ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

AEX Aminex Plc

1.15
-0.05 (-4.17%)
Last Updated: 10:02:22
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Aminex Plc LSE:AEX London Ordinary Share IE0003073255 ORD EUR0.001 (CDI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  -0.05 -4.17% 1.15 1.10 1.20 1.20 1.15 1.20 5,823,384 10:02:22
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Crude Petroleum & Natural Gs 64k -4.06M -0.0010 -11.50 48.43M

Aminex PLC Ntorya Gas Field Basin Model Update (6598P)

04/09/2017 7:00am

UK Regulatory


Aminex (LSE:AEX)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Aminex Charts.

TIDMAEX

RNS Number : 6598P

Aminex PLC

04 September 2017

4 September 2017

Aminex plc

("Aminex" or "the Company")

Ntorya Gas Field Basin Model Update - Further Material Resource Upgrade

Aminex is pleased to announce a further material increase in its management estimate of gas initially in place ('GIIP') in its Ntorya appraisal area in the onshore Ruvuma Basin of Tanzania.

The Company has upgraded its unrisked resource estimates from 466 BCF ('billion Standard Cubic Feet') Pmean GIIP to approximately 1.3 TCF Pmean GIIP. This update is based on ongoing technical work which includes data from the successful Ntorya-2 appraisal well and subsequent re-evaluation of existing seismic, including reprocessing of select seismic lines and detailed review of Ruvuma PSA well data.

These management estimates cover the Ntorya appraisal area only and do not include the potential of the adjoining exploration acreage. The Company is in the process of engaging an independent third party auditor to prepare an updated reserves and resource report.

Aminex is currently working with io oil & gas consultancy (a joint venture between Baker Hughes, a GE Company, and McDermott) to prepare a gas commercialisation plan which, together with submission of the Ntorya Field development plan to the Tanzania Petroleum Development Corporation, is expected to be completed in early September.

An updated presentation which details the mapping and resource numbers is available on the Company website.

Jay Bhattacherjee, CEO of Aminex, said:

"The updated modelling, mapping and corresponding resource numbers continue to confirm that the Ruvuma Basin is of significant importance to Tanzania and the Company. We continue to work directly with the Tanzania Petroleum Development Corporation to create an optimal development plan so as to begin gas production from the licence as quickly as possible."

Ends

For further information, please contact:

Aminex PLC

Jay Bhattacherjee, Chief Executive Officer +44 (0) 20 3198 8415

Max Williams, Chief Financial Officer

Investec Bank plc

Chris Sim +44 (0) 207 597 4000

Shore Capital

Jerry Keen

+44 (0) 20 7408 4090

Davy

Brian Garrahy +353 (0) 1 679 6363

Camarco

Billy Clegg / Gordon Poole / James Crothers +44 (0) 20 3757 4980

Notes to editors

Aminex PLC is a producing company which is premium listed on the London Stock Exchange and primary-listed on the Irish Stock Exchange. The Company's focus is its three licences in Tanzania, where it was one of the first independent oil companies to enter the country in 2002:

Ruvuma Production Sharing Agreement (75%) Operator

The Ruvuma acreage includes Aminex's Ntorya-1 and Ntorya-2 onshore Cretaceous gas discoveries in the Ntorya appraisal area, a component of the Ruvuma PSA. The Company considers that the Ntorya appraisal area has Pmean GIIP of 1.3 Trillion Cubic Feet ('TCF'). The Ntorya-1 well tested at 20 MMscd with 139 bbls of associated condensate and the Ntorya-2 well tested at an average flow rate of 17MMscd on a 40/64' choke.

Kiliwani North Development Licence (57.4474%) Operator

The Kiliwani North Field has been independently ascribed with 28 BCF gross contingent (2C) resource and is currently in production at 10 MMscd. Gas is sold at the well head in $US at a fixed price and fed directly into the Tanzania's pipeline infrastructure to Dar es Salaam.

Nyuni Area Production Sharing Agreement (93.3333%) Operator

The Nyuni Area acreage offers high impact exploration and has been ascribed 4.2 TCF prospective resource. Drilling success in the region based on 3D seismic has been over 90%.

This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCKXLBBDKFFBBQ

(END) Dow Jones Newswires

September 04, 2017 02:00 ET (06:00 GMT)

1 Year Aminex Chart

1 Year Aminex Chart

1 Month Aminex Chart

1 Month Aminex Chart

Your Recent History

Delayed Upgrade Clock