We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Enwell Energy Plc | LSE:ENW | London | Ordinary Share | GB0031775819 | ORD 5P |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.725 | 3.96% | 19.05 | 18.50 | 19.60 | 19.50 | 18.50 | 18.50 | 124,812 | 16:35:01 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
Crude Petroleum & Natural Gs | 133.38M | 60.18M | 0.1877 | 1.04 | 62.52M |
TIDMRPT
RNS Number : 4351B
Regal Petroleum PLC
04 April 2017
4 April 2017
Regal Petroleum plc
("Regal" or the "Company")
Ukraine Update
Regal Petroleum plc (AIM: RPT), the AIM-quoted oil and gas exploration and production group, announces an update of its operational activities at its Ukrainian gas and condensate fields, which comprise the Mekhediviska-Golotvshinska (MEX-GOL) and Svyrydivske (SV) fields, and the Vasyschevskoye (VAS) field, all of which are 100% owned and operated.
Average gas, condensate and LPG production from the MEX-GOL and SV fields for the period from 1 January 2017 to 31 March 2017 was 131,025 m(3) /d of gas, 33 m(3) /d of condensate and 17 m(3) /d of LPG (1,100 boepd in aggregate).
Average gas and condensate production from the VAS field for period from 1 January 2017 to 31 March 2017 was 86,890 m(3) /d of gas and 6.7 m(3) /d of condensate (613 boepd in aggregate).
The MEX-109 infill well, located in the MEX-GOL field, has been drilled, to a depth of 4,873metres, and is now being logged, cased and prepared for completion. The well had an original target depth of 5,250 metres but, due to some technical issues, further drilling activities were curtailed once the primary reservoir targets were accessible. The well was spudded in July 2016 and targeted Visean reservoirs ("B-Sands"). It is anticipated that completion operations will be concluded by May 2017, and thereafter well testing will commence. Subject to successful testing, production hook-up will be completed by the end of the second quarter of 2017.
This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.
For further information, please contact:
Regal Petroleum plc Tel: 020 3427 3550 Keith Henry, Chairman Sergei Glazunov, Financial Director Strand Hanson Limited Tel: 020 7409 3494 Rory Murphy / Richard Tulloch Citigate Dewe Rogerson Tel: 020 7638 9571 Martin Jackson / Shabnam Bashir
Philip Frank, PhD Geology, Chartered Geologist, FGS, PESGB, consultant to the Company, has reviewed and approved the technical information contained within this press release in his capacity as a qualified person, as required under the AIM Rules.
Definitions boe barrels of oil equivalent boepd barrels of oil equivalent per day LPG liquefied petroleum gas m(3) cubic metres per day /d m(3) cubic metres % per cent
This information is provided by RNS
The company news service from the London Stock Exchange
END
MSCSSLFIDFWSEIL
(END) Dow Jones Newswires
April 04, 2017 02:00 ET (06:00 GMT)
1 Year Enwell Energy Chart |
1 Month Enwell Energy Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions