ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

KIBO Kibo Energy Plc

0.0375
0.00 (0.00%)
26 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Kibo Energy Plc LSE:KIBO London Ordinary Share IE00B97C0C31 ORD EUR0.0001 (CDI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.0375 0.035 0.04 0.0425 0.0375 0.0425 3,606,771 12:17:48
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Gold Ores 1.04M -9.78M -0.0026 -0.15 1.51M

Kibo Mining Plc MCPP DPFS Work Completed (8334T)

01/04/2016 7:49am

UK Regulatory


Kibo Energy (LSE:KIBO)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Kibo Energy Charts.

TIDMKIBO

RNS Number : 8334T

Kibo Mining Plc

01 April 2016

Kibo Mining Plc (Incorporated in Ireland)

(Registration Number: 451931)

(External registration number: 2011/007371/10)

Share code on the JSE Limited: KBO

Share code on the AIM:KIBO

ISIN: IE00B97C031

("Kibo" or "the Company")

01 April 2016

Mbeya Coal to Power Project: Definitive Power Feasibility Study Work Completed

Kibo Mining plc ("Kibo" or the "Company") (AIM: KIBO; AltX: KBO), the Tanzania focussed mineral exploration and development company is pleased to announce that the Mbeya Coal to Power Project ("MCPP"), Definitive Power Feasibility Study ("DPFS") work has been completed on schedule. The DPFS report is now subject to a review process. The findings of the DPFS will be announced on completion of the review.

Louis Coetzee, CEO of Kibo Mining, said: "We are very pleased with the overall progress on the MCPP and in particular with the timely completion of work on the DPFS. The professional and committed way in which Tractebel has conducted the DPFS to date has been critical to delivering the PDFS work to the highest standard and within a very challenging timeframe.

Results from the DPFS can only be announced once the review process has been completed, but we can at this stage state that all the DPFS outcomes to date have been well within our expectations.

We remain on schedule with all other parallel and interdependent MCPP work streams as per the recently published MCPP Timeline & Description."

Contacts

 
                       +27 (0) 83 2606126       Kibo Mining       Chief Executive Officer 
     Louis Coetzee                                  plc 
--------------------  -------------------  --------------------  ------------------------ 
   Andreas Lianos      +27 (0) 83 4408365       River Group          Corporate Adviser 
                                                                   and Designated Adviser 
                                                                           on JSE 
--------------------  -------------------  --------------------  ------------------------ 
     Jon Belliss        +44 (0) 207 382     Beaufort Securities           Broker 
                              8300                Limited 
--------------------  -------------------  --------------------  ------------------------ 
    Oliver Morse        +61 8 9480 2500         RFC Ambrian          Nominated Adviser 
                                                  Limited                  on AIM 
--------------------  -------------------  --------------------  ------------------------ 
                                              Bell Pottinger        Investor and Media 
   Daniel Thöle     +44 (0) 203 772                                 Relations 
     / Anna Legge              2500 
--------------------  -------------------  --------------------  ------------------------ 
 

Kibo Mining - Notes to editors

Kibo Mining is listed on the AIM market in London and the AltX in Johannesburg. The Company is focused on exploration and development of mineral projects in Tanzania, and controls one of Tanzania's largest mineral right portfolios. Tanzania provides a secure and stable operating environment for the mineral resource industry and Kibo Mining therein.

Kibo Mining holds a thermal coal deposit at Rukwa, which has a significant JORC compliant defined resource (See Table 1 below), and is developing a 250-350MW mouth-of-mine thermal power station, the Mbeya Coal to Power Project ("MCPP"), previously called Rukwa Coal to Power Project ("RCPP"), with an established management team that includes Standard Bank as Financial Advisor. Kibo is undertaking a Coal Mining Definitive Feasibility Study and a Power Pre-Feasibility Study for the Mbeya project with an integrated Coal-Power interim study report to be released in the near term. On 20(th) April 2015, Kibo signed a Joint Development Agreement for the completion of the Definitive Feasibility Studies and development of the MCPP with China based EPC contractor SEPCO III.

The Company also has extensive gold focused interests including Lake Victoria Goldfields and Morogoro projects. At Lake Victoria, the Company has projects with a 550,000oz JORC compliant gold Mineral Resource at Imweru Project and a 168,000oz NI 43-101 compliant gold Mineral Resource at the Lubando Project in which the Company holds a 90% attributable interest. The Company is currently undertaking a Definitive Feasibility Study on its Imweru Project.

Kibo also holds the Haneti Project on which the latest technical report confirms prospectivity for nickel, PGMs, gold and strategic metals including lithium.

Kibo Mining further holds the Pinewood (coal & uranium) project where the company has entered into a 50/50 Exploration Joint Venture with Metal Tiger plc.

Finally, the Company also holds the Morogoro (gold) project where the company has also entered into a 50/50 Exploration Joint Venture with Metal Tiger plc.

The Company's projects are located in the established and gold prolific Lake Victoria Goldfields, the emerging goldfields of eastern Tanzania and the Mtwara Corridor in southern Tanzania where the Government has prioritised infrastructural development attracting significant recent investment in coal and uranium. The Company has a positive working relationship with the Tanzanian government at local, regional and national levels and works hard to maintain positive relationships with all communities where company interests are held. The Company recognises the potential to enhance the quality of life and opportunity for Tanzanian citizens through careful development of its projects.

Updates on the Company's activities are regularly posted on its website www.kibomining.com

Technical data

Rukwa Mineral Resource

Table 1 below presents a table showing the Mineral Resource estimate for the Rukwa Coal Project. The table is taken from an NI 43 101-Compliant Report by GEMECS (Pty) Ltd dated April 2012.

Table 1

 
 RUKWA COAL RESOURCE SUMMARY- GEMECS (Pty) Ltd 
-------------------------------------------------------- 
                   SEAM         NI 43-101     IN SITU 
----------  -----------------  ----------  ------------- 
 SEAM           THICKNESS         CLASS     MILLION TONS 
----------  -----------------  ----------  ------------- 
 S4                1.14         Indicated       2.17 
----------  -----------------  ----------  ------------- 
 S3U               2.04         Indicated       6.92 
----------  -----------------  ----------  ------------- 
 S3L               2.3          Indicated      12.63 
----------  -----------------  ----------  ------------- 
 S2                3.45         Indicated      23.43 
----------  -----------------  ----------  ------------- 
 S1U               2.48         Indicated       7.34 
----------  -----------------  ----------  ------------- 
 S1L               2.92         Indicated       17.4 
----------  -----------------  ----------  ------------- 
 S0                1.08         Indicated       1.44 
----------  -----------------  ----------  ------------- 
 Total Indicated Resources                     71.34 
-----------------------------  ----------  ------------- 
 S4                1.31         Inferred        1.38 
----------  -----------------  ----------  ------------- 
 S3U               2.24         Inferred        2.94 
----------  -----------------  ----------  ------------- 
 S3L               2.27         Inferred        3.86 
----------  -----------------  ----------  ------------- 
 S2                3.42         Inferred        7.94 
----------  -----------------  ----------  ------------- 
 S1U               2.05         Inferred        6.5 
----------  -----------------  ----------  ------------- 
 S1L               3.15         Inferred       12.83 
----------  -----------------  ----------  ------------- 
 S0                1.06         Inferred        2.6 
----------  -----------------  ----------  ------------- 
 Total Inferred Resources                      38.05 
-----------------------------  ----------  ------------- 
 TOTAL RESOURCES                              *109.39 
-----------------------------  ----------  ------------- 
 

*Kibo holds 100% of the Rukwa Mineral Resource

Review by Qualified Persons

The information in this announcement that relates to the Rukwa Coal Mineral Resource is taken from a report titled "Independent Technical Report for the Rukwa Coal Project, Mbeya Region, United Republic of Tanzania" dated 19(th) April 2012 by CD van Niekerk Director and Principal Geologist with the firm GEMECS (Pty) Ltd. Mr van Niekerk is a Professional Natural Scientist with the South African Council for Natural Scientific Professions (SACNASP), Registration No. 400066/98 and a Fellow Member of the Geological Society of South Africa. He has relevant experience and technical qualifications to be a "Qualified Person" for reporting coal resources to the NI 43-101 Standard

The Company's Exploration Director, Noel O'Keeffe has reviewed the resource reports and the references to them in this announcement.

Johannesburg

01 April 2016

Corporate and Designated Adviser

River Group

This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCEAKLFELXKEEF

(END) Dow Jones Newswires

April 01, 2016 02:49 ET (06:49 GMT)

1 Year Kibo Energy Chart

1 Year Kibo Energy Chart

1 Month Kibo Energy Chart

1 Month Kibo Energy Chart

Your Recent History

Delayed Upgrade Clock