Anglo Aluminum Corp. (TSXV:ALU)
Historical Stock Chart
From Jun 2019 to Jun 2024
KAMLOOPS, BC, Dec. 22 /CNW/ --
TSX-V:ALU
KAMLOOPS, BC, Dec. 22 /CNW/ - Anglo Aluminum Corp. (TSX-V:ALU) announces
that it has filed with regulatory authorities an independent technical
report dated December 15, 2010, on the Koba and Koumbia Bauxite
Projects, located in Guinea, West Africa, prepared by Coffey Mining
Limited (the "Coffey Technical Report").
Further detail with respect to the Coffey Technical Report is included
in Anglo Aluminum's news release dated November 4, 2010, and the full
text of the Coffey Technical Report is available for viewing under
Anglo Aluminum's profile on SEDAR at www.sedar.com.
Iain Macfarlane, BSc (Hons) App Geo, MAusIMM, Associate Consultant -
Resources, and N. Ingvar Kirchner, BSc (Hons) Geol, MAusIMM, Manager
Resource Geology, Perth, Western Australia, both with the firm of
Coffey Mining Limited, West Perth, Australia, are the Qualified Persons
responsible for preparation of the Coffey Technical Report. The authors
have consented to the filing of the Coffey Technical Report and to the
disclosure by Anglo Aluminum in its news releases with respect to the
Coffey Technical Report.
Anglo Aluminum has the right to earn a 100% interest in the Koba and
Koumbia permits, which cover 532 square kilometres in the Télimélé and
Gaoual prefectures of Guinea. These permit areas are located in the
Boke Bauxite Belt, which hosts the world's largest and highest-quality
bauxite deposits being mined by several of the world's major aluminum
producers.
On behalf of the Board of Directors
Anglo Aluminum Corp.
James T. Gillis, President & CEO
This news release contains certain statements that may be deemed
"forward-looking" statements. Forward looking statements are statements
that are not historical facts and are generally, but not always,
identified by the words "expects", "plans", "anticipates", "believes",
"intends", "estimates", "projects", "potential" and similar
expressions, or that events or conditions "will", "would", "may",
"could" or "should" occur. Although we believe the expectations
expressed in such forward-looking statements are based on reasonable
assumptions, such statements are not guarantees of future performance
and actual results may differ materially from those in forward looking
statements. Forward looking statements are based on the beliefs,
estimates and opinions of our management on the date the statements are
made. Anglo Aluminum Corp. undertakes no obligation to update these
forward-looking statements in the event that management's beliefs,
estimates or opinions, or other factors, should change, except as
required by law.
Neither the TSX Venture Exchange nor its Regulation Services Provider
(as that term is defined in the policies of the TSX Venture Exchange)
accepts responsibility for the adequacy or accuracy of this news
release.
To view this news release in HTML formatting, please use the following URL: http://www.newswire.ca/en/releases/archive/December2010/23/c7784.html
pon Anglo Aluminum Corp. and the Koba and Koumbia Bauxite Projects, please visit: a href="http://www.angloaluminum.com" font-style="italic"www.angloaluminum.com/a./p