ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

GLC Gallic Energy Ltd.

0.00
0.00 (0.00%)
Share Name Share Symbol Market Type
Gallic Energy Ltd. TSXV:GLC TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0 -

Gallic Energy Ltd. Releases Resource Estimates for GER Permit, France, Names New CFO and Will Present at 2011 Oil & Gas Finan...

02/11/2011 2:25pm

Marketwired Canada


Gallic Energy Ltd. ("Gallic" or "Company") (TSX VENTURE:GLC) announced that an
independent resource evaluation report (the "Report") has been completed by
Calgary-based GLJ Petroleum Consultants Ltd. ("GLJ") on the undiscovered
petroleum initially-in-place ("UPIIP"), effective September 30, 2011, of the
Company's 100% owned Ger Permit, in the Aquitaine Basin, onshore France.


Mr. William H. Smith, President and CEO of Gallic, said "We are pleased to have
this Report which quantifies the significant size of the targets that our
two-well re-entry program will be evaluating. Gallic's testing program is
designed to provide proof of concept of these formations as commercial
reservoirs, to measure production rates and to further quantify the hydrocarbons
in place."


GLJ's Unrisked UPIIP estimates of gas can be divided into three geologic play
concepts to be tested by the 2 wells. All figures are given in BCF:




----------------------------------------------------------------------------
                                        Low(i)   Best(i)            High(i) 
                                      Estimate  Estimate   Mean(i) Estimate 
Play                Well    Formation     (P90)     (P50) Estimate     (P10)
----------------------------------------------------------------------------
Mountain Front                                                              
 Fault Trap      Ossun 2       Eocene        6        15        22       44 
                        ----------------------------------------------------
                        DanoPaleocene        1         3         4        8 
                        ----------------------------------------------------
                        Up CretFlysch       62       158       222      453 
----------------------------------------------------------------------------
Strat Trap     Azereix 1       Eocene        7        45        82      195 
--------------          ----------------------------------------------------
Unconformity                                                                
 Trap                          Aptian       56       162       270      598 
                        ----------------------------------------------------
                            Barremian       31       128       187      419 
----------------------------------------------------------------------------



In addition GLJ has estimated the Unrisked UPIIP of condensate and oil in the
Aptian Formation for the Unconformity Trap in Thousands of Barrels:




----------------------------------------------------------------------------
                                        Low(i)   Best(i)            High(i) 
                                      Estimate  Estimate   Mean(i) Estimate 
Play                Well    Formation     (P90)     (P50) Estimate     (P10)
----------------------------------------------------------------------------
Unconformity                                                                
 Trap          Azereix 1       Aptian      650     1,608     2,207    4,430 
----------------------------------------------------------------------------



Estimates of UPIIP were generally prepared using land and technical information
including well information, engineering, geological and geophysical data
available from Gallic up to September 30, 2011. There is no certainty that any
portion of the resources will be discovered. A recovery project cannot be
defined for this volume of undiscovered petroleum initially-in-place at this
time. There is no certainty that it will be commercially viable to produce any
portion of the resources.


The GLJ resource evaluation was prepared in accordance with the procedures and
standards contained in the Canadian Oil and Gas Evaluation Handbook. The UPIIP
definitions used in preparing this Report are those contained the COGE Handbook
and the Canadian Securities Administrators National Instrument 51-101 (NI
51-101).


Gallic is well financed with $20 million cash on hand to meet its planned
activities. Surface land clearing has been completed at Azereix-1, and surface
construction will commence at both locations next week. Halliburton is providing
Project Management services through the planning, construction, re-entry and
testing phases of this program.


Gallic is pleased to announce that Dean Callaway has been appointed
Vice-President, Finance and Chief Financial Officer, effective November 1, 2011.
Mr. Callaway has over 20 years of experience in the energy industry in North
America and internationally. Prior to Gallic, Mr. Callaway was CFO of TG World
Energy, a former TSXV oil and gas company with international operations in
Alaska, the Philippines and Niger, Africa. Prior to TG, Mr. Callaway held senior
financial positions with junior oil and gas companies involved in Thailand,
Tunisia and the North Sea. He has led the mergers and acquisition group and
performed international corporate development and finance at major Canadian
pipeline companies. Mr. Callaway is a Certified General Accountant in addition
to holding a MBA and B-Comm. After serving as the company's Chief Financial
Officer since March 2009, Mr. David Little will resign to pursue other business
opportunities. We thank Mr. Little for his contribution to the Company during
this exciting period of our growth.


Mr. William H. Smith, President and CEO of Gallic, will be presenting at 10:20 -
10:40 am, Tuesday, November 8, 2011 at the 2011 Oil & Gas Finance Forum in New
York City.


(i)Low Estimate is considered to be a conservative estimate of the quantity that
will actually be recovered. It is likely that the actual remaining quantities
recovered will exceed the low estimate. If probabilistic methods are used, there
should be at least a 90 percent probability (P90) that the quantities actually
recovered will equal or exceed the low estimate.


(i)Best Estimate is considered to be the best estimate of the quantity that will
actually be recovered. It is equally likely that the actual remaining quantities
recovered will be greater or less than the best estimate. If probabilistic
methods are used, there should be at least a 50 percent probability (P50) that
the quantities actually recovered will equal or exceed the best estimate.


(i)High Estimate is considered to be an optimistic estimate of the quantity that
will actually be recovered. It is unlikely that the actual remaining quantities
recovered will exceed the high estimate. If probabilistic methods are used,
there should be at least a 10 percent probability (P10) that the quantities
actually recovered will equal or exceed the high estimate.


(i)Mean Estimate is the arithmetic average from the probabilistic assessment.

1 Year Gallic Energy Ltd. Chart

1 Year Gallic Energy Ltd. Chart

1 Month Gallic Energy Ltd. Chart

1 Month Gallic Energy Ltd. Chart