ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

CAD Cadogan Energy Solutions Plc

2.25
0.00 (0.00%)
26 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Cadogan Energy Solutions Plc LSE:CAD London Ordinary Share GB00B12WC938 ORD 3P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 2.25 2.00 2.50 2.25 2.25 2.25 0.00 08:00:14
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Drilling Oil And Gas Wells 8.47M -1.56M -0.0064 -3.52 5.49M

Cadogan Petroleum Operations Update

13/01/2015 7:00am

UK Regulatory



 
TIDMCAD 
 
CADOGAN PETROLEUM PLC 
 
                               Operations Update 
 
Deb 15 well located in the Debeslavetska Exploration licence spudded-in on 28th 
November 2014 and drilling down to 404m was completed on 26th December 2014. 
The main targets in this unexplored area were initially the productive levels 
in the Badenian sequence (levels from B1 to B4) and possible sandy levels in 
the Cretaceous. The trapping mechanism in the Badenian is mainly stratigraphic, 
potentially in combination with structural pinching out forms, where sand 
levels are encompassed in a shale sequence. 
 
Analysis continues but so far the results suggest that the level B1, where the 
biggest DHI and AVO anomaly was highlighted, was not encountered due to the 
sub-optimal well surface location (driven by logistics due to temporary 
moratorium on industrial uses of agricultural areas), while B2 was found 
reduced and truncated against the erosional channel surface running in the 
northern part of the field, probably just in opposition to the Cretaceous 
limestone. The B3, B4 and B5 intervals were found to be overlapping with 
water-bearing Cretaceous limestone, encountered earlier than forecast. 
 
The target levels of B2 and B3 were found to be water saturated due to the 
missing seal of the truncated levels against the water-bearing Cretaceous 
formation. However our analysis suggests that a new partially gas saturated 
interval, detected by logs and encompassed in levels B4 and B5, could be 
prospective in the upper structural position. Results logged during drilling 
showed a reasonable gas saturation with a reasonably large interval of gas 
shows. However, in spite of the positive evidence of hydrocarbons, the test 
result was water. Further investigation and a detailed interpretation of this 
channel in the up-deep direction is required. From the collected water sample, 
water salinity was found to be very low and therefore impacting on the water 
saturation computation. Bearing these results in mind, the Company has 
therefore decided to plug and abandon the Deb 15 well. 
 
Despite the disappointing results, the Company's positive view of the Deb 
exploration area potential remains unchanged. Additional information however is 
required for refined planning of future drilling in the Debeslavetska License. 
 
The Company also notes that the Ukrainian government has passed an amendment to 
the Tax Code of Ukraine that, among other things, has extended certain changes 
in the production tax rates for hydrocarbons that were originally implemented 
to apply from 1st August to 31st December 2014 as a temporary measure. Wells 
producing from horizons at depths of 5,000 metres or shallower were, and will 
now continue to be, subject to production tax rate of 55% and 45% on natural 
gas and oil/liquids respectively. Wells producing from horizons deeper than 
5,000 metres were, and will now continue to be, subject to rates of 28% on gas 
and 21% on oil/liquids. 
 
The original amendment to production tax rates also included a coefficient of 
0.55 to be applied against the production tax rate for wells put on stream 
after 1st August 2014, for the first two years of production. The latest 
amendment to the Tax Code of Ukraine does not include this coefficient and the 
Company awaits clarification as to whether the coefficient continues to apply. 
 
 
Enquiries: 
 
Cadogan Petroleum Plc                                    +380 (44) 591 0390 
Bertrand des Pallieres    Chief Executive Officer 
Laurence Sudwarts         Company Secretary 
 
Cantor Fitzgerald Europe                                 +44 (0)20 7894 7000 
David Porter 
Richard Redmayne 
 
 
END 
 

1 Year Cadogan Energy Solutions Chart

1 Year Cadogan Energy Solutions Chart

1 Month Cadogan Energy Solutions Chart

1 Month Cadogan Energy Solutions Chart

Your Recent History

Delayed Upgrade Clock