ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

ATM Atacama Pacific Gold Corporation

0.00
0.00 (0.00%)
Share Name Share Symbol Market Type
Atacama Pacific Gold Corporation TSXV:ATM TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0 -

Atacama Pacific Provides Cerro Maricunga Project Update

07/06/2012 10:56pm

Marketwired Canada


Atacama Pacific Gold Corporation (TSX VENTURE:ATM) ("Atacama Pacific") is
pleased to report continued positive drill results from the recently completed
45,995-metre Phase III drilling campaign at its Cerro Maricunga oxide gold
project located in Chile's Maricunga Mineral Belt. Highlights of the recent
results, summarized in Table 1, include:




--  Crux Zone (CMD-196), 124 metres grading 1.10 gram per tonne gold ("g/t
    Au"); 
--  Phoenix Zone (CMD-140), 230 metres grading 0.55 g/t Au; 
--  Lower East Zone (CMR-164), 50 metres grading 1.04 g/t Au; and, 
--  Exploration (CMR-190), 90 metres grading 0.49 g/t Au including 18 metres
    at 1.00 g/t Au. 



The majority of the results reported were from infill drilling throughout the
Cerro Maricunga deposit and were largely as anticipated; however, targets
drilled outside the deposit area resulted in the expansion of the newly
identified Lower East Zone and the discovery of two new areas of oxide gold
mineralization (see attached drill plan).


Five drill holes were collared along a new gold trend, the Lower East Zone,
previously cut by CMR-155 (222 m grading 0.45 g/t Au) and CMR-150 (14 m at 0.53
g/t Au) - see April 2, 2012 press release. Recent drilling on the Lower East
Zone returned 50 metres grading 1.04 g/t Au (CMR-154), 94 metres grading 0.40
g/t Au (CMR-194) and 30 metres at 0.48 g/t Au (CMR-197). Drill holes CMR-194 and
CMR-197 were drilled in opposite directions from the same station.


Drill hole CMR-190 cut a new area of oxide mineralization returning 90 metres
grading 0.49 g/t Au including a higher grade core of 18 metres of 1.00 g/t Au.
CMR-190 was collared on section 1150, approximately 600 metres northeast of the
northwesterly trending Phoenix Zone.


A third new area of oxide mineralization was recently intersected approximately
150 metres north of the Crux Zone with CMR-205 returning 32 metres grading 0.78
g/t Au. Additional drilling will be required to determine if the intersection
represents a new zone of gold mineralization or if it is related to the Lower
East or Crux Zones.


"The discovery of new areas of oxide gold mineralization off the main Cerro
Maricunga trend opens the potential of the entire 2.5 by 2.0 kilometre Cerro
Maricunga volcanic complex and these areas represent significant targets for our
next drill program", said Carl Hansen, President and CEO of Atacama Pacific.
"Within the Cerro Maricunga deposit, the consistency of the infill drilling
results has been very good. The majority of the Crux Zone results have now been
reported. The remainder of the assay results, from the Phoenix and Lynx zones,
should be available within the next four weeks leading to an updated resource
estimate scheduled for release during August 2012. Work at site is presently
focused on collecting a number of samples for continued metallurgical testing as
well as drilling water monitoring wells for base environmental studies."


PEA Update

With the pending August resource estimate adding a further 129 drill holes to
the 90 holes used in the previous resource, Atacama Pacific has decided postpone
the release of the Preliminary Economic Assessment ("PEA") until the fourth
quarter so that updated resource can be incorporated into the PEA. This timing
will also allow for further metallurgical testing to be completed at crush sizes
up to 15 centimetres as well as examining the potential of using one of the
adjacent large valleys for a valley fill heap leach processing area.


Phase III Drilling Program

A total of 45,995 metres of drilling was completed during the Phase III program
compared to a budget of 42,000 metres. Good weather conditions combined with
better than projected reverse circulation ("RC") drilling rates contributed to
the increased metres drilled. Thirty eight diamond holes were drilled for 14,361
metres and 91 RC holes were completed for 31,634 metres drilled. Since 2010,
there has been a total 79,600 meters of drilling completed on Cerro Maricunga.


About Atacama Pacific Gold Corporation

Atacama Pacific's principal business is the acquisition, exploration and
development of precious metals resource properties in Chile. Atacama Pacific's
primary mineral property is the Cerro Maricunga oxide-associated, breccia-hosted
gold project which hosts a resource, at a 0.3 g/t Au cut-off grade, of 1.62
million ounces of gold (92.8 million tonnes grading 0.54 g/t Au) in the
indicated category with a further 1.95 million ounces (116.7 million tonnes
grading 0.52 g/t Au) in the inferred category. Atacama Pacific's goal is to
become a producer of gold through the exploration and development of the Cerro
Maricunga Gold Project. Atacama Pacific also owns four other mineral properties
within close proximity to the Cerro Maricunga Project and a fifth property in
Chile's Region I.


National Instrument 43-101 Compliance

The Cerro Maricunga resource estimate was prepared under Canadian Institute of
Mining, Metallurgy and Petroleum Definition Standards (2005). Michael Easdon is
the independent qualified person, as defined by National Instrument 43-101 ("NI
43-101"), for the resource estimate. SRK Consulting (Chile) S.A undertook to
prepare and is responsible for the resource estimate. Joled Nur, Geostatistical
Engineer for SRK Consulting (Chile) and a member of the Australasian Institute
of Mining and Metallurgy, is the qualified person who prepared the resource
estimate. For further details on the resource estimate as well as quality
control and quality assurance procedures, please review Atacama Pacific's August
24, 2011 press release or review the NI 43-101 compliant Technical Report dated
October 7, 2011 filed at www.sedar.com. Mr. Easdon, an independent qualified
person as defined by NI 43-101, has reviewed and verified the contents of this
press release.


FORWARD LOOKING STATEMENTS

This release contains forward-looking statements, including predictions,
projections and forecasts. Forward-looking statements include, but are not
limited to, statements with respect to completion of economic assessments,
exploration results, the success of exploration activities generally, mine
development prospects, and future gold production Often, but not always,
forward-looking statements can be identified by the use of words such as
"plans", "planning", "expects" or "does not expect", "continues", "scheduled",
"estimates", "forecasts", "intends", "potential", "anticipates", "does not
anticipate", or "belief", or describes a "goal", or variation of such words and
phrases or state that certain actions, events or results "may", "could",
"would", "might" or "will" be taken, occur or be achieved.


Forward-looking statements involve known and unknown risks, future events,
conditions, uncertainties and other factors which may cause the actual results,
performance or achievements to be materially different from any future results,
prediction, projection, forecast, performance or achievements expressed or
implied by the forward-looking statements. Such factors include, among others,
the results of due diligence activities, the interpretation and actual results
of current exploration activities; changes in project parameters as plans
continue to be refined; future prices of gold; possible variations in grade or
recovery rates; failure of equipment or processes to operate as anticipated;
labour disputes and other risks of the mining industry; delays in obtaining
governmental approvals or financing or in the completion of exploration, as well
as those factors disclosed in Atacama Pacific's publicly filed documents.
Although Atacama Pacific has attempted to identify important factors that could
cause actual actions, events or results to differ materially from those
described in forward-looking statements, there may be other factors that cause
actions, events or results not to be as anticipated, estimated or intended.
There can be no assurance that forward-looking statements will prove to be
accurate, as actual results and future events could differ materially from those
anticipated in such statements. Accordingly, readers should not place undue
reliance on forward-looking statements.


To view the table associated with this press release, please visit the following
link: http://media3.marketwire.com/docs/AtacamaTable1.pdf. 


To view the figure associated with this press release, please visit the
following link: http://media3.marketwire.com/docs/AtacamaMap1.pdf.


1 Year Atacama Pacific Gold Corporation Chart

1 Year Atacama Pacific Gold Corporation Chart

1 Month Atacama Pacific Gold Corporation Chart

1 Month Atacama Pacific Gold Corporation Chart