ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

KAT Katoro Gold Plc

0.09
0.00 (0.00%)
26 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Katoro Gold Plc LSE:KAT London Ordinary Share GB00BSNBL022 ORD GBP0.001
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.09 0.08 0.10 0.09 0.09 0.09 1,128,472 07:31:43
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Crude Petroleum & Natural Gs 0 -1.05M -0.0016 -0.56 602.55k
Katoro Gold Plc is listed in the Crude Petroleum & Natural Gs sector of the London Stock Exchange with ticker KAT. The last closing price for Katoro Gold was 0.09p. Over the last year, Katoro Gold shares have traded in a share price range of 0.065p to 0.165p.

Katoro Gold currently has 669,497,693 shares in issue. The market capitalisation of Katoro Gold is £602,548 . Katoro Gold has a price to earnings ratio (PE ratio) of -0.56.

Katoro Gold Share Discussion Threads

Showing 351 to 372 of 3950 messages
Chat Pages: Latest  26  25  24  23  22  21  20  19  18  17  16  15  Older
DateSubjectAuthorDiscuss
10/2/2020
12:15
where's all those bashers (inlcuding dave, and letme ...and the rest!) LMOA. you have been noted and will be totally ignored in the future. Get it. 10p...
invester2010
10/2/2020
12:08
KAT gone up 100%, KIBO only gone up 10%. KIBO own half the project
saw89
10/2/2020
12:01
days highs now.. will soon be double figures and only £15m cap
jackjackpaul
10/2/2020
11:53
#KAT see 6-7p close here.. that would still only be a £10m cap.. far too cheap. #EUA capped at £200m!

35,000 ounces of gold per annum and to have a 35-year life of mine £42 Million per annum.



That's a £ 1.6 Billion asset.

jackjackpaul
10/2/2020
11:47
I’ve got to say I am shocked this Mcap is still so low
saw89
10/2/2020
11:29
And the " herd" are still to arrive given the limited bb contributions
basem1
10/2/2020
11:19
At 500,000 tpm, the Project is targeted to produce approximately 35,000 ounces of gold per annum and to have a 35-year life of mine.

and we are only around £6m mcap.

i know which way this is going lol

jackjackpaul
10/2/2020
09:50
KIBO only up 10% so far, it has a lot of catching up to do
saw89
10/2/2020
09:43
KAT up 70%. KIBO own half of KAT. Load up and wait guys
saw89
10/2/2020
09:43
KAT up 70%. KIBO own half of KAT. Load up and wait guys
saw89
10/2/2020
09:21
Not even on people's radar this one No bb comments at all Wait until the herd arrive
basem1
10/2/2020
09:05
Do the numbers. The Gold tailings are just sitting there waiting to process. And this is not some random piece of land.. it’s an actual old mine with infrastructure etc. Fast route to revenue!

Here’s the JV partner:

smackeraim
10/2/2020
09:00
Louis Coetzee, Executive Chairman of Katoro, said: "I am pleased to confirm that we are now underway with the JV and the start of what Katoro are aiming to be a highly exciting journey into near term gold production.
"I would encourage shareholders and investors generally to read the announcement of 30 January 2020, which provides full details on this significant gold production opportunity for the Company, the transactional terms around this together with the key risk factors.
"This is a substantial opportunity for Katoro. The size and scale of the project means we have lots of work to do and I look forward to keeping shareholders updated on our progress."

philjeans
10/2/2020
08:58
Absolute no brainer at this price
basem1
10/2/2020
08:54
So KAT has a huge pile of gold mine tailings, with a guaranteed quantity of gold inside and now Blyvoor's expertise and money to extract it.

Bargain all the way to 10p.

philjeans
09/2/2020
17:29
dp you are actually more annoying than the spam mate
smackeraim
09/2/2020
15:22
Ahh you went with tradertim.. a truly vintage choice from the archives.
dplewis1
09/2/2020
08:47
Well that's 2 accounts you've posted with on here - why not go for the hattrick? Maybe go with Spurslegend11 we've not seen that one in a few days..moron.
dplewis1
07/2/2020
13:05
Yes - clearly overlooked!

Potentially a BILLION £ asset currently valued at just £3M

Bonkers.

BUY for me

philjeans
07/2/2020
11:47
People have missed it lol
smackeraim
07/2/2020
11:41
In £'s translation, what's that worth ?


They have 1.34 Million Oz of Gold already mined.



35,000 oz per annum is £ 42 Million per annum.



That's a £ 1.6 Billion asset.

jev1
07/2/2020
10:46
Katoro has entered into a binding conditional agreement to form a 50/50 unincorporated joint venture (JV) with Blyvoor Gold Operations and its holding company, Target Mine Consulting.

The JV partners plan to exploit potentially viable deposits of gold and any other minerals from six gold tailings dams owned by Blyvoor in South Africa, which contain a JORC code compliant resource of, in aggregate, 1.34 Moz of gold at an average grade of 0.30g/t gold.

Mining licence and environmental impact assessment

The project already has in place the requisite mining licence and environmental impact assessment (EIA) for the reprocessing of the tailings, allowing production to commence immediately upon commissioning of the processing plant.

Subject to funding, the JV partners are targeting initial production of up to 250 000 tpm of material from the tailings as part of a production ramp-up to achieve production of 500 000 tpm within two years.

At 500 000 tpm, the project is targeted to produce approximately 35 000 ozpa of gold and to have a 35-year life of mine.

Feasibility studies and testwork

The project will seek to use proven mining and processing technologies, whereby the JV partners believe recoveries of 56% to 60% are achievable, based on feasibility studies and test work completed to date by Minxcon, with additional confirmatory test work planned to optimise the financial projections and conceptual designs for the processing plant.

smackeraim
Chat Pages: Latest  26  25  24  23  22  21  20  19  18  17  16  15  Older

Your Recent History

Delayed Upgrade Clock