ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

ATM Atacama Pacific Gold Corporation

0.00
0.00 (0.00%)
Share Name Share Symbol Market Type
Atacama Pacific Gold Corporation TSXV:ATM TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0 -

Atacama Pacific Intersects 414 Metres Grading 0.67 g/t Gold Including 92 Metres Grading 1.24 g/t Gold at Cerro Maricunga

16/07/2012 12:45pm

Marketwired Canada


Atacama Pacific Gold Corporation (TSX VENTURE:ATM) ("Atacama Pacific") is
pleased to report that all assay results have been received from the recently
completed 45,995-metre Phase III drill program on its 100%-owned Cerro Maricunga
oxide gold project and work is progressing on an updated resource estimate. The
Cerro Maricunga project is located 140 kilometres by road northeast of Copiapo
in Chile's prolific Maricunga Mineral Belt. Highlights from the final set of
drill results, which are summarized in Table 1, include:




--  124 metres ("m") grading 1.26 grams per tonne gold ("g/t Au") from the
    Crux Zone (CMR-188) 
    --   including 42 m at 2.52 g/t Au 
        
--  256 m grading 0.60 g/t Au and 98 m with 0.80 g/t Au from the Phoenix
    Zone (CMD-187) 
    --  including 46 m at 1.20 g/t Au 
        
--  414 m grading 0.67 g/t Au from the Lynx Zone (CMR-209) 
    --  including 92 m at 1.24 g/t Au 
        
--  376 m grading 0.44 g/t Au from the recently discovered Lower East Zone
    (CMR-155B) 
    --  including 22 m at 1.00 g/t Au 



With the Phase III infill drilling program completed, the Crux, Phoenix and Lynx
zones have been drilled on fifty metre sections further defining the continuity
of the oxide mineralization throughout the three zones. As highlighted above,
continuous intervals of gold mineralization, with higher grade cores, were
returned from each of the three main oxide gold zones and from the recently
discovered Lower East Zone. 


Eleven drill holes have cut the Lower East Zone to date outlining a corridor of
0.3 to 0.5 g/t oxide gold mineralization, as highlight by the results from
CMR-155B above, over a width of 200 metres and a strike length of 400 metres.
CMR-155B, a 178-metre extension of CMR-155, finished at a depth of 428 metres.
The Lower East Zone remains open to the northwest and may transition into the
northern contact of the Crux Zone to the southeast. See attached drill plan. 


"With all drill results in hand, an updated resource estimate for the Cerro
Maricunga oxide gold deposit is on schedule for release during the current
quarter," said Carl Hansen, President and CEO of Atacama Pacific. "It is
anticipated that the new resource estimate will include mineralization from the
Lower East Zone, which represents a high priority target for the upcoming Phase
IV drill program slated for Q4. The updated resource model will form the basis
of the preliminary economic assessment which is scheduled for a late 2012
release." 


Water Exploration Update 

Atacama Pacific has completed 134 kilometres of time domain electromagnetic
("TEM") geophysics within the boundaries of it AMX water property located 95
kilometres north of the Cerro Maricunga property. The TEM geophysical survey
identified a number of potential aquifers which will be the focus on a water
drilling campaign in the fourth quarter 2012. 


Santa Rosa Property Acquired 

Atacama Pacific recently staked the Santa Rosa property, located two kilometres
to the south of its Cerro Maricunga property. The 1,800 hectare property
encompasses a large volcanic complex in a geological setting similar to that
which hosts the Cerro Maricunga deposit. 


Share Capital Update 

As at March 31, 2012, Atacama Pacific had unexercised warrants of 744,316 at a
price of US$0.90 and 2,127,500 at a price of $1.25. All warrants were exercised
by the expiry date of June 30, 2012 giving Atacama Pacific a total cash position
of $28.5 million. Presently, Atacama Pacific's share capital comprises
50,937,411 outstanding shares and 4,772,000 options, at a weighted average
exercise price of $4.63, for a fully diluted outstanding balance of 55,709,411
shares. 


About Atacama Pacific Gold Corporation 

Atacama Pacific's primary mineral property is the Cerro Maricunga
oxide-associated, breccia-hosted gold project which hosts, as of August 2011, a
resource, at a 0.3 g/t Au cut-off grade, of 1.62 million ounces of gold (92.8
million tonnes grading 0.54 g/t Au) in the indicated category with a further
1.95 million ounces (116.7 million tonnes grading 0.52 g/t Au) in the inferred
category. Atacama Pacific's goal is to become a producer of gold through the
exploration and development of the Cerro Maricunga Gold Project. Atacama Pacific
also owns six other mineral properties within close proximity to the Cerro
Maricunga Project and a fifth property in Chile's Region I. 


National Instrument 43-101 Compliance 

The Cerro Maricunga resource estimate was prepared under Canadian Institute of
Mining, Metallurgy and Petroleum Definition Standards (2005). Michael Easdon is
the independent qualified person, as defined by National Instrument 43-101 ("NI
43-101"), for the resource estimate. SRK Consulting (Chile) S.A. undertook to
prepare and is responsible for the resource estimate. Joled Nur, Geostatistical
Engineer for SRK Consulting (Chile) and a member of the Australasian Institute
of Mining and Metallurgy, is the qualified person who prepared the resource
estimate. For further details on the resource estimate as well as quality
control and quality assurance procedures, please review Atacama Pacific's August
24, 2011 press release or review the NI 43-101 compliant Technical Report dated
October 7, 2011 filed at www.sedar.com. Mr. Easdon, an independent qualified
person as defined by NI 43-101, has reviewed and verified the contents of this
press release.




Table 1 - Summary of Cerro Maricunga Drill Assay Results (Intervals greater 
 than 10 metres)                                                            
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Hole #   Section    From       To Interval    Grade      Zone          Notes
                (metres) (metres) (metres) (g/t Au)                         
----------------------------------------------------------------------------
----------------------------------------------------------------------------
CMR-132     2450     130      142       12     0.48      Lynx               
----------------------------------------------------------------------------
CMR-139     2550      96      120       24     0.30      Lynx   at a 0.2 g/t
                                                                  Au cut-off
----------------------------------------------------------------------------
CMD-141     1300     236      352      116     0.48   Phoenix   at a 0.2 g/t
                                                                  Au cut-off
----------------------------------------------------------------------------
including            254      328       74     0.62                         
----------------------------------------------------------------------------
CMR-142     2450     148      164       16     0.40      Lynx               
----------------------------------------------------------------------------
                     192      222       30     0.73                         
----------------------------------------------------------------------------
                     278      290       12     0.42                         
----------------------------------------------------------------------------
                     310      346       36     0.55                         
----------------------------------------------------------------------------
CMD-144     1350    No significant assay results      Phoenix               
----------------------------------------------------------------------------
CMD-154     1150     274      320       46     0.49   Phoenix               
----------------------------------------------------------------------------
CMR-155B    1000      28      404      376     0.44   L. East   at a 0.2 g/t
                                                                  Au cut-off
----------------------------------------------------------------------------
including            116      170       54     0.63                    178 m
                                                                extension of
                                                                     CMR-155
----------------------------------------------------------------------------
      and            236      258       22     1.00                         
----------------------------------------------------------------------------
CMR-162     1300      50       76       26     0.26   Phoenix   at a 0.2 g/t
                                                                  Au cut-off
----------------------------------------------------------------------------
CMD-165     1100      14       38       24     0.37                         
----------------------------------------------------------------------------
                     156      208       52     0.54                         
----------------------------------------------------------------------------
CMD-167     1650     262      282       20     0.82   Phoenix  lost at 282 m
                                                               with 1.42 g/t
                                                                          Au
----------------------------------------------------------------------------
CMR-168      650     150      210       60     0.28      Crux               
----------------------------------------------------------------------------
including            170      190       20     0.42                         
----------------------------------------------------------------------------
CMR-172     1200     264      280       16     0.42   Phoenix       numerous
                                                                intervals at
                                                                 0.2 g/t cut
                                                                         off
----------------------------------------------------------------------------
CMR-177     1250    No significant assay results      Phoenix               
----------------------------------------------------------------------------
CMD-178     1450       0       46       46     0.42   Phoenix   twin of CMD-
                                                                         184
----------------------------------------------------------------------------
                      82      102       20     0.67                         
----------------------------------------------------------------------------
CMD-182     2150      74      234      160     0.32      Lynx               
----------------------------------------------------------------------------
including             76       90       14     0.35                         
----------------------------------------------------------------------------
      and            212      234       22     0.50                         
----------------------------------------------------------------------------
CMD-184     1450       0       44       44     0.42   Phoenix   twin of CMD-
                                                                         178
----------------------------------------------------------------------------
                      76      130       54     0.78                         
----------------------------------------------------------------------------
including            114      122        8     1.81                         
----------------------------------------------------------------------------
CMD-187     1450       0      256      256     0.60   Phoenix               
----------------------------------------------------------------------------
including             30       54       24     1.03                         
----------------------------------------------------------------------------
      and            230      252       22     1.12                         
----------------------------------------------------------------------------
                     336      434       98     0.80                         
----------------------------------------------------------------------------
including            346      392       46     1.20                         
----------------------------------------------------------------------------
CMR-188      350       0      124      124     1.26      Crux               
----------------------------------------------------------------------------
                      16       58       42     2.52                         
----------------------------------------------------------------------------
CMD-191     2050      60       88       28     0.29      Lynx               
----------------------------------------------------------------------------
CMD-198     2200       0       56       56     1.08      Lynx   at a 0.2 g/t
                                                                 Au cut-off;
                                                              twin of CMR-89
----------------------------------------------------------------------------
including             30       50       20     2.24                         
----------------------------------------------------------------------------
                      68       80       12     0.55           ending in 0.30
                                                               g/t Au @ 80 m
----------------------------------------------------------------------------
CMR-199     1500      72      106       34     0.57   Phoenix               
----------------------------------------------------------------------------
CMD-200      900      74      172       98     0.34      Crux   at a 0.2 g/t
                                                                  Au cut-off
----------------------------------------------------------------------------
including            142      170       28     0.56                         
----------------------------------------------------------------------------
CMD-201     1150    No significant assay results      Phoenix               
----------------------------------------------------------------------------
CMR-203      550     174      190       16     0.44      Crux               
----------------------------------------------------------------------------
                     250      270       20     0.45                         
----------------------------------------------------------------------------
CMR-204     1050      40      102       62     0.58   L. East               
----------------------------------------------------------------------------
                     282      304       22     0.38                         
----------------------------------------------------------------------------
                     320      352       32     0.34                         
----------------------------------------------------------------------------
CMR-206     1000      48      130       82     0.43   L. East               
----------------------------------------------------------------------------
CMR-208     1750      90      112       22     0.37   Phoenix               
----------------------------------------------------------------------------
                     284      426      142     0.55                         
----------------------------------------------------------------------------
CMR-209     2300      36      450      414     0.67      Lynx   at a 0.2 g/t
                                                                 Au cut-off;
                                                                ends in +0.3
                                                                        g/t 
                                                              mineralization
-------------------------------------------------------------               
                     250      342       92     1.24                         
----------------------------------------------------------------------------
CMR-211     1850     120      136       16     0.41   Phoenix               
----------------------------------------------------------------------------
                     344      378       34     0.25             at a 0.2 g/t
                                                                  Au cut-off
----------------------------------------------------------------------------
CMR-212     2250      70      152       82     0.70      Lynx   at a 0.2 g/t
                                                                  Au cut-off
----------------------------------------------------------------------------
                      70      118       48     0.98                         
----------------------------------------------------------------------------
CMR-219     1000      72      208      136     0.35   L. East   at a 0.2 g/t
                                                                  Au cut-off
----------------------------------------------------------------------------
including             88      176       88     0.40                         
----------------------------------------------------------------------------
CMR-220      950      78      120       42     0.46   L. East               
----------------------------------------------------------------------------
NOTES: Unless otherwise noted, reported gold grades are composited at a 0.3 
 g/t Au cut-off. All intervals represent down-hole lengths and not true     
 widths. Drill holes prefixed "CMD" are diamond drill holes; holes prefixed 
 "CMR" are RC drill holes.                                                  



FORWARD LOOKING STATEMENTS 

This release contains forward-looking statements, including predictions,
projections and forecasts. Forward-looking statements include, but are not
limited to, statements with respect to completion of economic assessments,
exploration results, the success of exploration activities generally, mine
development prospects, and future gold production. Often, but not always,
forward-looking statements can be identified by the use of words such as
"plans", "planning", "expects" or "does not expect", "continues", "scheduled",
"estimates", "forecasts", "intends", "potential", "anticipates", "does not
anticipate", or "belief", or describes a "goal", or variation of such words and
phrases or state that certain actions, events or results "may", "could",
"would", "might" or "will" be taken, occur or be achieved. 


Forward-looking statements involve known and unknown risks, future events,
conditions, uncertainties and other factors which may cause the actual results,
performance or achievements to be materially different from any future results,
prediction, projection, forecast, performance or achievements expressed or
implied by the forward-looking statements. Such factors include, among others,
the results of due diligence activities, the interpretation and actual results
of current exploration activities; changes in project parameters as plans
continue to be refined; future prices of gold; possible variations in grade or
recovery rates; failure of equipment or processes to operate as anticipated;
labour disputes and other risks of the mining industry; delays in obtaining
governmental approvals or financing or in the completion of exploration, as well
as those factors disclosed in Atacama Pacific's publicly filed documents.
Although Atacama Pacific has attempted to identify important factors that could
cause actual actions, events or results to differ materially from those
described in forward-looking statements, there may be other factors that cause
actions, events or results not to be as anticipated, estimated or intended.
There can be no assurance that forward-looking statements will prove to be
accurate, as actual results and future events could differ materially from those
anticipated in such statements. Accordingly, readers should not place undue
reliance on forward-looking statements.


To view the Cerro Maricunga Gold Project Drill Plan, please visit the following
link: http://media3.marketwire.com/docs/ATMF1.pdf.


1 Year Atacama Pacific Gold Corporation Chart

1 Year Atacama Pacific Gold Corporation Chart

1 Month Atacama Pacific Gold Corporation Chart

1 Month Atacama Pacific Gold Corporation Chart