So short opening would be a sell |
If it was a short closing it would be a buy |
307k sell. Short closure? Or just large holder existing. The market really has something in for itm. As based on recent newsflow and skin in game it has obviously more than market giving it currently |
https://www.hydrogeninsight.com/electrolysers/using-different-brands-of-electrolysers-at-same-green-hydrogen-project-is-not-realistic-itm/2-1-1737956 |
May be of interest :- |
Skinny times article just about sums it up 😂😂128514;😂 |
Courtesy of the Times :- |
Recent appointment if anyone wants to look him up
As we are strategically expanding our capabilities to address the needs of our customers, we are pleased to announce that Kai Gransee will be joining us as our new Head of Construction & Commissioning. Working as a health and safety professional for more than 30 years, and in field construction since 1997, Kai brings significant global experience working in EPC businesses for oil, gas, petrochemical, chemical and renewable energy sectors. With his industrial gases experience at Linde Engineering and Air Products, Kai will play a key role leading and strengthening our site team. Kai will be based out of Germany. |
ITM expanding every day. Growing into a full blown hydrogen construction company. One stop shop for green hydrogen excellent appointment. |
I read Democracy spouted by democrats as their euphemism for Communism which is what they were trying to impose |
That is good.
Orange man bad.
Democracy is going to be sore mad. |
No complaints , and looking forward now orange man bad is on his way to Mount Rushmore |
SSE just signed a contract to build further offshore wind farms to supply 1 million homes. Not sure where that electricity is going to go if the grid can’t cope at the moment.
Today’s drop is no doubt coincided with Plug Q3 results. |
Might 'sound like' Graham, unhappily it is nowhere near. Have a look at the very recent report from NESO which is the government's own independent assessors.We need SMRs yesterday to ensure base load. All the big offshore wind farms, if they are built is super super fast time will not be able to transmit the power south.Great opportunity for ITM to lease kit to 'soak up' all the power that is being switched off because there is no transmission capacity. The new onshore site in Shetland by SSE (UK largest site onshore) was paid over £3M sshut down money in the first month of operation.Pay ITM £5m and the payback will be 3-6 months. |
How are things where you are? |
Probably quite easy most of time, the challenges come when we have weather like we've just had for last two weeks- anticyclonic gloom . Pretty much zero wind and zero solar (I made 10 kWh in 10 days). If green Hydrogen had been made in abundance then perhaps it'll work. Until then we'll need nuclear and probably gas to fall back on for some time to come. |
Itm is getting it again
Shorts paradise this is |
Sounds like the UK will be energy secure using renewables by 2035 unfortunately no one knows not even starmer how it’s going to be achieved 🙄 |
So, ESG?
How trendy! How considerate. |