.76g/t ----- ---- ------------------- ------- ------------------------ SC658 0 1 1 2.05 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC658 22 23 1 2.50 ----- ---- ------------------- ------- ------------------------ SC659 74 77 3 1.07 ----- ---- ------------------- ------- ------------------------ SC660 136 137 1 10.30 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC660 141 142 1 1.05 ----- ---- ------------------- ------- ------------------------ SC662 65 66 1 12.45 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC662 69 82 13 2.51 Including 2m @ 9.53g/t ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC662 96 97 1 5.81 ----- ---- ------------------- ------- ------------------------ SC664 66 67 1 2.07 SC665 3 7 4 3.55 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC665 42 43 1 3.44 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC665 52 58 6 3.81 Including 1m @ 11.53g/t ----- ---- ------------------- ------- ------------------------ SC666 79 86 7 3.31 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC666 135 139 4 2.93 ----- ---- ------------------- ------- ------------------------ SC667 41 43 2 1.45 ----- ---- ------------------- ------- ------------------------ SC668 48 51 3 0.95 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC668 105 108 3 5.66 Including 1m @ 14.45g/t ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC668 111 112 1 1.28 ----- ---- ------------------- ------- ------------------------ SC669 3 6 3 2.78 ----- ---- ------------------- ------- ------------------------ SC671 34 35 1 2.77 ----- ---- ------------------- ------- ------------------------ SC672 47 48 1 3.46 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC672 108 113 5 1.75 ----- ---- ------------------- ------- ------------------------ SC673 31 32 1 1.44 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC673 54 55 1 5.83 ----- ---- ------------------- ------- ------------------------ And
----- ---- ------------------- ------- ------------------------ SC673 61 62 1 1.31 ----- ---- ------------------- ------- ------------------------ SC674 8 12 4 1.51 ----- ---- ------------------- ------- ------------------------ SC675 91 92 1 1.80 ----- ---- ------------------- ------- ------------------------ SC676 0 1 1 2.39 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC676 69 74 5 6.91 Including 2m @ 11.2g/t ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC676 113 114 1 4.63 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC676 158 159 1 2.00 ----- ---- ------------------- ------- ------------------------ SC677 100 103 3 4.44 Including 1m @ 11.5g/t ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC677 106 107 1 1.39 ----- ---- ------------------- ------- ------------------------ SC678 33 34 1 1.51 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC678 126 129 3 1.23 ----- ---- ------------------- ------- ------------------------ SC679 130 142 12 9.24 Including 8m @ 12.35g/t ----- ---- ------------------- ------- ------------------------ SC680 19 21 2 1.12 ----- ---- ------------------- ------- ------------------------ SC681 12 16 4 1.93 ----- ---- ------------------- ------- ------------------------ SC682 26 27 1 2.91 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC682 76 77 1 2.29 ----- ---- ------------------- ------- ------------------------ SC686 49 52 3 1.12 ----- ---- ------------------- ------- ------------------------ SC687 21 22 1 1.01 ----- ---- ------------------- ------- ------------------------ And ----- ---- ------------------- ------- ------------------------ SC687 33 34 1 7.10 ----- ---- ------------------- ------- ------------------------ SC688 78 79 1 3.03 ----- ---- ------------------- ------- ------------------------ SC690 117 121 4 2.76 ----- ---- ------------------- ------- ------------------------ 1. Down hole intersection widths quoted, not true widths. Holes drilled at -50(o) and -60(o) 2. See links for accompanying plan and section view of the drilling programme
http://www.rns-pdf.londonstockexchange.com/rns/4513L_-2016-10-2.pdf
http://www.rns-pdf.londonstockexchange.com/rns/4513L_1-2016-10-2.pdf
http://www.rns-pdf.londonstockexchange.com/rns/4513L_2-2016-10-2.pdf
3. Compositing guidelines: Internal waste excluded >1m @ <0.5g/t, External waste excluded >1m @ <0.5g/t
This announcement is inside information for the purposes of Article 7 of Regulation 596/2014.
Enquiries:
Shanta Gold Limited Toby Bradbury (CEO) Mark Rosslee (CFO) +255 (0)22 2601 829 Nominated Adviser and Broker Peel Hunt LLP Matthew Armitt / Ross Allister / Chris Burrows +44 (0)20 7418 8900 Financial Public Relations Tavistock Emily Fenton / Jos Simson / Barney Hayward +44 (0)20 7920 3150
About Shanta Gold
Shanta Gold is an East Africa-focused gold producer, developer and explorer. It currently has defined ore resources on the New Luika and Singida projects in Tanzania and holds exploration licences over a number of additional properties in the country. Shanta's flagship New Luika Gold Mine commenced production in 2012 and produced 81,873 ounces in 2015. The Company is admitted to trading on London's AIM and has approximately 583 million shares in issue. For further information please visit: www.shantagold.com.
Competent Person
The technical information contained within this announcement has been reviewed and approved by Mr. Awie Pretorius MSc.Pri.Sci.Nat. Mr. Pretorius is a consultant to Shanta and a member of the South African Council for Natural Scientific Professionals (SACNASP Membership Number 400060/91).
He has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' and for the purposes of the AIM Guidance Note on Mining and Oil & Gas Companies dated June 2009.
This information is provided by RNS
The company news service from the London Stock Exchange
END
DRLUUVKRNSARRAA
(END) Dow Jones Newswires
October 03, 2016 02:00 ET (06:00 GMT)
1 Year Shanta Gold Chart |
1 Month Shanta Gold Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions