We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
Alexander Mining | TSXV:AXD | TSX Venture | Common Stock |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 0 | - |
Alexander Mining plc ('Alexander' or the 'Company') (TSX VENTURE:AXD)(AIM:AXM) - Alexander is pleased to report that it has, in partnership with MC Process Pty Ltd ('MC Process') of South Africa, completed construction of an AmmLeach(R) copper/cobalt demonstration pilot plant in Johannesburg, and has commenced commissioning the plant using bulk ore samples from the DRC. As part of Alexander's initiatives in the DRC, we have collected a significant range of copper and cobalt mineralisation samples from the DRC for initial laboratory amenability testing. The testwork results have been highly encouraging and jointly we have now established a pilot plant at MC Process's premises. Initially, the plant will be used for testing larger bulk representative samples which have been delivered from the DRC, but will be capable of treating other base metal deposit types. The AmmLeach(R) cobalt/copper process has particular relevance to the DRC which accounts for around 53% of world mine production in 2011 and 45% of world reserves (source: U.S. Geological Survey January 2012). Moreover, the majority of cobalt currently produced in the DRC is as an intermediate product. The AmmLeach(R) cobalt/copper process is simpler and requires fewer unit processes to produce cobalt and copper metal cathode, resulting in significantly reduced capital and operating costs compared to the conventional acid/SO2 process. Given the inherent high costs associated with operating within the DRC, using conventional technology, AmmLeach(R) has the potential to enable the processing of a significantly greater number of deposits that have to date been considered marginal or uneconomic to develop. Furthermore, the AmmLeach(R) process: -- may economically treat high carbonate and acid consuming ore bodies that are prevalent in the DRC and which may not be economically treated using acid leaching; and -- is also ideally suited to heap leaching 'lower' grade ore bodies. The results from the pilot plant will be invaluable for design and scale up to a full size commercial plant. MC Process is Alexander's partner of choice for AmmLeach(R) plant design and engineering in Africa and it is dedicated to the design and manufacture of minerals processing equipment, especially solvent extraction electro-winning ("SX-EW") plants. Moreover, it has considerable experience with designing and establishing SX-EW plants in the DRC and other countries in Africa. Martin Rosser, Chief Executive Officer, said: "This pilot plant will be the first in Africa to showcase Alexander's innovative AmmLeach(R) technology producing both copper and cobalt metal from two circuits in the one plant. It will be integral to our business development plans for the DRC Copperbelt and also for testing material from copper and cobalt projects in other parts of Africa and the world. The ability for third parties to see the AmmLeach(R) process working will be invaluable for its commercialisation. Moreover, we are delighted with the highly beneficial relationship already developed with MC Process and we look forward to our continued successful close collaboration." Forward Looking Statements This news release contains forward looking statements, being statements which are not historical facts, including, without limitation, statements regarding potential results of AmmLeach(R) testwork, anticipated applications for the AmmLeach(R) processing and discussions of future plans and objectives. There can be no assurance that such statements will prove accurate. Such statements are necessarily based upon a number of estimates and assumptions that are subject to numerous risks and uncertainties that could cause actual results and future events to differ materially from those anticipated or projected. Important factors that could cause actual results to differ materially from the Company's expectations are in Company documents filed from time to time with the TSX Venture Exchange and provincial securities regulators, most of which are available at www.sedar.com. The Company disclaims any intention or obligation to revise or update such statements unless required by law.
1 Year Alexander Mining Chart |
1 Month Alexander Mining Chart |
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions