ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

HDA

0.00
0.00 (0.00%)
Last Updated: -
Delayed by 15 minutes
Share Name Share Symbol Market Type
TSXV:HDA TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0 -

Huldra Silver Inc. Samples Up to 2920g/t Ag or 85.16oz/t Ag in New Mineralized Zone at Treasure Mountain

14/10/2010 2:45pm

Marketwired Canada


Huldra Silver Inc. (TSX VENTURE:HDA) (the "Company" or "Huldra Silver") is
pleased to announce assay results from a new mineralized zone and completion of
a 17 hole drill program. The samples were taken on September 12, 2010 by
independent QP Erik Ostensoe, P.Geo and were highlighted by a 2920g/t chip
sample over a width of 30.5cm. The new zone was discovered using mechanized
trenching following up on results from a historical soil sampling program. All
samples were analyzed at the Eco Tech Laboratory in Kamloops, B.C., a full
service, ISO 9001:2008 accredited analytical laboratory. All lab quality control
protocols were observed. Complete results are presented in the following: (note
that "g/t" represents "grams per metric tonne" and that 34.286 grams equals one
troy ounce per short ton, "st" ):


East Zone Extension

The following chip sample results were from trenches beginning 190m east of
where a 15 hole drill program was completed (results are pending) after previous
chip samples yielded results up to 6650g/t Ag. Prior to receiving the lab
results management decided to drill 2 additional shallow holes in the vicinity
of sample WP 016 in an effort to test the new structure below surface and
beneath the oxidization.




----------------------------------------------------------------------------
Sample Descriptions - East Zone Extension                                   
----------------------------------------------------------------------------
Sample                                         silver   silver              
 No    12-Sep-10 Description                  g/tonne oz/tonne lead % zinc %
----------------------------------------------------------------------------
                 Chip samples           Width                               
----------------------------------------------------------------------------
       WP 016    Trench 190m                                                
                 East of                                                    
                 Previous                                                   
                 Samples                                                    
----------------------------------------------------------------------------
63981            west end of                                                
                 trench North                                               
                 wall           18" = 45.7 cm      16     0.47   0.43   0.27
----------------------------------------------------------------------------
63982            vein - centre                                              
                 of trench        26" = 66 cm     468    13.65   5.25   1.22
----------------------------------------------------------------------------
63983            south wall of                                              
                 trench         25" = 63.5 cm      20     0.58   0.12   0.16
----------------------------------------------------------------------------
                 Second                                                     
                 trenched area                                              
                 about 30 m                                                 
                 east of WP 016                                             
----------------------------------------------------------------------------
63984            east side of                                               
                 trench         16" = 40.6 cm      54     1.58   0.51   0.51
----------------------------------------------------------------------------
63985            center of                                                  
                 trench           24" = 61 cm      74     2.16   0.63   0.58
----------------------------------------------------------------------------
63986            wall rock -                                                
                 argillite      16" = 40.6 cm      12     0.35   0.11   0.16
----------------------------------------------------------------------------
63987            specimen                                                   
                 sample (R.S.)    grab sample      30     0.88   0.14   1.53
----------------------------------------------------------------------------
63988  WP 017    southeast end                                              
                 of trench        30" = 76 cm     340     9.92   4.02   1.03
----------------------------------------------------------------------------
63989  WP 018    eastmost end                                               
                 of trench        grab sample     420    12.25   1.05   1.25
----------------------------------------------------------------------------
       WP 019    Lowermost                                                  
                 trench about                                               
                 100m East of                                               
                 WP 016                                                     
----------------------------------------------------------------------------
63990            Oxidized Vein  36" = 91.4 cm     214     6.24   2.30   0.66
----------------------------------------------------------------------------
63991            continuation                                               
                 of sample no.                                              
                 63990            30" = 76 cm     388    11.32   6.15   0.66
----------------------------------------------------------------------------
63992            continuation                                               
                 of sample no.                                              
                 63991          12" = 30.5 cm    2920    85.16  38.50   0.50
----------------------------------------------------------------------------



The surface expression of this structure was traced another 50m further east
before the overburden became too deep to follow the structure any further. These
results are very encouraging due to the anticipated strike length of the
structure and the positive lab results despite the weathering and oxidization of
the vein. There are existing roads and access points that will allow for drill
access over a 400m length on this structure. Making a new discovery of this size
demonstrates to us the exploration potential on the historic 7000 acre Treasure
Mountain Property, 100% owned by Huldra Silver Inc.


The samples from the East Zone Extension begin approximately 1000 metres east of
the Main Mine area where a NI 43-101 compliant resource estimate in 2009
reported a total vein indicated resource, using a 10oz/t Ag cut-off, of 33,000
tonnes grading 26.68oz/tonne Ag, 4.16%Pb, and 3.8% Zn and a total vein inferred
resource, using a 10oz/t Ag cut-off, of 120,000 tonnes grading 29.76oz/tonne Ag,
2.79%Pb, and 4.36% Zn. 2750 metres of underground development has been completed
on four levels in the main mine area.


Details of the Company's property can be found in its 43-101 Technical Report
filed on Sedar on July 21, 2009.


Technical information in this news release has been reviewed and approved by
Erik Ostensoe, P. Geo., the Company's independent Qualified Person as defined by
NI 43-101. Huldra Silver is currently working on plans to put the Treasure
Mountain Project, located 3 hours east of Vancouver, BC, into development
subject to permitting and financing. The Company is also actively assessing
other opportunities for acquisition and development.


On behalf of the Board of Directors

Ryan Sharp, MBA, President, CEO & Director

Disclaimer for Forward-Looking Information

Certain statements in this release are forward-looking statements, which reflect
the expectations of management regarding the Company's overall business
development objectives and plans. Forward-looking statements consist of
statements that are not purely historical, including any statements regarding
beliefs, plans, expectations or intentions regarding the future, and include
discussion of the Company's planned work to be undertaken as a result of the
Company's receipt of the Mines Act Permit, and that the Company intends to put
the Treasure Mountain Project into development. Such statements are subject to
risks and uncertainties that may cause actual results, performance or
developments to differ materially from those contained in the statements. No
assurance can be given that any of the events anticipated by the forward-looking
statements will occur or, if they do occur, what benefits the Company will
obtain from them. These forward-looking statements reflect management's current
views and are based on certain expectations, estimates and assumptions which may
prove to be incorrect. A number of risks and uncertainties could cause the
Company's actual results to differ materially from those expressed or implied by
the forward-looking statements, including: (1) a downturn in general economic
conditions in North America and internationally, (2) the inherent uncertainties
and speculative nature associated with silver exploration, (3) a decreased
demand for silver, (4) any number of events or causes which may delay
exploration and development of the Company's property interests, such as
environmental liabilities, weather, mechanical failures, safety concerns and
labour problems, (5) the risk that the Company does not execute its business
plan, (6) inability to finance operations and growth, (7) inability to obtain
all necessary permitting and financing, and (8) other factors beyond the
Company's control. These forward-looking statements are made as of the date of
this news release and the Company assumes no obligation to update these
forward-looking statements, or to update the reasons why actual results differed
from those projected in the forward-looking statements, except in accordance
with applicable securities laws. Additional information about the Company and
these and other assumptions, risks and uncertainties is available in the
Company's public filings with Canadian securities regulators, available on SEDAR
at www.sedar.com.


1 Year Chart

1 Year  Chart

1 Month Chart

1 Month  Chart

Your Recent History

Delayed Upgrade Clock