ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

BOB

0.00
0.00 (0.00%)
Share Name Share Symbol Market Type
TSXV:BOB TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0 -

Global Hunter Commences Drilling of Molybdenum Mineralization at Rabbit South

03/09/2008 5:47pm

Marketwired


Global Hunter Corp. (TSXV:BOB)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Global Hunter Corp. Charts.

Global Hunter Corp. (TSX VENTURE: BOB) ("Global Hunter" or "the Company") is pleased to announce that Foraco Drilling Ltd. ("Foraco") of Kamloops, British Columbia has been awarded the contract for drilling at the Rabbit South Property. The drilling program began on August 5, 2008 when Foraco brought a Connor 25 HH diamond drill on the property.

The first seven holes equaling 1,230 metres of the 3,700-metre diamond drill program have been completed. These holes are located in the southern half of the higher grade Eastern Zone. Five of the completed holes have twinned previous historic holes to confirm the historic molybdenum grades shown in the table below.


---------------------------------------------------------------------------
2008 DDH      Holes twinned    Depth    From m    To m    Length m     % Mo
---------------------------------------------------------------------------
RS-D-08-123   RS-D-80-56       288.0      13.4   185.9       172.5    0.057
---------------------------------------------------------------------------
              Including                   33.5    82.3        48.8    0.090
---------------------------------------------------------------------------
RS-D-08-125   RS-P-79-28        79.2       9.1    79.2        70.1    0.028
---------------------------------------------------------------------------
              Including EOH sample        76.2    79.2         3.0    0.179
---------------------------------------------------------------------------
              RS-D-81-87       272.2       6.9   243.8       237.0    0.025
---------------------------------------------------------------------------
              Including                  137.2   182.9        45.7    0.046
---------------------------------------------------------------------------
RS-D-08-126   RS-P-79-26        88.4      15.2    61.0        45.7    0.037
---------------------------------------------------------------------------
RS-D-08-127   RS-P-80-61       106.7      12.2   106.7        94.5    0.047
---------------------------------------------------------------------------
              Including                   45.7    97.5        51.8    0.061
---------------------------------------------------------------------------
RS-D-08-129   RS-P-80-81        54.9      10.1    54.9        44.8    0.037
---------------------------------------------------------------------------
              Including                   21.3    42.7        21.4    0.037
---------------------------------------------------------------------------

Three of the historic holes completed by previous operators twinned this year were finished while still in molybdenum mineralization. All the holes this year have intersected molybdenite bearing quartz vein stockwork in quartz monzonite porphyry intrusion from surface to the Thrust Fault that defines the contact with the underlying Nicola Group andesite and andesite tuffs.

Results will be analyzed by Eco Tech laboratories in Kamloops, British Columbia and will be released once prepared. A National Instrument 43-101 compliant resource estimate is scheduled to be complete by year-end including data from the current program.

Global Hunter's Exploration Manager, Tor Bruland, M. Sc., P.Geo. (B.C.), designed the drilling program, and has reviewed and approved the technical information in this news release. The diamond drilling is supervised by project manager, Donald G. Allen, M.A.Sc., P. Eng. (B.C.). Both are the Qualified Persons as defined by National Instrument 43-101.

ABOUT RABBIT SOUTH

The property consists of 1,900 hectares located near Kamloops, British Columbia, 30 kilometers North East of the Highland Valley copper mine, and is accessible year round by highways and logging roads.

The molybdenum mineralization at Roper Lake was discovered in 1959 by Kennco Exploration (Western) Ltd. and was first drilled by Dominic Lake Mining Co. Ltd. in 1967 before being explored further between 1979 and 1981 by Cominco Ltd. Global Hunter optioned the property in January 2004 and has since completed two drill programs in 2005 and 2007.

On Behalf of the Board of Directors GLOBAL HUNTER CORP.

Rod Husband, P.Geo. (B.C.), President

This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

Contacts: Global Hunter Corp. Investor Relations (604) 681-4653 or 1-866-282-8398 (604) 683-6557 (FAX) Email: info@globalhunter.ca Website: www.globalhunter.ca

1 Year Global Hunter Corp. Chart

1 Year Global Hunter Corp. Chart

1 Month Global Hunter Corp. Chart

1 Month Global Hunter Corp. Chart

Your Recent History

Delayed Upgrade Clock