ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

LMI Lonmin Plc

75.60
0.00 (0.00%)
Last Updated: 01:00:00
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Lonmin Plc LSE:LMI London Ordinary Share GB00BYSRJ698 ORD USD0.0001
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 75.60 73.70 74.00 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Lonmin PLC Q1 2013 Production Report & IMS (Amendment) (8098W)

31/01/2013 11:55am

UK Regulatory


Lonmin (LSE:LMI)
Historical Stock Chart


From Jun 2019 to Jun 2024

Click Here for more Lonmin Charts.

TIDMLMI

RNS Number : 8098W

Lonmin PLC

31 January 2013

REGULATORY RELEASE

31 January 2013

Q1 2013 Production Report & Interim Management Statement (Amendment)

The following announcement is made to amend the numbers given at the beginning of the second paragraph of the original announcement which was released at 7am today to make them consistent with the table.

Lonmin Plc ("Lonmin" or the "Company"), the world's third largest Platinum producer, today announces its production results for the quarter to 31 December 2012 (unaudited) and Interim Management Statement for the period from 1 October 2012 to today's date.

Overview

Our production performance in the quarter has substantially exceeded our planned ramp up to produce Platinum in concentrate of 185,497 saleable ounces and Platinum sales of 108,342 saleable ounces. This demonstrates the successful execution of the operational plans we put in place for the safe re-start and ramping up of production following the labour unrest that preceded the period. The protocols developed for our safe sustainable start up have not only been commended by regulatory authorities as being best practice but have been adopted and rolled out by our peers. Total tonnes mined were 2.9 million tonnes, similar to the prior year period.

In addition our exemplary safety performance throughout the production ramp up delivered an improved Lost Time Injury Frequency Rate (LTIFR) for the quarter of 3.74 incidents per million man hours worked compared to 4.16 for Q4 2012 and 4.67 for Q1 2012. The Process Division had a LTI free first quarter for the first time in five years.

Mining Division

Total tonnes mined in the first quarter of the 2013 financial year from our Marikana underground operations were 2.7 million tonnes, down 26,000 tonnes or 1.0% from the prior year period. This is a relatively flat performance when compared to Q1 2012, as this performance masks two trends. Firstly the prior year period results were unusually impacted by the high incidence of Section 54 safety reviews and stoppages which dominated the South African Mining sector as a whole and resulted in lower than normal production in that period. The total impact of Section 54 shutdowns in Q1 2012 was 177,000 tonnes, compared to 19,000 tonnes in Q1 2013. Secondly the Q1 2013 production reflects the re-commencement and gradual ramping up of production during the quarter. The quarter's performance is commendable with tonnes mined well ahead of the ramp up plan and overall mining divisions' output up 78.2% from Q4 2012. This solid performance is due to the emphasis we have placed on safely accelerating our ramp up following the resumption of operational activities coupled with the extensive training we conducted before blasting commenced on 1 October 2012. In addition, management interventions have assisted in ensuring high levels of employee work attendance during the quarter up to the December break.

Looking specifically at how our four mining divisions contributed to the quarter's total production, tonnes mined at Karee were largely flat increasing by only 2,000 tonnes or 0.1% from the prior year period, with tonnes mined at K3, our biggest shaft, relatively flat when compared to the prior year period. The prior year period also included 18,000 tonnes from K4, which was placed on care and maintenance in September 2012. Westerns production decreased by 42,000 tonnes or 5.5% driven by the planned depletion of ore reserves at Newman shaft and ore reserve and infrastructure challenges at Rowland. Production at Middelkraal was up 66,000 tonnes representing a 14% increase from the prior year period as both Hossy and Saffy continued to increase production. Production at Easterns fell by 53,000 tonnes or 19.4% as E1 and E3 approached their end of life. Pandora underground production increased by 7,000 tonnes or 13.5% to 61,000 tonnes and is ramping up to replace the tonnes lost by the winding down of E1 and E3.

Our opencast Merensky operations delivered a total of 155,000 tonnes, an increase of 37,000 tonnes or 31.3% from the prior year period as planned.

Process Division

Total tonnes milled for the quarter declined by 4.6% to 2.8 million tonnes when compared to Q1 2012. This was due to the concentrators re-starting as planned, ten days after the mining ramp up commenced on 1 October 2012. This was to rebuild stocks as required for efficient plant running and the planned closure of the Number One shaft UG2 concentrator for upgrade. The UG2 concentrator is due to come back online in the fourth quarter of FY 2013.

Underground milled head grade during the period increased by 3.1% to 4.64 grammes per tonne (5PGE + Au) compared to the prior year period, as a result of an increase in hoisting grade and ore mix. The opencast milled head grade was marginally lower than Q4 2012 grade and lower than prior year period at 2.98 grammes per tonne. Overall, total milled head grade increased by 2.6% to 4.59 grammes per tonne in the period.

Underground and overall concentrator recoveries improved by 1.5 percentage points to 86.8% when compared with the prior year period, assisted by the successful commissioning of the Eastern Tails Treatment Plant in April 2012.

Platinum in concentrate from our Marikana operations was 174,253 saleable ounces, a 2.2% decrease from the prior year period and an increase of 71,431 ounces when compared to Q4 2012. In total the concentrators produced 185,497 saleable ounces of Platinum in the quarter, a 0.7% decrease from the prior year period. Total refined production for the quarter was 135,455 ounces of saleable Platinum an increase of 18.9% on the prior year period. The discrepancy between metal in concentrate and refined production is a consequence of the planned restocking of the pipeline following the six week strike and the re-establishment of stable metal flows through the value chain. We have successfully filled the pipeline and our stocks are in a healthy position.

Sales & Pricing

Platinum sales at 108,342 ounces were 16.7% higher than the prior year period, total PGM sales decreased by 3.7% to 182,576 ounces.

The US dollar basket price at $1,176 per ounce improved by 3.5% on the prior year period whilst the increase in the Rand basket price was more pronounced up 10.3% to R10,152 per ounce.

Renewal Plan

Cost management programmes

The implementation of our renewal plan has progressed well; the over performance on many of the metrics is encouraging, and in the absence of any unexpected material labour unrest, it is expected to continue as suggested by the healthy stock levels reflected in our production report. The assessment of our operating model and management structure is progressing as planned whilst our initiative to deliver a R100 million in procurement savings for FY 13 by implementing structures, processes and systems to fully benefit from a Total Cost of Ownership approach is also progressing well.

Employee relationship

Our union membership profile has evolved over the last few months whilst the recognition agreements with our union stakeholders have also expired. In light of this, we have commenced the process of reviewing the recognition arrangements with a view to establishing all inclusive recognition that provides appropriate representation to all the unions and associations representing our employees.

In parallel, Lonmin is actively participating in industry discussions on the establishment of a forum for centralised engagement and looks forward to this becoming a reality.

Social licence - housing, community and employee care

The Board separately today, will announce initiatives around housing, the communities we operate in and our employees.

Financial stability

The Rights Issue announced on 9 November 2012 to raise approximately $817 million was successfully completed on 11 December 2012. Since then, Lonmin has repaid in full its $700 million USD bank debt facilities, cancelling the $300 million term loan facility leaving the $400 million revolving credit facility available to be drawn when required. The amendments to this facility as well as Lonmin's ZAR bank debt facilities of R1.98 billion outlined at the time of the Rights Issue both became effective in December 2012. The successful conclusion of this balance sheet refinancing has significantly strengthened Lonmin's financial position and gives it greater financial flexibility, with sufficient available liquidity and more appropriate financial covenants.

Board and Management Update

On 28 December 2012, we announced the resignation of Ian Farmer as Chief Executive of the Company. The Board has appointed an executive search agency to pursue the selection and engagement of his successor and this search is currently underway. We announced on 23 January 2013 that Cyril Ramaphosa would not be standing for re-election as a Non-Executive Director of Lonmin at the AGM today.

Outlook

Our operations delivered a strong performance in the quarter ahead to exceed our planned ramp up targets. Encouragingly, the second quarter is proceeding well with the momentum of the first quarter having already been re-established. We remain focused on embedding the safety protocols that have underpinned the successful start up reflected in our solid production results. At this early stage of the year, guidance for the full year is maintained at 680,000 Platinum ounces of saleable metals in concentrate and sales of 660,000 ounces of Platinum. We maintain our capital expenditure guidance for the year of around $175 million and unit cost guidance of around R9,350 per PGM ounce produced absent any material safety or industrial relations stoppages.

- ENDS -

ENQUIRIES

Investors / Analysts:

Lonmin

 
                                       +27 11 218 8358 
 Tanya Chikanza (Head of Investor                    / 
  Relations)                          +44 20 7201 6007 
 Ruli Diseko (Investor Relations 
  Manager)                             +27 11 218 8300 
 

Media:

Cardew Group

 
 James Clark / Alexandra Stoneham    +44 20 7930 0777 
 Sue Vey                              +27 72 644 9777 
 

Brunswick - Johannesburg

 
                        +27 11 502 7400 
                                      / 
 Cecilia de Almeida     +27 83 325 9169 
 

Notes to editors

Lonmin, which is listed on both the London Stock Exchange and the Johannesburg Stock Exchange, is one of the world's largest primary producers of PGMs. These metals are essential for many industrial applications, especially catalytic converters for internal combustion engine emissions, as well as their widespread use in jewellery.

Lonmin's operations are situated in the Bushveld Complex in South Africa, where nearly 80% of known global PGM resources are found.

The Company creates value for shareholders through mining, refining and marketing PGMs and has a vertically integrated operational structure - from mine to market. Lonmin's mining operations extract ore from which the Process Division produces refined PGMs for delivery to customers. Underpinning the operations is the Shared Services function which provides high quality levels of support and infrastructure across the operations.

For further information please visit our website: http://www.lonmin.com

 
                                                                            3 months   3 months 
                                                                               to 31      to 31 
                                                                                 Dec        Dec 
                                                                                2012       2011 
 ------------------  -------------------------  ------------------  -----  ---------  --------- 
    Tonnes mined      Marikana                   Karee(1)             kt       1 213      1 211 
    Westerns(1)                                kt                                720        761 
    Middelkraal(1)                             kt                                542        476 
    Easterns(1)                                kt                                219        272 
   ------------------  --------------------------------------------------  ---------  --------- 
    Underground                                kt                              2 694      2 720 
    Opencast                                   kt                                155        118 
    Total                                      kt                              2 849      2 838 
                                                                           ---------  --------- 
   Pandora attributable(2)    Underground                   kt                    61         54 
   Lonmin Platinum            Underground                   kt                 2 755      2 774 
    Opencast                                   kt                                155        118 
    Total                                      kt                              2 910      2 892 
    % UG2                                       %                              72.6%      70.7% 
   ------------------  --------------------------------------------------  ---------  --------- 
 
 Tonnes milled(3)     Marikana                   Underground          kt       2 646      2 820 
    Opencast                                   kt                                 91         77 
    Total                                      kt                              2 737      2 897 
                                                                           --------- 
   Pandora(4)                 Underground                   kt                   146        126 
   Lonmin Platinum            Underground                   kt                 2 792      2 946 
        Head grade(5)                          g/t                              4.64       4.50 
     Recovery rate(6)                           %                              86.8%      85.3% 
    Opencast                                   kt                                 91         77 
        Head grade(5)                          g/t                              2.98       3.33 
     Recovery rate(6)                           %                              84.8%      85.7% 
    Total                                      kt                              2 883      3 023 
        Head grade(5)                          g/t                              4.59       4.47 
     Recovery rate(6)                           %                              86.8%      85.3% 
   ------------------  --------------------------------------------------  ---------  --------- 
 
 
 Metals in 
  concentrate(7)    Marikana           Platinum      oz    174 253   178 131 
----------------- 
   Palladium                       oz                       79 273    81 041 
 
   Gold                            oz                        4 238     4 664 
   Rhodium                         oz                       23 097    22 463 
   Ruthenium                       oz                       35 441    35 349 
   Iridium                         oz                        7 824     7 739 
   Total PGMs                      oz                      324 126   329 387 
   Nickel(8)                       MT                          856       966 
   Copper(8)                       MT                          547       624 
  ------------  ----------------------------------------  --------  -------- 
  Pandora(4)         Platinum               oz              10 336     8 595 
   Palladium                       oz                        4 770     3 993 
   Gold                            oz                           77        65 
   Rhodium                         oz                        1 615     1 310 
   Ruthenium                       oz                        2 456     2 012 
   Iridium                         oz                          433       345 
   Total PGMs                      oz                       19 687    16 321 
   Nickel(8)                       MT                           17        13 
   Copper(8)                       MT                           10         7 
  ------------  ----------------------------------------  --------  -------- 
  Concentrate        Platinum               oz                 907         0 
  purchases          Palladium              oz                 246         0 
   Gold                            oz                            3         0 
   Rhodium                         oz                           91         0 
   Ruthenium                       oz                           96         0 
   Iridium                         oz                           37         0 
   Total PGMs                      oz                        1 379         0 
   Nickel                          MT                            1         0 
   Copper                          MT                            0         0 
  ------------  ---------------------------------------- 
  Lonmin Platinum    Platinum               oz             185 497   186 725 
   Palladium                       oz                       84 290    85 035 
   Gold                            oz                        4 317     4 730 
   Rhodium                         oz                       24 803    23 773 
   Ruthenium                       oz                       37 992    37 361 
   Iridium                         oz                        8 295     8 084 
   Total PGMs                      oz                      345 193   345 708 
   Nickel(8)                       MT                          874       978 
   Copper(8)                       MT                          557       631 
  ------------  ----------------------------------------  --------  -------- 
 
 
                                                                 3 months   3 months 
                                                                    to 31      to 31 
                                                                      Dec        Dec 
                                                                     2012       2011 
 --------------------  -------------------  ------------  ----  ---------  --------- 
                        Lonmin refined 
 Refined production      metal production    Platinum      oz     135 364    112 220 
                       ------------------- 
    Palladium                          oz                          60 625     58 818 
 
    Gold                               oz                           3 560      3 663 
    Rhodium                            oz                           6 251     20 037 
    Ruthenium                          oz                          31 327     31 965 
    Iridium                            oz                           8 601      9 320 
    Total PGMs                         oz                         245 727    236 022 
   ------------  ---------------------------------------------  ---------  --------- 
   Toll refined 
    metal 
    production          Platinum                 oz                    91      1 730 
  ------------------- 
    Palladium                          oz                             128      4 124 
 
    Gold                               oz                             252        202 
    Rhodium                            oz                           1 688      1 580 
    Ruthenium                          oz                           1 457      1 704 
    Iridium                            oz                             267        588 
    Total PGMs                         oz                           3 883      9 928 
   ------------  ---------------------------------------------  ---------  --------- 
   Total refined 
    PGMs                Platinum                 oz               135 455    113 950 
  ------------------- 
    Palladium                          oz                          60 753     62 942 
 
    Gold                               oz                           3 812      3 865 
    Rhodium                            oz                           7 939     21 616 
    Ruthenium                          oz                          32 784     33 668 
    Iridium                            oz                           8 868      9 908 
    Total PGMs                         oz                         249 610    245 950 
   ------------  ---------------------------------------------  ---------  --------- 
   Base metals          Nickel(9)                MT                   768        730 
  ------------------- 
    Copper(9)                          MT                             467        366 
   ------------  ---------------------------------------------  ---------  --------- 
 
                        Refined metal 
 Sales                   sales               Platinum      oz     108 342     92 863 
                       ------------------- 
    Palladium                          oz                          44 071     39 492 
 
    Gold                               oz                           2 400      3 618 
    Rhodium                            oz                           4 362     18 235 
    Ruthenium                          oz                          19 061     24 684 
    Iridium                            oz                           4 341     10 698 
    Total PGMs                         oz                         182 576    189 590 
   ------------  ---------------------------------------------  ---------  --------- 
    Nickel(9)                          MT                             692        791 
    Copper(9)                          MT                             201        321 
    Chrome(9)                          MT                         277 552    261 205 
   ------------  ---------------------------------------------  ---------  --------- 
 
 
 Average prices     Platinum                           $/oz     1 575    1 532 
   Palladium                                   $/oz               666      627 
   Gold                                        $/oz             1 509    1 668 
   Rhodium                                     $/oz             1 184    1 549 
   Ruthenium                                   $/oz                82      121 
   Iridium                                     $/oz             1 016    1 041 
   $ basket price excl. by-product 
    revenue(10)                                $/oz             1 176    1 136 
   $ basket price incl. by-product 
    revenue(11)                                $/oz             1 268    1 238 
   R basket price excl. by-product 
    revenue(10)                                R/oz            10 152    9 204 
   R basket price incl. by-product 
    revenue(11)                                R/oz            10 886    9 935 
  ---------------------------------  -----------------------  -------  ------- 
   Nickel(9)                                   $/MT            14 296   15 287 
   Copper(9)                                   $/MT             7 239    6 874 
   Chrome(9)                                   $/MT                19       19 
  ---------------------------------  -----------------------  -------  ------- 
 
 Exchange rates     Average rate for period(12)         R/$      8.67     8.09 
----------------- 
   Closing rate                                R/$               8.45     8.07 
  ---------------------------------  -----------------------  -------  ------- 
 

Notes:

1 Karee includes the shafts K3, 1B, 4B and K4. Westerns comprises Rowland, Newman and ore purchases from W1. Middelkraal represents Hossy and Saffy. Easterns includes E1, E2 and E3.

2 Pandora attributable tonnes mined represents Lonmin's share (42.5%) of the total tonnes mined on the Pandora joint venture.

   3       Tonnes milled excludes slag milling. 

4 Lonmin purchases 100% of the ore produced by the Pandora joint venture for onward processing which is included in downstream operating statistics.

5 Head grade is the grammes per tonne (5PGE + Au) value contained in the tonnes milled and fed into the concentrator from the mines (excludes slag milled).

6 Recovery rate in the concentrators is the total content produced divided by the total content milled (excluding slag).

7 Metals in concentrate include metal derived from slag processing and have been calculated at industry standard downstream processing losses to present produced saleable ounces.

   8       Corresponds to contained base metals in concentrate. 

9 Nickel is produced and sold as nickel sulphate crystals or solution and the volumes shown correspond to contained metal. Copper is produced as refined product but typically at LME grade C. Chrome is produced in the form of chromite concentrate and volumes shown are in the form of chromite.

10 Basket price of PGMs is based on the revenue generated in Rand and Dollar from the actual PGMs (5PGE + Au) sold in the period based on the appropriate Rand / Dollar exchange rate applicable for each sales transaction.

   11     As per note 10 but including revenue from base metals. 

12 Exchange rates are calculated using the market average daily closing rate over the course of the period.

This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCSDIFFFFDSEDF

1 Year Lonmin Chart

1 Year Lonmin Chart

1 Month Lonmin Chart

1 Month Lonmin Chart