We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Synergia Energy Ltd | LSE:SYN | London | Ordinary Share | AU0000233538 | ORD NPV |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.005 | 4.55% | 0.115 | 0.11 | 0.12 | 0.115 | 0.11 | 0.11 | 32,328,403 | 15:45:32 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
Crude Petroleum & Natural Gs | 1.3M | -5.38M | -0.0006 | -1.83 | 9.26M |
Date | Subject | Author | Discuss |
---|---|---|---|
08/8/2022 18:43 | 0.5 mmscfd isn't a lot but this is only the rate from un unfrac'd part of the existing horizontal so much better rates from the complete well bore could be expected. | unabkxb | |
08/8/2022 18:06 | Excerpt from RNS tells the full story. Flow still unknown. The gas production rate is up to 0.5 mmscfd but the sustainable gas rate will not be known until substantially most of the frac fluid has been removed. | steveberyl | |
08/8/2022 17:58 | Sorry fracking results | bigpecs | |
08/8/2022 17:58 | Hopefully after the fracking it will be a gusher | bigpecs | |
08/8/2022 17:47 | 0.5mmcfd is poor they were expecting 2mmcfd. | neo26 | |
08/8/2022 15:44 | Yep little top upFor me at these cheap prices | bigpecs | |
08/8/2022 15:44 | Top up time. All good | neversatisfied | |
08/8/2022 15:41 | What are you talking about? | ashleyjv | |
08/8/2022 15:35 | Company confirmed that we can only remove 60% of the fluid | 1sajad | |
08/8/2022 15:17 | 50% of the frack fluid had been recovered so I believe another 25% to still be recovered as usually up to 75% is recovered as flow back, forgive me if I'm wrong but that's how I've read it GLA | bigpecs | |
08/8/2022 14:56 | Joint venture or even a buyout buy a major player would do us | bigpecs | |
08/8/2022 14:48 | MMs fishing for stock | cool hand kev | |
08/8/2022 14:47 | We are only remove 60% of the frac fluid that was injected so only another 10% of frac fluid to be removed | 1sajad | |
08/8/2022 14:37 | Fantastic rns in my opinion ... if we get a good flow rate then subject to funding bobs your uncle we all get rich lol .... Or maybe sell it all to a bigger company and pay us that 4p a share... happy days GLA it's slowly coming together ... hold tight | bigpecs | |
08/8/2022 14:30 | C-77H Re-frac Operations Update The C-77H well on the onshore Cambay gasfield (100% Synergia) has been tied-in to the C-73 production facility in order to facilitate the sale of the produced gas to the grid. The well is still flowing back the frac fluid with approximately 50% of the expected flow back having been removed. The gas production rate is up to 0.5 mmscfd but the sustainable gas rate will not be known until substantially most of the frac fluid has been removed. Initial indications are that the revised fraccing methodology employed on the C-77H re-frac operation has been effective and could underpin a full field development, subject to funding, once the decline rates have been determined to be satisfactory. | ashleyjv | |
08/8/2022 11:53 | Hopefully the news we want to hear this week. A high sustained flow of gas. GLA the re-rate is coming. | neversatisfied | |
05/8/2022 11:11 | They need to pump the Gas not the stock! | rawv8 | |
04/8/2022 15:48 | That would be amazing | bigpecs | |
04/8/2022 15:32 | You never know though may be longer but hopefully not. As long as flow rate is humongous who cares ? | neversatisfied | |
04/8/2022 15:28 | Roland expects a Market cap of 300-400 million which equates a share price of 4p approx. Once the wells are flowing | cool hand kev | |
04/8/2022 13:17 | Just looking at the basics of this whole scheme, if SYN can replace Russian Gas Supply to India and maybe have a couple of Ship loads liquid Gas for UK on a regular basis. The outlook is simply astonishing. Shipping infrastructure does appear to be in place already. | steveberyl | |
04/8/2022 12:44 | Thanks just checked your right | bigpecs | |
04/8/2022 12:36 | Ok even better thank you...but originally it stated 30 to 40 days however your time scale is much better GLA | bigpecs | |
04/8/2022 11:29 | From the rns - The sustainable gas flow rates and long-term decline rates will not be known until the well has been cleaned up and flow rates stabilise. This may take 10-20 days." | neversatisfied |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions