ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

KEFI Kefi Gold And Copper Plc

0.71
0.03 (4.41%)
10 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Kefi Gold And Copper Plc LSE:KEFI London Ordinary Share GB00BD8GP619 ORD 0.1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.03 4.41% 0.71 0.712 0.736 0.732 0.67 0.70 96,643,985 16:35:21
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Metal Mining Services 0 -6.36M -0.0013 -5.46 35.25M

KEFI Minerals plc PROGRESS AT JIBAL QUTMAN, SAUDI ARABIA (1576B)

05/10/2015 7:00am

UK Regulatory


Kefi Gold And Copper (LSE:KEFI)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Kefi Gold And Copper Charts.

TIDMKEFI

RNS Number : 1576B

KEFI Minerals plc

05 October 2015

5 October 2015

KEFI Minerals plc

("KEFI" or the "Company")

PROGRESS AT JIBAL QUTMAN, Saudi Arabia

discovery of additional areas of gold mineralisation

AND PREPARATIONS OF mINING LICENCE APPLICATION

KEFI Minerals (AIM: KEFI), the gold exploration and development company with projects in the Kingdom of Saudi Arabia and the Federal Democratic Republic of Ethiopia, is pleased to provide an update on progress at the Jibal Qutman Project in Saudi Arabia. Jibal Qutman is being progressed towards a low-capex development of a conventional open-pit, heap-leach (HL) oxide gold operation following the start-up of Tulu Kapi Gold Project in Ethiopia.

Highlights

Jibal Qutman - Preparation of Technical Studies for Mining Licence Application:

-- Approximately 75% of the infill drilling program (RC and diamond drilling) totalling 5,415m has been completed. The aim of the program is to upgrade Inferred Resources to Indicated Resources for the oxide gold mineralisation in-pit or proximal to preliminary open-pit designs.

-- Metallurgical testing (column leach) has been completed on the oxide mineralisation from four potential open cut areas for HL processing. Gold recoveries range from 70% to 75% with a weighted average of 73%. These gold recoveries are slightly better than earlier bottle roll test work with an average estimated recovery of 69%.

-- A mine scoping study on a HL operation was completed by AMC Consultants. Based on resources defined as at March 2015, the potential mineable resources in a series of shallow open pits totalled 6.6Mt at 0.95g/t Au, for 201,600oz.

-- The AMC study supported the internal preliminary assessment announced by KEFI on 6 May 2015. A HL recovery factor of 70% was utilised during the optimisation and evaluation process.

-- Ongoing drilling at Jibal Qutman is identifying additional areas of gold mineralisation, especially at the prospects known as 4K Hill, 3K Hill, Pyrite Hill, Main, West and South Zones.

   --    The primary focus of  exploration drilling will shortly transfer from Jibal Qutman to Hawiah 

Hawiah - large gold and base metal target

-- Drilling at Hawiah will target a 6km-long gold-mineralised gossan and the underlying copper-gold-zinc massive sulfide target as identified by recent geophysical surveys.

Jeff Rayner, Exploration Director of KEFI Minerals, commented:

"We are pleased to report that the oxide heap leach project at Jibal Qutman continues to deliver positive results and is progressing towards applying for regulatory permits for a low-capex development.

Exploration drilling continues to expand and provide new discoveries whilst technical studies are being assembled for lodgement of the Mining Licence Application. We look forward to reporting further progress in due course."

ENQUIRIES

 
 KEFI Minerals plc 
 Harry Anagnostaras-Adams (Executive 
  Chairman)                             +357 99457843 
 
 SP Angel Corporate Finance 
  LLP (Nominated Adviser) 
 Ewan Leggat, Jeff Keating              +44 20 3470 0470 
 
 Brandon Hill Capital Ltd (Joint 
  Broker) 
 Oliver Stansfield, Alex Walker, 
  Jonathan Evans                        +44 20 7936 5200 
 
 Beaufort Securities Ltd (Joint 
  Broker) 
 Elliot Hance                           +44 20 7382 8300 
 
 Luther Pendragon Ltd (Financial 
  PR) 
 Harry Chathli, Claire Norbury, 
  Oliver Hibberd                        +44 20 7618 9100 
 

Further information can be viewed on KEFI's website at www.kefi-minerals.com

COMPETENT PERSONS' STATEMENTS

References in this announcement to exploration results, resources, interpretations and prospects have been approved for release by Mr. Jeffrey Rayner. Mr Rayner is a geologist and has more than 27 years' relevant experience in the field of activity concerned. He is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM) and has reviewed and consented to the inclusion of the material in the form and context in which it appears.

BACKGROUND

Exploration Progress

Exploration drilling and trenching has continued at Jibal Qutman during the summer months. RC drilling has focused on extensions to gold mineralisation at the 4K Hill prospect and at the Red Hill prospect.

Best results include 43m at 1.50 g/t Au, 14m at 2.51 g/t Au, 11m at 1.36 g/t Au and 16m at 1.02 g/t Au.

The following table summarizes the best assay results from the exploration drilling, which comprised 32 inclined RC drill holes totaling 2,300m.

Table 1 - Exploration Drilling Results

 
   Hole      Northing     Easting     From   To    Interval        Au       Zone 
                                        m     m        m           g/t 
 JQRC397    334682.68    2252923.08    47    63       16      @   1.02    Red Hill 
                                                                        ------------ 
                                       81    92       11      @   1.36 
---------  -----------  -----------  -----  ----  ---------      -----  ------------ 
 JQRC398    336987.89    2249199.47    55    61       6       @   2.14    Red Hill 
                                                                        ------------ 
                                       77    93       16      @   1.02 
---------  -----------  -----------  -----  ----  ---------      -----  ------------ 
 JQRC400    336164.17    2247482.04    96    106      10      @   1.02      South 
---------  -----------  -----------  -----  ----  ---------      -----  ------------ 
 JQRC403                               1     18       17      @   0.95     4K Hill 
                                                                        ------------ 
                                       93    97       4       @   1.08 
                                                                        ------------ 
                                      116    120      4       @   1.15 
---------  -----------  -----------  -----  ----  ---------      -----  ------------ 
 JQRC405    335724.15    2253799.72    6     14       8       @   1.17   Pyrite Hill 
---------  -----------  -----------  -----  ----  ---------      -----  ------------ 
 JQRC411    336963.90    2249904.53    9     18       9       @   1.23    RH North 
---------  -----------  -----------  -----  ----  ---------      -----  ------------ 
 JQRC415    336980.49    2249250.25    90    96       6       @   1.52    Red Hill 
---------  -----------  -----------  -----  ----  ---------      -----  ------------ 
 JQRC416    336855.27    2248798.37    90    93       3       @   1.39    Red Hill 
---------  -----------  -----------  -----  ----  ---------      -----  ------------ 
 JQRC428    335417.91    2254330.55    12    16       4       @   1.43     4K Hill 
                                                                        ------------ 
                                       38    42       4       @   1.20 
---------  -----------  -----------  -----  ----  ---------      -----  ------------ 
 JQRC429    335103.94    2254547.79    25    28       3       @   1.12     4K Hill 
                                                                        ------------ 
                                       45    48       3       @   1.07 
---------  -----------  -----------         ----  ---------      -----  ------------ 
 JQRC431    335818.577   2250095.18    31    34       3       @   1.09    Main Zone 
---------  -----------  -----------  -----  ----  ---------      -----  ------------ 
 JQRC433    336945.61    2249271.06    27    70       43      @   1.50    Red Hill 
---------  -----------  -----------  -----  ----  ---------      -----  ------------ 
 JQRC434    336929.32    2249299.40    31    37       6       @   1.59    Red Hill 
---------  -----------  -----------  -----  ----  ---------      -----  ------------ 
 JQRC435    336951.29    2249297.71    24    28       4       @   1.11    Red Hill 
                                                                        ------------ 
                                       32    37       5       @   1.15 
                                                                        ------------ 
                                       56    70       14      @   1.60 
---------  -----------  -----------  -----  ----  ---------      -----  ------------ 
 JQRC440    336847.88    2247931.19    18    32       14      @   2.51    RH South 
                                                                        ------------ 
                                       35    36       1       @   2.86 
                                                                        ------------ 
                                       39    41       2       @   1.24 
---------  -----------  -----------  -----  ----  ---------      -----  ------------ 
 JQRC442    336840.30    2247886.50    87    89       2       @   2.27    RH South 
---------  -----------  -----------  -----  ----  ---------      -----  ------------ 
 

All drillholes designed at an azimuth of 270deg, inclined at -60deg. True width is estimated at 65-70% of downhole width in each area.

Detailed outcrop mapping and sampling continues over the entire EL, with encouraging assay results from rock-chip samples. Samples JQR556 and JQRC588, containing visible gold, returned respectively grades of 283g/t Au and 89.2g/t Au. These samples were taken from a 30m long outcropping trend of quartz veins and carbonate alteration. This area is located 3km along strike to the north of the Red Hill prospect. Further activity, including channel sampling, is underway with aim to identify the host and extent of this high-grade mineralisation.

(MORE TO FOLLOW) Dow Jones Newswires

October 05, 2015 02:00 ET (06:00 GMT)

A new area of mineralisation, Jabal Mikhyat, was discovered in the northwest sector of the licence. The prospect consists of at least three main target zones, associated with ancient workings. Gold mineralisation is related with a lamprophyre dyke swarm, trending northwest-southeast, associated with rare quartz veining, strong silicification and pyrite impregnation of the host rock. A preliminary trenching campaign comprising 25 trenches returned the following assay results:

Table 2 - Trench Sampling Results Jabal Mikhyat

 
   Trench     Interval        Au 
                  m           g/t 
             ---------      ------ 
   JQT345        3       @   2.25 
-----------  ---------      ------ 
   JQT347        2       @   4.31 
-----------  ---------      ------ 
   JQT343        18      @   2.49 
 including       2       @   7.17 
-----------  ---------      ------ 
   JQT353        2       @   1.05 
-----------  ---------      ------ 
   JQT354        4       @   3.47 
-----------  ---------      ------ 
   JQT355        2       @   1.94 
-----------  ---------      ------ 
   JQT356        1       @   28.40 
-----------  ---------      ------ 
   JQT364        5       @   7.73 
 including       2       @   18.46 
-----------  ---------      ------ 
 

Following these promising trench results at the Jabal Mikhyat prospect, a reconnaissance program comprising four RC drill holes has been completed and results received. All holes intersected the alteration/mineralisation zones at expected depths. However drill hole interpretation of the mineralised intervals shows more complexity than previously thought: more geological investigations are required to properly plan further drilling.

Infill drilling program underway

A infill program on 25m centres commenced in late June 2015 at Jibal Qutman. It comprises of 5,415m of RC drilling across 4K Hill, 3K Hill, Main, West and SC zones. The aims of the program are to upgrade current Inferred Resources to the Indicated category and to add additional oxide material through the drilling of zones proximal to the current designed pits.

About 75% of the program has been completed to date with no delays, and the program is expected to be completed by mid-October.

The current drilling at 4K Hill, 3K Hill and West Zone has shown mineralisation and alteration in-line with expectations adding confidence to the current model. A list of best intervals is reported below:

Table 3 - Infill RC Drilling Results

 
    Hole       Northing     Easting     From   To   Interval        Au       Zone 
                                          m     m       m           g/t 
  JQRC465     335201.19    2254323.64    35    39      4       @   1.57     4K Hill 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC466     335258.82    2254323.53    68    71      3       @   8.14     4K Hill 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC470     335425.26    2254259.86    46    47      1       @   3.53     4K Hill 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC473     335132.85    2254224.55    22    26      4       @   1.50     4K Hill 
                                                                          ---------- 
                                         31    35      4       @   1.04 
                                                                          ---------- 
                                         51    53      2       @   1.29 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC476     335149.07    2254183.89    24    33      9       @   1.60     4K Hill 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC477     335198.62    2254177.73    36    42      6       @   1.33     4K Hill 
  JQRC478     335299.301   2254175.11    66    69      3       @   1.16     4K Hill 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC485     334769.32    2252754.46    32    40      8       @   2.99     3K Hill 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC486     334723.45    2252712.70    0     5       5       @   1.65     3K Hill 
                                         12    16      4       @   1.51     3K Hill 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC489     334647.54    2253137.89    27    30      3       @   2.23     3K Hill 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC491     334674.34    2252897.19    0     4       4       @   1.44     3K Hill 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC495     335453.04    2249784.49    26    28      2       @   2.91    West Zone 
                                                                          ---------- 
                                         26    33      7       @   1.05 
                                                                          ---------- 
                                         46    51      5       @   6.02 
                                         77    92      15      @   1.06 
 including                               79    81      2       @   4.87 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC496     335574.04    2249758.71    27    32      5       @   1.12    West Zone 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC497     335530.30    2249759.71    7     11      4       @   1.51    West Zone 
                                                                          ---------- 
                                         73    79      6       @   2.60 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC498     335492.32    2249758.89    40    42      2       @   1.86    West Zone 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC499     335416.71    2249683.78    49    52      3       @   3.17    West Zone 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC500     335602.92    2249664.20    47    50      3       @   1.09    West Zone 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC502     335432.16    2249628.27    32    36      4       @   2.41    West Zone 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC503     335446.32    2249575.46    27    31      4       @   31.12   West Zone 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC504     335503.44    2249538.42    33    34      2       @   1.39    West Zone 
                                                                          ---------- 
                                         54    55      3       @   1.38 
                                                                          ---------- 
                                         66    67      6       @   3.16 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC505     335581.76    2249503.79    28    29      1       @   1.15    West Zone 
                                                                          ---------- 
                                         44    45      2       @   1.08 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC506     335544.54    2249549.04    16    17      4       @   2.37    West Zone 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
  JQRC507     335576.79    2249603.80    45    46      12      @   1.12    West Zone 
-----------  -----------  -----------  -----  ---  ---------      ------  ---------- 
 

All drillholes designed at an azimuth of 270deg, inclined at -60deg. True width is estimated at 65-70% of downhole width in each area. Coordinates, UTM, WGS84, 38N.

NOTES TO EDITOR

KEFI Minerals plc

KEFI is the operator of two advanced gold development projects within the highly prospective Arabian-Nubian Shield, with an attributable 1.93Moz (100% of Tulu Kapi's 1.72Moz and 40% of Jibal Qutman's 0.73Moz) gold Mineral Resources (JORC 2012) plus significant resource growth potential. KEFI targets that production at these projects generate cash flows for further exploration and expansion as warranted, recoupment of development costs and, when appropriate, dividends to shareholders.

Expected milestones for the remainder of 2015 at Tulu Kapi include:

   --     Formalisation of project contracting, senior secured financing and equity funding 
   --     Full development funding and commencement of construction 

In addition, during 2015 KEFI anticipates that through its joint venture company in Saudi Arabia, Gold & Minerals Ltd ("G&M"), it will commence drilling at new licence Hawiah and assemble a Mining Licence Application for its discovery at Jibal Qutman in Saudi Arabia.

KEFI Minerals in Ethiopia

The Tulu Kapi gold project in Western Ethiopia is being rapidly progressed towards development with the Mining Licence being granted in April 2015.

KEFI's Definitive Feasibility Study was then completed and the Company is now refining contractual terms for project construction and operation. Latest estimates for annual gold production are c. 100,000 oz pa for a 10-year period and for All-in Sustaining Costs (including operating, sustaining capital and closure) of c. US$760/oz (excluding initial investment). Tulu Kapi's Ore Reserve estimate totals 15.4Mt at 2.12g/t gold, containing 1.05 million ounces.

KEFI Minerals in the Kingdom of Saudi Arabia

(MORE TO FOLLOW) Dow Jones Newswires

October 05, 2015 02:00 ET (06:00 GMT)

1 Year Kefi Gold And Copper Chart

1 Year Kefi Gold And Copper Chart

1 Month Kefi Gold And Copper Chart

1 Month Kefi Gold And Copper Chart