ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

IKA Ilika Plc

30.50
0.50 (1.67%)
26 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Ilika Plc LSE:IKA London Ordinary Share GB00B608Z994 ORD 1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.50 1.67% 30.50 29.00 32.00 31.25 29.50 30.00 954,686 08:31:15
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Coml Physical, Biologcl Resh 702k -7.3M -0.0459 -6.64 48.49M

Ilika plc Goliath Scale-up Update (1690K)

04/05/2022 7:00am

UK Regulatory


Ilika (LSE:IKA)
Historical Stock Chart


From Apr 2022 to Apr 2024

Click Here for more Ilika Charts.

TIDMIKA

RNS Number : 1690K

Ilika plc

04 May 2022

Ilika plc

("Ilika" or the "Company")

Goliath Scale-up Update

Scale-up plans validated - highlighting cost-saving benefits at higher volume production levels

Ilika (AIM: IKA), a pioneer in solid-state battery technology, announces the successful conclusion of its scale-up study, SOLSTICE, with partner Comau, part of Stellantis, and a world leader in the industrial automation field. The study reviewed Ilika's existing Goliath pre pilot line and delivered a plant design for a Goliath manufacturing line at a mega-scale facility (the "Project"). As reported by the company on 6th April 2021, the 12-month Project was supported by the Advanced Propulsion Centre (APC) and Ilika received a GBP276,000 grant towards costs related to the Project.

The Project had two objectives, firstly a review and subsequent validation of Ilika's internal plan to scale up its facility from a production capacity of 50kWh per year to 2MWh per year. Following on from the review, Ilika has a detailed facility and equipment plan and has entered into discussions with equipment vendors, with the first long lead time equipment orders expected to be placed in Q2 2022. Ilika's 2MWh scale up will deliver and commission a fully operational facility by Q4 2023. In the meantime, the development of Ilika's Goliath solid-state battery technology continues in accordance with the Company's technology roadmap.

The second objective of the Project was an initial review of Ilika's defined manufacturing process to assess its suitability for megawatt scale up. The Project concluded there were no cost or technical barriers to scale up, and indeed important manufacturing benefits were identified, such as an accelerated formation stage relative to traditional lithium-ion, which has the potential to significantly reduce formation times. Comau has produced a high-level costed plant design for the megawatt scale solid-state manufacturing line which will be further refined in future planned collaborations.

Automotive Transformation Director at the APC, Julian Hetherington said: "The UK has a long legacy of automotive manufacturing success and the industry now needs to scale up, at pace, to net-zero emission technologies. We are delighted that the funding awarded to Ilika and Comau through the Automotive Transformation Fund has successfully supported collaborative product and manufacturing process development that can unlock routes to subsequent investment in scaled- up facilities."

John Coombes, managing Director of Comau UK stated: "This project represented an integral part of the Comau Journey in Electrification, developed with the contribution of the internal Battery Cells Global Competence Center. We are proud of the collaboration we have had with Ilika and the APC, and also the ability to demonstrate the value our capabilities can contribute in this field. "

Graeme Purdy, Ilika CEO, stated: "This project has successfully validated Ilika's scale-up plans for its Goliath technology, highlighting some important cost-saving benefits at higher volume production levels which pave the way to gigawatt scale manufacturing. Working with Comau, one of the world's leading designers of innovative engineering solutions, has delivered a robust plan to scale-up Ilika's manufacturing capability for Goliath solid-state batteries to the next level."

For more information contact:

 
 Ilika plc 
  Graeme Purdy, Chief Executive 
  Steve Boydell, Finance Director                            +44 (0)23 8011 1400 
 
 Liberum Capital Limited 
  Andrew Godber, Cameron Duncan, 
  William Hall, Nikhil Varghese                             +44 (0) 20 3100 2000 
 
 Berenberg (Joint Broker) 
  Emily Morris, Detlir Elezi, 
  Milo Bonser, Mara Grasso                                  +44 (0) 20 3207 8700 
 
 Walbrook PR Ltd                     +44 (0)20 7933 8780 or ilika@walbrookpr.com 
 Lianne Applegarth                                      Mob: +44 (0)7584 391 303 
 Nick Rome                                              Mob: +44 (0)7748 325 236 
 Tom Cooper                                             Mob: +44 (0)7971 221 972 
 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

MSCBKNBNPBKDKPK

(END) Dow Jones Newswires

May 04, 2022 02:00 ET (06:00 GMT)

1 Year Ilika Chart

1 Year Ilika Chart

1 Month Ilika Chart

1 Month Ilika Chart

Your Recent History

Delayed Upgrade Clock