ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

TLOU Tlou Energy Limited

2.05
0.00 (0.00%)
03 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Tlou Energy Limited LSE:TLOU London Ordinary Share AU000000TOU2 ORD NPV (DI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 2.05 2.00 2.10 2.05 2.05 2.05 502,442 08:00:01
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Leather Tanning & Finishing 0 -4.24M -0.0039 -10.26 43.06M
Tlou Energy Limited is listed in the Leather Tanning & Finishing sector of the London Stock Exchange with ticker TLOU. The last closing price for Tlou Energy was 2.05p. Over the last year, Tlou Energy shares have traded in a share price range of 1.35p to 2.50p.

Tlou Energy currently has 1,076,536,717 shares in issue. The market capitalisation of Tlou Energy is £43.06 million. Tlou Energy has a price to earnings ratio (PE ratio) of -10.26.

Tlou Energy Share Discussion Threads

Showing 7051 to 7071 of 9800 messages
Chat Pages: Latest  284  283  282  281  280  279  278  277  276  275  274  273  Older
DateSubjectAuthorDiscuss
21/3/2019
20:07
Nah, tomoro will come and go and not a word will be spoke. Just like the last 1, 2, almost 3 years since CBM was gazetted by Parliament. An already slow process is moving even slower thanks to politics being the main game in town currently.

Khamexit is their equivalent of Brexit. And he hasn’t yet started to negotiate his ‘deal’, so that has a ways to run as well. Early April for the Kang Congress - we won’t hear until at least 2 weeks after that. Probably longer....

donkey40
21/3/2019
19:36
Big day tomorrow. Disappointed that some think I'm related to donkey. Very big.
liartidd
21/3/2019
11:03
Why are you talking to yourself?

We all know you are one in the same.

Get help.

wheniamfree
21/3/2019
08:35
Don’t be stupid LiarTidd. It has always been a one horse race. In the bag. Throw the dog a bone. Blue sky ahead time.
donkey40
21/3/2019
08:19
Smell a big rat here. Not having it we put the application in wrong. TG is to smart for that. I think somebody in the gov was giving the opposition time to get a bid together. TG was very diplomatic about it on YouTube smart. Here's hoping but that smell is pretty strong.
liartidd
20/3/2019
17:21
You think what you like lad.
coley15
20/3/2019
16:22
I see we have a comedian on this board. I'd like to think of you more as D/H.
liartidd
20/3/2019
15:11
No. Jog on
coley15
20/3/2019
15:00
Has liartidd and buzzy change their names on lse?If so can somebody tell me the new names please. I would like to monitor that pair of low life's. Thanks
liartidd
20/3/2019
14:05
Boom upwards we go
money4me
20/3/2019
13:54
I think you should enter Mastermind Windy, and I can be your specialist subject. You would do really really well since your research on me is as impeccable as your research on Tlou.

Even my wife is warming to you since you like paying her special attention. Keep up the good work!!

donkey40
19/3/2019
23:54
How very kind of you. Yup very chirpy these days, thanks. For a variety of reasons; none of which you and your mates are astute enough to fathom. GLTA and most importantly of all, remember DYOR !!
donkey40
19/3/2019
22:10
Donkey, are you happy with life pal? You always seem so down and miserable. Feel for you, really I do
mgellie
19/3/2019
18:12
Have we not been watching it for over 3 years .... I love the way Tony reassured everyone that the Financials will be ok - at the Govt price for electricity. Is that the ex-gate Morupule price, which runs at a substantial loss. Or the price paid to purchase from SA, which is higher again? Electricity is massively subsidised in Bots, but hey let’s gloss over that for now since all that matters is getting an award for ‘up to 10mw’, pull in $15m Capex, build and power up. Easy !!
donkey40
19/3/2019
10:16
A good catch up this morning with Tony at Tlou .... a busy Q2 ahead
*VIDEO - TONY GILBY*
#TLOU @TlouEnergy

Q2 'the one to watch' for Tlou Energy as it approaches key milestones

ftangftang
19/3/2019
09:51
Windy - I am sure you are reading Lekka posts on LSE about the 2015 tender for Orapa gas conversion.
Remember when you and your chums accused me of lying about Orapa? So if I was lying now then, I assume you will challenge Lekka now and put the record straight. (I can post a copy of who said what back in 2017....just in case you have short term memory loss)

donkey40
18/3/2019
18:05
Strong gas indications were observed while drilling;
Initial water flow is similarly very encouraging;
Drilling program carried out efficiently and safely as a result of the excellent work of the field personnel;
Intersected a grassier trend based on an extensive geological review of ....;
It is a significant achievement to ... drill using own equipment...;
Very importantly... a significant amount of gas was observed bubbling from the production wells;
This may be very significant for future drilling campaigns and .... may provide the key to unlocking significant amounts of new gas reserves;
Furthermore the good initial water flow .... is potentially indicative of good permeability and therefore potentially good gas flows in this geologically high-graded area;

And then the sentence that matters:

The wells will continue to de-water over the coming weeks with first indications of controlled gas pressure increasing anticipated in 2Q19.

All the preamble of could, would, may, potentially, is the usual disingenuity they try to spin in every utterance.

donkey40
18/3/2019
08:33
Progress appears to be fine. But no real value to be added yet. We need the tender agreed and gas upgrade so we can see where money is going to be made
money4me
18/3/2019
06:43
Thanks ftang for sharing. Early insite into the RNS from ASX.

Donkeys response - classic as ever “I don’t have an agenda, honest!”

wheniamfree
18/3/2019
02:06
Hahaha Buzz / Ftang / Stubble
Who do you think u r kidding ...
Are you really suggesting, after 2 years of pumping, that we should believe the tosh you just posted, we should believe you.
Man that is sooo lame and sooo sad!!

But good to know I am on semi-filter.

You useless waste of space !!!!

donkey40
18/3/2019
00:18
Tlou Energy Limited, the ASX, AIM and BSE listed company focused on delivering power in Botswana
and southern Africa through the development of coal bed methane (“CBM”) is pleased to provide an
update on the status of field operations at the Lesedi CBM Project (“Lesedi”;) in Botswana.

Highlights
 The two development pods (comprising three wells in each pod) have been completed and are
de‐watering prior to controlled gas being produced;
 Strong gas indications were observed while drilling and initial water flow is similarly very
encouraging;
 All wells in the current program have now been drilled with expenditure to date in line with
budget.

Field Operations
Tlou Energy has drilled all six wells which comprise the Lesedi 3 and Lesedi 4 development pods (each
pod comprising one vertical production well and two lateral wells) as part of the recent field drilling
program. The drilling program was carried out efficiently and safely as a result of the excellent work of
the field personnel. The Lesedi 3 and 4 development pods are located adjacent to the Company’s
proposed central gas gathering and power generation facility. This is in a geological region that has
intersected a gassier trend based on an extensive geological review of the sub‐surface using all
available geological and production data to date.*
Prior to starting the program, the Company purchased a significant amount of drilling equipment
which enabled Tlou to control costs and timing of the program. The net result is that the drilling
program was completed on time and in line with budget. This is a significant achievement and
demonstrates the Company’s ability to deliver a cost effective and timely program in the Kalahari
Desert.
Very importantly, when the lateral wells intersected the vertical production wells, a significant amount
of gas was observed bubbling from the production wells. This occurred on both the Lesedi 3P and 4P
intersects but particularly on Lesedi 4P. In the Lesedi 4 development pod, the Company targeted the
upper portion of the coal seam. This may be very significant for future drilling campaigns and, when
combined with recently evaluated structural trends, may provide the key to unlocking significant
amounts of new gas reserves.

Tony Gilby, Tlou’s Managing Director, said “I am very encouraged by the recently completed drilling
program and in particular the strong gas indications observed to date. Furthermore, the good initial
water flow, which is higher than that previously observed at Selemo, is potentially indicative of good
permeability and therefore potentially good gas flows in this geologically high‐graded area.
Completing the wells in a timely manner and on budget was a great effort by the field staff and they
are to be commended for their achievements.”
The wells will continue to de‐water over the coming weeks with first indications of controlled gas
pressure increasing anticipated in 2Q19.

ftangftang
Chat Pages: Latest  284  283  282  281  280  279  278  277  276  275  274  273  Older

Your Recent History

Delayed Upgrade Clock