ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

ALTN Altyngold Plc

144.00
-1.00 (-0.69%)
Last Updated: 14:05:55
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Altyngold Plc LSE:ALTN London Ordinary Share GB00BMH19X50 ORD 10P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  -1.00 -0.69% 144.00 140.00 144.00 148.00 143.00 143.00 28,870 14:05:55
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Gold Ores 62.04M 13.23M 0.4841 3.06 39.63M

Drilling Report

19/01/2012 7:00am

UK Regulatory


Altyngold (LSE:ALTN)
Historical Stock Chart


From Jul 2019 to Jul 2024

Click Here for more Altyngold Charts.
 
TIDMHMB 
 
 

Hambledon Mining plc

 

("Hambledon" or "Company")

 

Latest drilling results from Sekisovskoye underground project, Kazakhstan

 

19 January 2012

 

Hambledon Mining Plc (AIM: HMB), the Kazakhstan gold mining and development company, continues to advance its underground drill programme to validate and expand the geological resources at Sekisovskoye and today reports the results of a further four drill holes.

 

The results from the programme during December 2011 following a period of six weeks of planned maintenance of the drill rigs are as follows:

 
 
    -- A cumulative total of sixty seven holes drilled to date over 9,000 

metres

 
    -- The main intersections since the last update include: 

Hole D65 - 9m at 4.86g/t Au,

Hole D66 - 2m at 3.5g/t Au,

Hole D67 - 4m at 2.62g/t Au,

 

To date, sixty seven drill holes have been completed in the upper levels of the underground ore zones and the results are consistent and in many areas exceed the geological and mineral resource modeling previously carried out.

 

The assays were carried out in the Altai Ken-Bayitu laboratory with independent verification to be undertaken by the Alex Stewart Group in Karabalta, Kyrgyzstan.

 

The Sekisovskoye deposit comprises approximately ten large mineralised zones intermingled with numerous narrow and sinuous mineralisation zones. The zones of mineralisation show wide variation in thickness from 0.35 metres to 30 metres, with a weighted average of 5.5 metres. The zones display a localised pinch and swell structure, with variable gold and silver content. The large average width makes for easier and lower cost mining.

 

The ore body to be mined in 2012 is ore body number 11 where mining started in Q4, 2011. The drill results and mined grade [including dilution] compare favorably and provide robust confirmation of the geological model.

 

Good progress has been in made in expanding the underground mining zones with three levels being mined at present and a fourth due to commence in early February, 2012. The ground conditions have to date been good and water inflow within the excavation zones minimal, providing confidence that the bulk mining methods to be employed later will be technically feasible.

 

A significant programme of geological and rock mass characterisation will take place concurrently to ensure that the mining operation advances in tandem with sound engineering knowledge guiding the development of the project. A team of UK geologists will be visiting the mine site in mid-2012 for three months to carry out additional and specific structural mapping to add to the rock characterization studies supervised by Golder Associates, UK.

 

Qualified Person

 

Information in this report relating to the exploration results is based on data reviewed by Timothy Daffern, BEng, MBA, FIMMM, FAusIMM, MCIM, Chartered Mining Engineer, Chief Executive Officer of Hambledon Mining plc. Timothy Daffern has in excess of 23 years' experience in mineral project development and evaluation including exploration and is a Qualified Person under the AIM Rules.

 

ENQUIRIES:HAMBLEDON MINING: Telephone +44 (0)207 233 1462Charles Zorab

 

FAIRFAX I.S. PLC (NOMAD AND JOINT BROKER): Telephone +44 (0)207 598 5368Ewan Leggat/Katy Birkin

 

TAVISTOCK COMMUNICATIONS: Telephone +44 (0)207 920 3150Ed Portman/Jos Simson

 
?    HOLE    COORDINATES                              DEPTH                    GOLD MINERALIZATION_ore intervals 
             X         Y         Z        AZI    DIP  drilled  core    total   FROM  TO    LENGTH  AA-AKB LAB, AU, g/t 
64   EXP-26  7188.197  6779.016  344      265    -17  30       30      30      15    16    1       4.86 
65   EXP-27  7188.57   6778.965  344      209    -10  50       50      50      12    13    1       1.80 
                                                                               13    14    1       5.66 
                                                                               14    15    1       9.68 
                                                                               16    17    1       2.86 
                                                                               17    18    1       9.26 
                                                                               18    19    1       8.56 
                                                                               19    20    1       1.40 
                                                                               20    21    1       0.92 
                                                                               21    22    1       1.44 
                                                                               22    23    1       3.96 
                                                                               23    24    1       1.42 
66   EXP-28  7188.247  6778.751  345      239    17   33       33      33      22    23    1       4.02 
                                                                               23    24    1       3.08 
67   EXP-29  7188.732  6778.196  344.491  234.6  -14  25       25      25      15.3  16    0.7     1.00 
                                                                               16    17    1       3.50 
                                                                               17    18    1       2.04 
                                                                               18    19    1       1.96 
                                                                               19    20    1       2.96 
                                                                               20    21.2  1.2     0.94 
                                                                               21.2  22    0.8     1.30 
     Total:                                           9641.8   9641.8  9641.8 
 
 
 
 
 
 

1 Year Altyngold Chart

1 Year Altyngold Chart

1 Month Altyngold Chart

1 Month Altyngold Chart