ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

ATM Atacama Pacific Gold Corporation

0.00
0.00 (0.00%)
Share Name Share Symbol Market Type
Atacama Pacific Gold Corporation TSXV:ATM TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0 -

Atacama Pacific Completes Phase IV Exploration Campaign On The Cerro Maricunga Oxide Gold Project, Chile

18/06/2013 10:00pm

Marketwired Canada


Editors Note: There is a figure associated with this press release.

Atacama Pacific Gold Corporation (TSX VENTURE:ATM) ("Atacama Pacific") is
pleased to report the final results from its 27,000-metre Phase IV drill program
on the Cerro Maricunga oxide gold project. Highlights from the final set of
drill results include:




--  78 metres grading 0.80 grams per tonne gold ("g/t Au") including 1.17
    g/t Au over 22 metres from drill hole CMR-296; 
    
--  110 metres grading 0.57 g/t Au with 38 metres of 1.09 g/t Au in drill
    hole CMD-298; and, 
    
--  184 metres grading 0.43 g/t Au from drill hole CMR-322. 



Atacama Pacific's Cerro Maricunga project is located in Chile's Maricunga
Mineral Belt approximately 120 kilometres from the city of Copiapo. Table 1
provides a summary of the current results and Figure 1 presents the location of
the drill holes.


"The results from the Phase IV infill drilling campaign have confirmed that the
Cerro Maricunga property hosts one of the largest oxide gold deposits recently
discovered," stated Carl Hansen, President and CEO of Atacama Pacific. "The goal
of the Phase IV campaign was to convert existing inferred resources to the
measure and indicated category and we are looking forward to providing an
updated resource estimate during the third quarter of 2013. With the completion
of this program, Atacama Pacific has drilled over 100,000 metres at Cerro
Maricunga project over a period of three years. It is anticipated that, going
forward, only minor drilling for infill and geotechnical purposes will be
required."


Drilling on section 950 NW successfully outlined further gold mineralization in
the area between the Crux and Phoenix zones previously interpreted as
unmineralized. Three drill holes, CMR-308, CMR-323 and CMR 325, returned
significant intervals of +0.2 g/t Au mineralization (see table 1), including 140
metres grading 0.32 g/t Au, following up on mineralization discovered in holes
CMR-241 (44 m grading 0.47 g/t Au) and CMR-239 (62 m grading 0.33 g/t Au)
drilled on section 900 NW.


Water Exploration Joint Venture 

Atacama Pacific recently entered into a 50:50 joint venture agreement with
Exeter Resources Corporation to explore for aquifer water within three
concessions located approximately seventy kilometres east of Atacama Pacific's
Cerro Maricunga deposit. Each company will own a 50% interest in each water
tenement and will incur 50% of the costs associated with exploration. Two of the
concessions have recently been granted while approval for the third concession
is pending. It is anticipated that exploration work will begin during the fourth
quarter of 2013.




Table 1 - Summary of Cerro Maricunga Drill Results (greater than or equal   
 to10 m intervals composited at a 0.2 g/t cut-off)                          
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Hole #    Section     From       To Interval    Grade    Zone          Notes
                  (metres) (metres) (metres) (g/t Au)                       
----------------------------------------------------------------------------
CMD-281       550       22       60       38     0.77    Crux               
----------------------------------------------------------------------------
                       110      140       30     1.12                       
----------------------------------------------------------------------------
CMD-282      2450        0       18       18     0.28    Lynx               
----------------------------------------------------------------------------
                        48       90       42     0.69                       
----------------------------------------------------------------------------
                       124      142       18     0.28                       
----------------------------------------------------------------------------
                       168      180       12     0.36                       
----------------------------------------------------------------------------
                       244      270       26     0.57                       
----------------------------------------------------------------------------
CMD-284B     1950       70       84       14     0.33    Lynx Infill between
                                                              Lynx & Phoenix
                                                                       zones
----------------------------------------------------------------------------
                       104      134       30     0.34                       
----------------------------------------------------------------------------
                       232      258       26     0.29                       
----------------------------------------------------------------------------
CMD-287      2000        0       60       60     0.65    Lynx         Infill
----------------------------------------------------------------------------
                        92      150       58     0.62                       
----------------------------------------------------------------------------
                       170      200       30     0.28                       
----------------------------------------------------------------------------
CMC-293      1450      366      378       12     0.22 Phoenix        Extends
                                                              mineralization
                                                                to bottom of
----------------------------------------------------------------------------
                       384      394       10     0.32           proposed pit
----------------------------------------------------------------------------
                       412      450       38     0.45                       
----------------------------------------------------------------------------
CMR-296      2250      124      202       78     0.80    Lynx         Infill
----------------------------------------------------------------------------
including              144      166       22     1.17                       
----------------------------------------------------------------------------
                       234      256       22     0.23                       
----------------------------------------------------------------------------
                       264      274       10     0.36                       
----------------------------------------------------------------------------
CMR-297       550        6       16       10     0.26    Crux        Infill,
                                                                    expanded
                                                              mineralization
                                                                       along
----------------------------------------------------------------------------
                        34       46       12     0.26                 the SW
                                                               contact. Also
                                                              cut by CMR-322
----------------------------------------------------------------------------
                        66      220      154     0.46                       
----------------------------------------------------------------------------
CMD-298      1650        6       18       12     0.34 Phoenix          Depth
                                                                extension to
                                                                     base of
                                                                    proposed
----------------------------------------------------------------------------
                        72      104       32     0.34                    pit
----------------------------------------------------------------------------
                       274      384      110     0.57                       
----------------------------------------------------------------------------
including              334      372       38     1.09                       
----------------------------------------------------------------------------
                       408      456       48     0.29                       
----------------------------------------------------------------------------
CMR-300      1000        0       48       48     0.23  Pollux   Extension of
                                                                   Pollux to
                                                                     Phoenix
----------------------------------------------------------------------------
                        82      128       46     0.40                       
----------------------------------------------------------------------------
CMR-301      1100       20       58       38     0.33 Phoenix   SE Extension
                                                                  of Phoenix
----------------------------------------------------------------------------
                       104      130       26     0.22                       
----------------------------------------------------------------------------
CMR-302      1800       76      124       48     0.38 Phoenix               
----------------------------------------------------------------------------
CMR-304      2000      170      200       30     0.37    Lynx               
----------------------------------------------------------------------------
CMR-306      1750        0       14       14     0.54 Phoenix               
----------------------------------------------------------------------------
                        34       48       14     0.23                       
----------------------------------------------------------------------------
                       156      188       32     0.54                       
----------------------------------------------------------------------------
                       230      298       68     0.35                       
----------------------------------------------------------------------------
CMR-308       950       68      118       50     0.36  Pollux   SE extension
                                                               Phoenix (new)
----------------------------------------------------------------------------
CMR-309       800        4       54       50     0.43    Crux               
----------------------------------------------------------------------------
                       176      224       48     0.41                       
----------------------------------------------------------------------------
                       258      300       42     0.54                       
----------------------------------------------------------------------------
CMR-310       650        4       32       28     0.36    Crux               
----------------------------------------------------------------------------
                        48       60       12     0.29                       
----------------------------------------------------------------------------
                        68       78       10     0.27                       
----------------------------------------------------------------------------
CMR-311       850       66       76       10     0.25    Crux     SW contact
----------------------------------------------------------------------------
                        96      154       58     0.28                       
----------------------------------------------------------------------------
CMR-312       800      108      150       42     0.36    Crux               
----------------------------------------------------------------------------
CMR-322       550       76       90       14     0.45    Crux               
----------------------------------------------------------------------------
                       128      312      184     0.43          0.18 g/t cut-
                                                                         off
----------------------------------------------------------------------------
CMR-323       950       22       82       60     0.27 Phoenix   SE extension
                                                               Phoenix (new)
----------------------------------------------------------------------------
                       154      204       50     0.23                       
----------------------------------------------------------------------------
CMR-325       950        0      140      140     0.32 Phoenix   SE extension
                                                                  of Phoenix
                                                                       (new)
----------------------------------------------------------------------------
                       166      178       12     0.55                       
----------------------------------------------------------------------------
NOTES: Unless otherwise noted, reported gold grades are composited at a 0.2 
 g/t Au cut-off. All intervals represent down-hole lengths and not true     
 widths. Drill holes prefixed "CMD" are diamond drill holes; holes prefixed 
 "CMR" are RC drill holes. Hole CMC-293, was drilled by both RC and diamond 
 methods.                                                                   



Santa Teresa Drilling

Atacama Pacific completed three reverse circulation drill holes (1,450 m)
targeting a strong chargeability anomaly identified on the Santa Teresa property
located adjacent to the northern border of the Cerro Maricunga property. The
results from the drilling were not economically significant and, as such,
Atacama Pacific has terminated the Santa Teresa option.


National Instrument 43-101

Michael Easdon, a professional geologist registered with the American Institute
of Professional Geologists, is the independent qualified person for the current
exploration program and has reviewed, approved and verified the content of this
press release. Carlos Guzman, a mining engineer, Fellow of the Australasian
Institute of Mining and Metallurgy and a registered member of the Chilean Mining
Commission, is the independent qualified person as defined by National
Instrument 43-101 for the January 28, 2013 Preliminary Economic Assessment for
the Cerro Maricunga project. Mr. Guzman is a Principal and Project Director with
NCL Ingeneiria y Construccion Ltda., Santiago, Chile.  


Visit Atacama Pacific's website at www.atacamapacific.com.

FORWARD-LOOKING STATEMENTS

This news release contains forward-looking statements, including predictions,
projections and forecasts. Forward-looking statements include, but are not
limited to the success of exploration activities generally, mine development
prospects, and potential future gold production. Often, but not always,
forward-looking statements can be identified by the use of words such as
"plans", "planning", "expects" or "does not expect", "continues", "scheduled",
"estimates", "forecasts", "intends", "potential", "anticipates", "does not
anticipate", or "belief", or describes a "goal", or variation of such words and
phrases or state that certain actions, events or results "may", "could",
"would", "might" or "will" be taken, occur or be achieved. 


Forward-looking statements involve known and unknown risks, future events,
conditions, uncertainties and other factors which may cause the actual results,
performance or achievements to be materially different from any future results,
prediction, projection, forecast, performance or achievements expressed or
implied by the forward-looking statements. Such factors include, among others,
the results of due diligence activities, changes in economic parameters and
assumptions, the interpretation and actual results of current exploration
activities; changes in project parameters as plans continue to be refined; the
results of regulatory and permitting processes; future prices of gold; possible
variations in grade or recovery rates; failure of equipment or processes to
operate as anticipated; labour disputes and other risks of the mining industry;
the results of further economic and technical studies, delays in obtaining
governmental approvals or financing or in the completion of exploration, as well
as those factors disclosed in Atacama Pacific's publicly filed documents.


Although Atacama Pacific has attempted to identify important factors that could
cause actual actions, events or results to differ materially from those
described in forward-looking statements, there may be other factors that cause
actions, events or results not to be as anticipated, estimated or intended.
There can be no assurance that forward-looking statements will prove to be
accurate, as actual results and future events could differ materially from those
anticipated in such statements. Accordingly, readers should not place undue
reliance on forward-looking statements.


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that
term is defined in the policies of the TSX Venture Exchange) accepts
responsibility for the adequacy or accuracy of this release.


To view the figure associated with this press release, please visit the
following link: http://www.marketwire.com/library/20130618-ATMfigLG.png.


FOR FURTHER INFORMATION PLEASE CONTACT: 
Atacama Pacific Gold Corporation
Carl B. Hansen
President and CEO
416 861 8267
info@atacamapacific.com
www.atacamapacific.com

1 Year Atacama Pacific Gold Corporation Chart

1 Year Atacama Pacific Gold Corporation Chart

1 Month Atacama Pacific Gold Corporation Chart

1 Month Atacama Pacific Gold Corporation Chart

Your Recent History

Delayed Upgrade Clock