ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

AAZ Anglo Asian Mining Plc

67.00
3.40 (5.35%)
03 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Anglo Asian Mining Plc LSE:AAZ London Ordinary Share GB00B0C18177 ORD 1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  3.40 5.35% 67.00 67.00 70.00 69.50 63.50 63.50 271,461 16:35:01
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Miscellaneous Metal Ores,nec 84.72M 3.66M 0.0320 21.41 78.26M

Anglo Asian Mining PLC Interim Results and Maiden Dividend (1390B)

19/09/2018 7:00am

UK Regulatory


Anglo Asian Mining (LSE:AAZ)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Anglo Asian Mining Charts.

TIDMAAZ

RNS Number : 1390B

Anglo Asian Mining PLC

19 September 2018

Anglo Asian Mining plc / Ticker: AAZ / Index: AIM / Sector: Mining

19 September 2018

Anglo Asian Mining plc

Interim Results for the six-month period to 30 June 2018

Maiden dividend of US cents 3.00 per share

Anglo Asian Mining plc ("Anglo Asian" or the "Company"), the AIM listed gold, copper and silver producer in Azerbaijan, is pleased to announce its interim results for the six-month period ended 30 June 2018 ("H1 2018"). Note that all references to "$" and "cents" are to United States dollars and cents.

Together with these interim results for the six months ended 30 June 2018, the Company also announces its maiden dividend. This is an interim dividend in respect of the year ending 31 December 2018 of US cents 3.00 per share payable on 8 November 2018 to shareholders of record on 12 October 2018.

An updated corporate presentation on the Company's H1 2018 financial results will be available later today on the Anglo Asian web-site: http://www.angloasianmining.com.

Dividend

-- Maiden dividend declared of US cents 3.00 per share following move into a net cash position subsequent to 30 June 2018

Production Overview

-- Continued improvement in H1 2018 total production expressed as gold equivalent ounces ("GEOs") with a 22 per cent. year-on-year ("y-o-y") increase to 37,349 GEOs (H1 2017: 30,561 GEOs) due to mining from the new Ugur open-pit mine and the successful implementation of operational initiatives at the existing Gedabek open-pit and Gadir underground mines:

o Gold production totalled 33,255 ounces - 31,282 ounces contained within gold doré, 12 ounces from SART processing and 1,961 ounces from flotation (H1 2017: total 23,218 ounces)

o Copper production of 587 tonnes - 251 tonnes from SART processing and 336 tonnes from flotation (H1 2017: total 1,322 tonnes)

o Silver production totalled 84,785 ounces - 13,124 ounces contained within gold doré, 43,687 ounces from SART processing and 27,974 ounces from flotation (H1 2017: total 85,087 ounces)

-- Target production for the 12 months to 31 December 2018 remains at between 78,000 and 84,000 GEOs compared to FY 2017 actual total production of 71,461 GEOs

Sales Overview

   --    Increased sales of gold bullion offset by reduced sales of copper concentrate: 

o Gold bullion sales of 25,778 ounces at an average of $1,319 per ounce (H1 2017:

15,689 ounces at an average of $1,238 per ounce)

o Copper concentrate shipments to the customer totalled 2,344 dry metric tonnes ("dmt") with a sales value of $5.9 million (excluding Government of Azerbaijan production share) (H1 2017: 5,396 dmt with a sales value of $10.3 million)

Financial Overview

   --    The Company is currently in a net cash position 

-- Revenue increased to $40.0 million (H1 2017: $29.8 million) due to higher production and increases in average metal selling prices

-- All in sustaining cost ("AISC") of production per ounce of gold (including the Government of Azerbaijan's share) of $543 per ounce, a decrease of 4 per cent. compared to H1 2017 of $564 per ounce

-- Profit before taxation of $8.1 million (H1 2017: loss of $1.3 million) due to higher revenues, a lower AISC and reduced interest expense

   --    Cash generated from operations of $24.6 million (H1 2017: $10.8 million) 

-- Capital expenditure of $8.2 million (H1 2017: $3.4 million) mainly on deferred stripping ($4.9 million), the new crusher plant ($2.0 million) and underground mining equipment ($0.8 million)

   --    Free cash flow of $16.4 million (H1 2017: $7.4 million) 
   --    Net debt decreased to $2.9 million at 30 June 2018 (31 December 2017: $18.1 million) 
   --    Cash of $12.5 million at 30 June 2018 (31 December 2017: $2.5 million) 

Operational Overview

-- Updated JORC (2012) mineral resource for the Gedabek open pit published with over one million ounces of gold to provide further mine life of around five to six years

-- 3 year geological exploration programme identified further mineralisation at Gedabek with an airborne geophysical survey to be carried out over the entire Gedabek contract area

-- Ugur open-pit mine operated throughout H1 2018 producing 461,382 tonnes of ore grading 1.3 grammes per tonne of ore

-- Second crusher now in operation allowing independent operation of agitation leaching and flotation plants

-- Various initiatives underway at Gedabek to improve efficiency and working practices including recruitment of specialist managers and improvements to roads

CHAIRMAN'S STATEMENT

Review of 2018 to date

Due to an outstanding financial performance as the Company continues to successfully deliver its operational objectives, I am delighted to report the declaration of a maiden dividend to our shareholders of US cents 3.00 per share. This is both to reward our shareholders and to demonstrate the Board's confidence in the future.

The Company's operational performance has also been excellent with production growing due to mining from Ugur, our new open-pit mine, and the optimisation initiatives undertaken in 2017. Our three-year geological exploration programme, which commenced this year, is already giving insights into the further potential of the Company's contract areas and the significant upside offered by our targets. An updated JORC resource of over one million ounces of gold for the Gedabek open pit confirms a further mine life of five to six years. With this in mind, we continue to develop and enlarge our production facilities and the second crusher line, which is now in operation, has increased the Company's production capacity.

A total of 37,349 gold equivalent ounces ("GEOs") was produced during the period, a 22 per cent. year-on-year increase compared to 30,561 GEOs in 2017. Gold production in H1 2018 was 33,255 ounces compared to 23,218 ounces in H1 2017. However, this increase was offset by lower production of copper and silver. Copper production in H1 2018 was 587 tonnes compared to 1,322 tonnes in H1 2017 and silver production in H1 2018 of 84,785 ounces was marginally lower compared to 85,087 ounces in H1 2017. The higher gold production arose from increased gold doré production due to processing higher grade Ugur ores through the agitation leaching plant. However, Ugur ore does not contain copper, which reduced the amount of tailings feedstock to the flotation plant, resulting in lower copper and silver production.

Revenues in H1 2018 at $40.0 million were $10.2 million higher than in H1 2017. The higher revenues were due to both higher production and higher average metal selling prices. The average gold price in H1 2018 was $1,318 per ounce compared to $1,238 per ounce in H1 2017 and the average copper price in H1 2018 was $6,924 per metric tonne compared to $5,755 per metric tonne in H1 2017. Although there has been a decrease in the price of both gold and copper since the end of June 2018, the Company's low cost of production in the lower quartile of comparable companies ideally positions us to trade satisfactorily through periods of lower metal prices.

The Company continued to be subject to an effective royalty on its revenues in H1 2018 of 12.75 per cent. of the value of its production, and the basis of this royalty is explained in the financial review below. The Company will continue to be subject to this effective royalty of 12.75 per cent. until all its unrecovered costs for Gedabek are utilised. Unrecovered costs for Gedabek at 30 June 2018 totaled $83 million (30 December 2017: $95 million) and our current business plans indicated that these costs will not be fully recovered at the earliest until 2023, limiting the effective royalty to 12.75 per cent. during this period.

The Company's all in sustaining cost ("AISC") per ounce of gold produced reduced marginally to $543 per ounce in H1 2018 compared to $564 per ounce in H1 2017. The increased gold production in H1 2018 benefitted the AISC but this was offset by higher sustaining capital costs and lower by-product credits.

Cash from operating activities in H1 2018 increased to $24.6 million from $10.8 million in H1 2017 and net debt was reduced from $18.1 million at the end of 2017 to $2.9 million at 30 June 2018. The Company also refinanced $13.5 million of its debt in early 2018 with a two-year syndicated loan from banks primarily in Azerbaijan. This was a sign of the confidence that banks in Azerbaijan have in our business and the new loan substantially reduced our borrowing costs. It also increased cash availability by $8.4 million in 2018 by extending the repayment of debt principal into 2019. The new loan has no financial covenants and is unsecured. We were pleased to repay in full the loan from our Chief Executive, Reza Vaziri in March 2018 and I would like to thank him for his confidence and commitment to the Company which has proved to be amply justified. The Company also repaid certain other borrowings in early July 2018.

The Company continues to develop its processing facilities and a second crusher line commenced operation in July 2018. The new crusher, together with the already upgraded grinding circuit, removes a large processing bottleneck and enables the agitation leaching and flotation plants to operate independently at their individual design capacities. The second crusher also increases the flexibility of our processing plants.

Various operational initiatives were commenced at Gedabek during the period. They are more fully described in the strategic report below but include improvements in ore handling and improving transport logistics by building a new road between the main open-pit mine and processing plants. Additionally, the operational team at Gedabek has also been strengthened by the recruitment of highly experienced managers in several keys areas to improve working practices. More minor improvements are continuously being undertaken. These initiatives are all contributing to a more professional and efficient working environment at Gedabek which will both lower cost and result in safer working.

The Company continues to formalise all its resources and ore reserves and classify them according to the JORC Code of reporting. The recently published updated JORC resource for the Gedabek open pit of circa one million ounces of gold further extends the life of the open pit by a further five to six years. The Company anticipates that it will publish a JORC resource for the Gadir underground mine by the end of 2018.

The Company's three-year geological exploration programme has made an excellent start confirming additional mineralisation at Gedabek. The presence of further mineable copper and gold ores in the Gedabek open pit was established which will provide additional ore for the flotation plant. Significant gold grades of up to three ounces per tonne were intersected in drilling and confirmed by tunneling in the Gadir ore body and the presence of mineralisation beneath the open pit was established. The Group will shortly carry out an airborne geophysical survey of the entire Gedabek contract area using the Z-Axis Tipper Electromagnetic system ("ZTEM"). This will be the first such survey carried out in Azerbaijan and I was very pleased a Ministry of the Government of Azerbaijan have agreed to assist us by providing helicopter services.

The Company's health and safety ("HSE") record continues to improve with a reduction in the Lost Time Injury ("LTI") rate in the six months to 30 June 2018 to 1.13 compared to 1.21 in the comparable period in 2017. The basis of the calculation of the LTI rate is set out in the Strategic Report below. We continue to undertake actions to improve HSE performance and full risk assessments of the three main processing plants were carried out during the period. Emergency safety equipment including breathing apparatus is now in place at Gedabek.

Dividend

Following the circular to shareholders proposing a resolution to reduce the Company's share premium account to $nil, and the general meeting held on 30 July 2018 which approved the resolution, the Court granted an order on 28 August 2018 to cancel the Company's share premium account at that date of $32.6 million to $nil. This currently gives the Company the capacity to pay dividends to its shareholders of up to a total of $13.5 million. Profits generated by the Group can be transferred to the Company by intercompany dividends which will further increase this capacity.

The board will target a distribution to shareholders each year comprising approximately 25 per cent. of the Group's free cash flow. This distribution will be made in two approximately equal installments comprising an interim and final dividend. The amounts and timing of payment of the interim and final dividends will be announced each year along with the Group's interim and final results respectively. The board will review this policy each year taking into account the financing needs of the business at that time. Free cash flow is defined as net cash flow from operating activities less capital expenditure.

I am therefore delighted to announce the maiden dividend of the Company of US cents 3.00 per share. This is an interim dividend in respect of the year ending 31 December 2018 and will be payable on 8 November 2018 to shareholders on the record date of 12 October 2018. The dividend will be payable in pounds sterling as set out below.

Outlook

It is with continued optimism that I look forward to the rest of 2018 and beyond and the declaration of our maiden dividend demonstrates the Board's confidence in the future. During the latter part of 2017 and in 2018 to date, we have opened Ugur, a new open-pit mine, significantly increased production and revenues, reduced our AISC and debt and added to the Company's resources. We have installed a second crusher and carried out other initiatives to maintain and increase production from our existing mines. We have started a three-year exploration programme to further explore and develop the potential of Gedabek and Ordubad and published an updated JORC resource for the Gedabek open pit extending the mine life for a further around five to six years. This progress has enabled us to target significantly higher production for 2018 compared to production in the previous two years and we are on track to achieve this target.

The Group has a production target for 2018 of between 78,000 ounces and 84,000 GEOs, an increase of over 13 per cent. compared to total production of 71,461 GEOs in 2017. This includes between 64,000 ounces and 70,000 ounces of gold and between 2,100 tonnes and 2,300 tonnes of copper. I look forward to updating our shareholders on our progress over the remainder of 2018.

Appreciation

I would like to take this opportunity to thank our Anglo Asian employees, our partners, the Government of Azerbaijan, advisers and fellow directors for their continued support as we continue to build the Company into a leading and sustainable gold, copper and silver producer in Azerbaijan and Caucasia. I would also like to especially thank our shareholders for their invaluable support as we look forward to a successful completion of 2018 and beyond.

Khosrow Zamani

Non-executive Chairman

18 September 2018

DIVID

An interim dividend of US$0.03 per share will be paid gross in respect of the year ending 31 December 2018 to shareholders on 8 November 2018 that are on the shareholders record at the record date of 12 October 2018. The shares will go ex-dividend on 11 October 2018. All dividends will be paid gross and in cash. A scrip dividend or any other dividend reinvestment plan will not be offered by the Company.

The dividend will be payable in pounds sterling. The dividend will be converted to pounds sterling using the average of the sterling closing mid-price using the exchange rate published by the Bank of England at 4pm each day from the 15 to 19 October 2018.

STRATEGIC REVIEW

Principal activities

The principal activity of Anglo Asian Mining PLC (the "Company") is that of a holding company and a provider of support and management services to its main operating subsidiary R.V. Investment Group Services LLC. The Company, together with its subsidiaries (the "Group"), owns and operates gold, silver and copper producing properties in the Republic of Azerbaijan ("Azerbaijan"). It also explores for and develops other potential gold and copper deposits in Azerbaijan.

The Group has a 1,962 square kilometre portfolio of gold, silver and copper properties in western Azerbaijan, at various stages of the development cycle. The Group's primary operating site is Gedabek, which is the location of the Group's main gold, silver and copper open pit mine; the Ugur open pit mine and Gadir, an underground mine. The Group's processing facilities to produce gold doré and copper, silver and gold concentrates are also located at Gedabek. Gosha, the Group's second underground gold and silver mine, is located 50 kilometres away from Gedabek. Ordubad, the Group's early stage gold and copper exploration project is located in Nakhchivan, South West Azerbaijan.

Overview of H1 2018 and FY 2018 production target

The Company successfully completed various initiatives in 2017 to ensure sustainable long-term production at Gedabek. These included both production optimisation and exploration of its existing open pit and underground mines and the commencement of production from Ugur. These initiatives all benefitted production in H1 2018.

The Company also completed other initiatives in H1 2018 to improve the operational efficiency at Gedabek. These include improving the roads and improving workshop facilities for on-site maintenance. Several specialist managers have also been recruited to improve working practices in areas such as general mining practice, drill and blast and equipment maintenance. A considerable amount of investment has been made in in both plant and drill rigs. A second crusher line has also been installed for the agitation and flotation plants. This both improves the flexibility of the processing facilities and increases their production capacity.

The Group has a production target for the year to 31 December 2018 of 64,000 ounces to 70,000 ounces of gold and 2,100 tonnes to 2,300 tonnes of copper. The total production target for the year to 31 December 2018 expressed as gold equivalent ounces ("GEOs") is between 78,000 GEOs and 84,000 GEOs, compared to total production for the year to 31 December 2017 of 71,461 GEOs.

Gedabek

Introduction

The Gedabek mining operation is located in a 300 square kilometre contract area in the Lower Caucasus mountains in western Azerbaijan on the Tethyan Tectonic Belt, one of the world's most significant copper and gold-bearing geological structures. Gedabek is the location of the Group's open pits and underground mines and its processing facilities.

Gold was first poured from ore mined from the main open pit mine and processed by heap leaching in May 2009. Copper and precious metal concentrate production began in 2010 when the Sulphidisation, Acidification, Recycling and Thickening (SART) plant was commissioned. The Group's agitation leaching plant commenced production in 2013 and its flotation plant in 2015. Underground extraction of ore started in June 2015 when the Gadir mine was opened. During 2017, the Group brought Ugur, a newly discovered gold deposit three kilometres north-west of its processing facilities, into production as an open pit mine. In 2018, the Company installed a second crusher line to enable separate operation of the agitation and flotation processing plants.

Mineral resources and ore reserves

Key to the future development of the Gedabek site is our knowledge of the mineral resources and ore reserves within the contract area. In September 2018, the Group published updated Mineral Resources and Ore Reserves for the Gedabek open pit. These are shown in Tables 1 and 2 below.

The mineral resource and reserves are prepared in accordance with JORC Code (2012), which is the current edition of the JORC Code. After a transition period, the 2012 edition came into mandatory operation from 1 December 2013. The resources and reserves stated below are in-situ.

Table 1 - Mineral resources for the Gedabek Open pit

 
 Gold (+ Copper) Mineral Resources (cut-off 
  0.3g/t gold) 
  Mineral Resource        Tonnage               Gold                  Copper                 Silver                     Gold                      Copper                     Silver 
                      ---------------  ---------------------  ---------------------  ---------------------  ---------------------------  ------------------------  ------------------------- 
                            (Mt)               Grade                  Grade                  Grade                     ('000                       ('000                     ('000 
                                                (g/t)                   (%)                   (g/t)                    ounces)                    Tonnes)                    ounces) 
                      ---------------  ---------------------  ---------------------  ---------------------  ---------------------------  ------------------------  ------------------------- 
 Measured                        18.0                    0.9                    0.2                    8.3                          532                      38.0                      4,800 
                      ---------------  ---------------------  ---------------------  ---------------------  ---------------------------  ------------------------  ------------------------- 
 Indicated                       11.1                    0.7                    0.1                    5.6                          264                      15.7                      2,011 
                      ---------------  ---------------------  ---------------------  ---------------------  ---------------------------  ------------------------  ------------------------- 
 Measured+Indicated              29.1                    0.9                    0.2                    7.3                          796                      53.7                      6,811 
                      ---------------  ---------------------  ---------------------  ---------------------  ---------------------------  ------------------------  ------------------------- 
 Inferred                         8.5                    0.7                    0.1                    5.0                          189                       9.7                      1,361 
                      ---------------  ---------------------  ---------------------  ---------------------  ---------------------------  ------------------------  ------------------------- 
 Total                           37.6                    0.8                    0.2                    6.8                          986                      63.4                      8,172 
                      ---------------  ---------------------  ---------------------  ---------------------  ---------------------------  ------------------------  ------------------------- 
 
 Copper Mineral Resource (Additional to Gold Mineral Resource) 
  (gold <0.3g/t and copper >0.3%) 
                                                                                                                                                                   ------------------------- 
 Mineral Resources      Tonnage          Gold                   Copper                 Silver                 Gold                         Copper                    Silver 
                      ---------------  ---------------------  ---------------------  ---------------------  ---------------------------  ------------------------  ------------------------- 
                        (Mt)            Grade                   Grade                  Grade                  ('000                        ('000                     ('000 
                                         (g/t)                   (%)                    (g/t)                  ounces)                      Tonnes)                   ounces) 
                      ---------------  ---------------------  ---------------------  ---------------------  ---------------------------  ------------------------  ------------------------- 
 Measured                         5.3                    0.1                    0.5                    2.1                           21                      26.3                        356 
                      ---------------  ---------------------  ---------------------  ---------------------  ---------------------------  ------------------------  ------------------------- 
 Indicated                        0.9                    0.1                    0.5                    1.6                            3                       4.4                         48 
                      ---------------  ---------------------  ---------------------  ---------------------  ---------------------------  ------------------------  ------------------------- 
 Measured+Indicated               6.2                    0.1                    0.5                    2.0                           24                      30.7                        404 
                      ---------------  ---------------------  ---------------------  ---------------------  ---------------------------  ------------------------  ------------------------- 
 Inferred                         0.5                    0.1                    0.4                    1.5                            1                       1.9                         23 
                      ---------------  ---------------------  ---------------------  ---------------------  ---------------------------  ------------------------  ------------------------- 
 Total                            6.7                    0.1                    0.5                    2.0                           25                      32.6                        426 
                      ---------------  ---------------------  ---------------------  ---------------------  ---------------------------  ------------------------  ------------------------- 
 

Table 2 - Ore Reserves for the Gedabek Open Pit

 
 Ore Reserves       Tonnage                Gold                   Copper                 Silver                 Gold                       Copper                    Silver 
                    (Mt)                  Grade                  Grade                  Grade                  ('000                      ('000                     ('000 
                                           (g/t)                  (%)                    (g/t)                  ounces)                    Tonnes)                   ounces) 
                   --------------------  ---------------------  ---------------------  ---------------------  -------------------------  ------------------------  ------------------------ 
 Proved                            10.9                    0.9                    0.3                    8.8                        311                      31.9                     3,084 
                   --------------------  ---------------------  ---------------------  ---------------------  -------------------------  ------------------------  ------------------------ 
 Probable                           1.2                    0.8                    0.3                    9.5                         32                       4.1                       373 
                   --------------------  ---------------------  ---------------------  ---------------------  -------------------------  ------------------------  ------------------------ 
 Proved+Probable                   12.1                    0.9                    0.3                    8.9                        343                      36.0                     3,457 
                   --------------------  ---------------------  ---------------------  ---------------------  -------------------------  ------------------------  ------------------------ 
 

The above Proved and Probable Ore Reserves estimate is based on that portion of the Measured and Indicated Mineral Resource of the deposit within the scheduled mine designs that may be economically extracted, considering all "Modifying Factors" in accordance with the JORC (2012) Code.

During 2017, the Group completed the JORC (2012) mineral resource and ore reserve statements for the Ugur deposit. Table 3 shows the mineral resource estimate for the Ugur deposit and Table 4 shows the ore reserve estimate for the Ugur deposit.

Table 3 - Ugur mineral resource estimate at 1 August 2017

 
                                   Mineral resource 
                              In situ grades       Contained metal 
                ----------  -----------------  ---------------------- 
 Resource          In situ     Au        Ag            Au         Ag* 
  category        (tonnes)    (g/t)     (g/t)    (ounces)    (ounces) 
                ----------  --------  -------  ----------  ---------- 
 Measured        4,120,000     1.2      6.3       164,000     841,000 
                ----------  --------  -------  ----------  ---------- 
 Indicated         340,000     0.8      3.9         8,000      44,000 
                ----------  --------  -------  ----------  ---------- 
 Measured and 
  indicated      4,460,000     1.2      6.2       172,000     884,000 
                ----------  --------  -------  ----------  ---------- 
 Inferred        2,500,000     0.3      2.1        27,000     165,000 
                ----------  --------  -------  ----------  ---------- 
 Total           6,960,000     0.9      4.7       199,000   1,049,000 
                ----------  --------  -------  ----------  ---------- 
 

* does not add due to rounding

Table 4 - Ugur ore reserves estimate at 1 August 2017

 
                                            Ore reserves 
                                     In situ grades       Contained metal 
                       ----------  -----------------  ---------------------- 
 Reserve                  In situ     Au        Ag            Au          Ag 
  category               (tonnes)    (g/t)     (g/t)    (ounces)    (ounces) 
                       ----------  --------  -------  ----------  ---------- 
 Proved                 3,370,000     1.3      7.2       142,000     779,000 
                       ----------  --------  -------  ----------  ---------- 
 Probable                 220,000     0.8      4.1         5,000      29,000 
                       ----------  --------  -------  ----------  ---------- 
 Proved and probable    3,590,000     1.3      7.0       147,000     808,000 
                       ----------  --------  -------  ----------  ---------- 
 

Operational review

The Company mined the following ore in the six months ended 30 June 2018:

 
                      12 months to               3 months to               3 months to 
                     31 December 2017           31 March 2018              30 June 2018 
                                 Average                   Average                   Average 
 Mine            Ore mined    gold grade   Ore mined    gold grade   Ore mined    gold grade 
                  (tonnes)         (g/t)    (tonnes)         (g/t)    (tonnes)         (g/t) 
                ----------  ------------  ----------  ------------  ----------  ------------ 
 Open pit          712,444          1.18      28,326          0.92      22,732          0.99 
 Ugur - o/pit      238,818          3.20     288,214          0.96     173,168          1.87 
 Gadir - 
  u/g               80,614          3.56      19,948          5.86      25,411          4.43 
 Gosha - 
  u/g               28,284          3.99           -             -           -             - 
                ----------  ------------  ----------  ------------  ----------  ------------ 
 Total           1,060,160          1.89     336,488          1.25     221,311          2.07 
==============  ==========  ============  ==========  ============  ==========  ============ 
 

As previously reported, low grade ore (less than 1.5 grammes per tonne of gold) is being treated by heap leaching, whilst higher grade ore (more than 1.5 grammes per tonne of gold) is being processed through the combined agitation leaching and flotation plants.

Anglo Asian stacked 321,228 tonnes of dry crushed ore on to heap leach pads with an average gold content of 0.92 grammes per tonne during H1 2018 (H1 2017: 272,495 tonnes with an average gold content of 1.03 grammes per tonne). The Company also heap leached uncrushed (Run of Mine - "ROM") ore. During H1 2018, Anglo Asian stacked 265,857 tonnes of ROM ore on to heap leach pads with an average gold content of 0.51 grammes per tonne (H1 2017: 219,181 tonnes with an average gold content of 0.88 grammes per tonne).

380,306 tonnes of ore with an average gold content of 2.08 grammes per tonne were processed through the agitation leaching plant in H1 2018 (H1 2017: 360,872 tonnes of ore with an average gold content of 1.62 grammes per tonne).

Gold doré containing 31,282 ounces of gold and 13,124 ounces of silver at Gedabek was produced in H1 2018 (H1 2017: 18,389 ounces of gold and 5,713 ounces of silver). The agitation leaching plant produced 21,087 and 8,988 ounces of gold and silver, respectively, and the heap leach operations produced 10,195 and 4,136 ounces of gold and silver, respectively. The increased gold doré production in H1 2018 compared to H1 2017 was due to the higher grade of the Ugur ore processed in H1 2018.

The flotation plant processed 95,907 tonnes of feed-stock in H1 2018 (H1 2017: 275,581 tonnes). The gross metal contained within this feed-stock was 4,144 ounces of gold, 50,483 ounces of silver and 430 tonnes of copper (H1 2017: 10,317 ounces of gold, 149,588 ounces of silver and 1,340 tonnes of copper.) Copper concentrate of 1,955 dmt was produced containing 336 tonnes of copper and 1,961 ounces of gold (H1 2017: Copper concentrate of 5,515 dmt was produced containing 925 tonnes of copper and 4,820 ounces of gold). SART processing produced 483 dmt of copper concentrate containing 251 tonnes of copper and 12 ounces of gold (H1 2017: 847 dmt of copper concentrate containing 397 tonnes of copper and 9 ounces of gold).

The Company sold 2,344 dmt of copper concentrate in H1 2018 for $5.9 million compared to 5,396 dmt for $10.3 million in H1 2017 (excluding Government of Azerbaijan production share).

The following table summarises gold doré production and sales at Gedabek for FY 2017 and H1 2018:

 
                 Gold produced*       Silver   Gold sales**  Gold Sales 
                       (ounces)    Produced*       (ounces)       price 
                                    (ounces)                  ($/ounce) 
Quarter ended 
31 March 2017             9,258        2,447          8,283       1,220 
30 June 2017              9,131        3,266          7,406       1,258 
H1 2017                  18,389        5,713         15,689       1,238 
30 Sept 2017             12,221        4,381          9,287       1,286 
31 Dec 2017              21,924       12,634         18,520       1,278 
H2 2017                  34,145       17,015         27,807       1,281 
FY 2017                  52,534       22,728         43,496       1,265 
 
31 March 2018*           15,750        7,110         14,956       1,328 
30 June 2018             15,532        6,014         10,822       1,307 
H1 2018                  31,282       13,124         25,778       1,319 
---------------  --------------  -----------  -------------  ---------- 
 

Note that some of the figures in the above table may differ from previously reported due to agreement of final assay.

* including Government of Azerbaijan's share

** excludes Government of Azerbaijan's share

The following table summarises copper concentrate production from both its SART and flotation plants at Gedabek for FY 2017 and H1 2018:

 
                              Concentrate     Copper       Gold     Silver 
                              production*   content*   content*   content* 
 2017                               (dmt)   (tonnes)   (ounces)   (ounces) 
 Quarter ended 31 March 
 SART processing                      428        210          5      5,523 
 Flotation                          2,312        396      1,815     31,399 
 Total                              2,740        606      1,820     36,922 
 
 Quarter ended 30 June 
 SART processing                      419        187          4      4,717 
 Flotation                          3,203        529      3,005     37,735 
 Total                              3,622        716      3,009     42,452 
 
 Quarter ended 30 Sept 
 SART processing                      333        165          4      9,097 
 Flotation                          2,379        385      2,243     26,810 
 Total                              2,712        550      2,247     35,907 
 
 Quarter ended 31 December 
 SART processing                      256        119          7     34,844 
 Flotation                              -          -          -          - 
 Total                                256        119          7     34,844 
 
 2018 
 Quarter ended 31 March 
 SART processing                      223        114          6     21,887 
 Flotation                            819        141        735     11,587 
 Total                              1,042        255        741     33,474 
 
 Quarter ended 30 June 
 SART processing                      260        137          6     21,800 
 Flotation                          1,136        195      1,226     16,387 
 Total                              1,396        332      1,232     38,187 
---------------------------  ------------  ---------  ---------  --------- 
 

* including Government of Azerbaijan's share.

The following table summarises copper concentrate production and sales at Gedabek for FY 2017 and H1 2018. Note that sales of concentrates are initially recorded at provisional amounts until agreement of final assay:

 
 
                  Concentrate     Copper       Gold     Silver    Concentrate     Concentrate 
                  production*   content*   content*   content*        sales**         sales** 
                        (dmt)   (tonnes)   (ounces)   (ounces)          (dmt)          ($000) 
 Quarter ended 
 31 March 2017          2,740        606      1,820     36,922          2,230           4,220 
 30 June 2017           3,622        716      3,009     42,452          3,166           6,104 
 H1 2017                6,362      1,322      4,829     79,374          5,396          10,324 
 
 30 Sept 2017           2,712        550      2,247     35,907          2,905           5,480 
 31 Dec 2017              256        119          7     34,844            198             854 
 H2 2017                2,968        669      2,254     70,751          3,103           6,334 
 FY 2017                9,330      1,991      7,083    150,125          8,499          16,658 
 
 31 March 2018          1,042        255        741     33,474            608           1,715 
 30 June 2018           1,396        332      1,232     38,187          1,736           4,221 
 H1 2018                2,438        587      1,973     71,661          2,344           5,936 
---------------  ------------  ---------  ---------  ---------  -------------  -------------- 
 

* including Government of Azerbaijan's share

** excludes Government of Azerbaijan's share

Gedabek - operational update

The major improvement to Gedabek operations in the period was the commencement of operation of the second crusher plant. This has a budgeted capacity of 95 tonnes per hour compared to the existing crusher of up to 120 tonnes per hour. This removes a large bottleneck and enables independent operation of the agitation leaching and flotation plants from separate sources of feedstock. The addition of this second crusher not only significantly increases the capacity of our processing plants but also their flexibility.

Various other initiatives have been undertaken during 2018 to improve the operational efficiency at site:

-- The Company has started to reconfigure its ROM stockpile pads. This will enable more efficient (and therefore lower cost) handling of plant feed and this work is expected to be completed by the end of 2018.

-- Transportation logistics are being improved with a new spur road link between the main open pit mine and processing plant now under construction. This new road will reduce haulage distances between the mine and the processing plant.

   --    An expansion of the on-site maintenance facilities and workshop is now being planned. 

-- Several specialist managers have been recruited to improve working practices. These are in the areas of mining, drill and blast, equipment operation and maintenance.

-- A diesel filtration system has been installed to improve the quality of fuel used which will improve the efficient operation of equipment.

-- A new solution sprinkling system has been installed to better distribute cyanide on heaps which are being leached.

Health, Safety and environment

The Company continues to invest resources to improve its health, safety and environment ("HSE") performance to achieve best in class practice. The Company's safety record continues to improve and the Lost Time Injury ("LTI") frequency rate for the six months to 30 June 2018 was 1.13 compared to 1.21 in the comparable period in 2017. The LTI frequency rate for any period is calculated as the number of lost time injuries in the period divided by the total man hours worked in the period multiplied by one million. The Company has implemented several initiatives at Gedabek to improve safety in the period including completing comprehensive risk assessments of the agitation leaching, SART and flotation plants. Institution of Occupational Safety and Health training - "IOSH Managing Safety" was also completed for all HSE department employees. Emergency response equipment including breathing apparatus is now in place at Gedabek.

There was one LTI injury during the period. An employee suffered a broken leg in the Gadir underground mine whilst assisting in changing a tyre of a loader. The flange of the tyre came loose and hit his leg whilst the tyre was being inflated. Various procedures have been implemented following the accident to prevent such incidents re-occurring including implementing safer procedures for changing tyres and installing safety locks to tyres.

Gedabek - Geological update

The Group's three-year geological exploration programme commenced during the year. The major results from the programme for the six months to 30 June 2018 are as follows:

-- There is increased confidence in the short to medium term production profile at the Gadir underground mine ("Gadir") following confirmation of continuation of the Gadir ore-body down-dip and potentially along strike.

-- Significant gold grades of up to three ounces per tonne (93 grammes per tonne) were intersected in drilling and confirmed by underground tunneling at Gadir.

-- Numerous areas of high grade mineralisation adjacent to the current Gadir operation were identified. It is expected a resource and reserve estimate for Gadir will be published in Q4 2018.

-- Additional mineralisation beneath the Gedabek open pit was confirmed which will be the subject of further underground evaluation accessed by tunnels developed from the Gadir mine.

-- Extensive alteration zones of porphyry style previously discovered at Ordubad with confirmation of copper and gold mineralisation, are now the subject of an extensive geochemical sampling programme.

FINANCIAL REVIEW

Group statement of income

Revenue of $40.0m was generated from the sales of Anglo Asian's share of gold and silver bullion, refined from gold doré bars, and copper and precious metal concentrate in the six months ended 30 June 2018. Sales of gold and silver bullion were $34.1m which comprised 25,778 ounces of gold and 13,493 ounces of silver sold at an average price of $1,319 and $17 per ounce respectively. Sales of copper and precious metal concentrate were $5.9m. No hedging of gold bullion sales was undertaken in the six months to 30 June 2018.

Total cost of sales for the six months ended 30 June 2018 increased by $1.6m to $27.5m compared to $25.9m in H1 2017. Cash costs decreased by $0.6m to $19.7m compared to $20.5m in H1 2017 due to lower reagent and other consumable costs as a result of processing "cleaner" oxide Ugur ores and a lower throughput through the flotation plant. This was partially offset by higher drilling and employee costs. Depreciation increased by $2.1m from $7.0m in H1 2017 to $9.1m in H1 2018 due to higher gold production. Accumulated mine development costs within producing mines are depreciated and amortised on a unit-of-production basis over the economically recoverable reserves of the mine concerned, except in the case of assets whose useful life is shorter than the life of the mine, in which case the straight line method is applied. The unit of account for run of mine ("ROM") costs and for post-ROM costs are recoverable ounces of gold.

Administrative expenses for the six months ended 30 June 2018 increased to $2.5m compared to $2.3m in H1 2017. Administrative expenses comprise the cost of the Company's office in Baku, directors and other administrative staff salaries, professional fees and the cost of maintaining the Company's listing on the AIM market.

The finance costs for the six months ended 30 June 2018 of $1.0m comprise interest on loans of $0.8m and accretion expense on the rehabilitation provision of $0.2m. Finance costs were lower in the period due to both lower average borrowings and borrowing costs in the period. There were no borrowing costs capitalised in the six months ended 30 June 2018.

The Group had a taxation charge in the six months ended 30 June 2018 of $3.0m (H1 2017: $1.4m). This comprised a current income tax charge of $2.5m (H1 2017: $nil) and a deferred tax charge of $0.5m (H1 2017: $1.4m). The Group had a current taxation charge in the six months ended 30 June 2018 as the taxable profits incurred by its operating company in Azerbaijan exceeded taxable losses brought forward from previous years. The Company therefore had no unused taxable losses carried forward at 30 June 2018. The Company expects to pay corporation tax in the year ending 31 December 2018 and future years. The taxable profits of the operating company in Azerbaijan are taxed at 32 per cent. However, the overall tax rate is higher than 32 per cent. because the UK administrative costs and depreciation of mining rights in Azerbaijan cannot be offset against the taxable profits arising in Azerbaijan.

All in sustaining cost of production

The Group produced gold bullion at an all in sustaining cost ("AISC") for the six months ended 30 June 2018 of $543 per ounce compared to $564 per ounce for the six months ended June 2017 and $604 for the full year 2017. AISC for the period ended 30 June 2018 was lower than 2017 due to the higher amount of gold produced partially offset by higher costs of sustaining capital and lower by-product sales. There are no royalty costs included in the Company's AISC calculation as the Production Sharing Agreement with the Government of Azerbaijan is structured as a revenue sharing arrangement. Therefore, the Company's AISC is calculated using a cost of sales which is the cost of producing 100 per cent. of the gold and such costs are allocated to total gold production including the Government of Azerbaijan's share.

Group statement of financial position and cash flows

The Company had cash at 30 June 2018 of $12.5m and total debt at amortised cost of $15.4m, giving net debt of $2.9 million.

In February 2018, the Group entered into a refinancing agreement with Pasha Bank OJSC, as arranger, for a syndicated loan facility for up to $15m to refinance the majority of the Group's existing loans. The significant terms of the loan were as follows:

-- Two-year term loan facility for up to $15m at 7 per cent. per annum fixed interest rate;

   --          The loan facility is unsecured and there are no financial covenants; 
   --          Total arrangement fee of 0.25 per cent. of the amount borrowed; and 
   --          Early repayment is permitted. 

A total of $13.5m of the facility was drawn-down and used to repay the loans from Amsterdam Trade Bank and Gazprombank Switzerland totaling $7.4m, the Chief Executive Officer of $3.9m and $2.2m of loans from Yapi Credit Bank.

The Company had no unused credit facilities at 30 June 2018.

Operating cash inflow before movements in working capital for the six months to June 2018 was $18.5m (H1 2017: $8.7m). The main source of operating cash flow was the profit before taxation before the non-cash charges of depreciation and amortisation in the six months ended 30 June 2018 of $17.5m (H1 2017: $6.6m). The increase in H1 2018 compared to H1 2017 reflects the return to profitability of the Group in the period.

Working capital movements in the six months to 30 June 2018 increased cash by $6.0m (H1 2017: $2.1m) primarily due to a decrease in inventories of $2.9m and an increase in taxes payable of $2.5m.

Capital expenditure of $8.2m for the six months ended 30 June 2018 was mainly in respect of capitalised deferred stripping costs of $4.9m; expenditure on the new crusher plant of $2.0m and underground equipment of $0.8m.

Capitalised exploration and evaluation expenditure of $0.1m was incurred in the six months ended 30 June 2018 which was mainly exploration in the Ordubad contract area.

Production sharing agreement

Under the terms of the Production Sharing Agreement ("PSA") with the Government of Azerbaijan ("Government"), the Group and the Government share the commercial products of each mine. The Government's share is 51 per cent. of "Profit Production". Profit Production is defined as the value of production, less all capital and operating cash costs incurred during the period when the production took place. Profit Production for any period is subject to a minimum of 25 per cent. of the value of the production. This is to ensure the Government always receives a share of production. The minimum Profit Production is applied when the total capital and operating cash costs (including any unrecovered costs from previous periods) are greater than 75 per cent. of the value of production. All operating and capital cash costs in excess of 75 per cent. of the value of production can be carried forward indefinitely and set off against the value of future production.

Profit Production for the Group has been subject to the minimum 25 per cent. since commencement of production including 2017 and the six months to 30 June 2018. The Government's share of production in the six months to 30 June 2018 (as in all previous periods) was therefore 12.75 per cent. being 51 per cent. of 25 per cent. with the Group entitled to the remaining 87.25 per cent. The Group was therefore subject to an effective royalty on its revenues in the six months to 30 June 2018 of 12.75 per cent. of the value of its production.

The Group can recover the following costs in accordance with the PSA:

   --    all direct operating expenses of the Gedabek mine; 
   --    all exploration expenses incurred on the Gedabek contract area; 
   --    all capital expenditure incurred on the Gedabek mine; 

-- an allocation of corporate overheads - currently, overheads are apportioned to Gedabek according to the ratio of direct capital and operating expenditure at the Gedabek contract area compared with direct capital and operational expenditure at the Gosha and Ordubad contract areas; and

-- an imputed interest rate of United States Dollar LIBOR + 4 per cent. per annum on any unrecovered costs.

Unrecovered costs are calculated separately for the three contract areas of Gedabek, Gosha and Ordubad and can only be recovered against production from their respective contract areas. The total unrecovered costs for the Gedabek and Gosha contract areas at 30 June 2018 were $82.7m and $22.6m respectively (31 December 2017: $94.6m and $21.8m respectively).

Foreign currency exposure

The Group reports in US dollars and a substantial proportion of its business is conducted in either US dollars or the Azerbaijan Manat ("AZN") which has been stable at AZN 1 equalling approximately $0.58 during the six months ended 30 June 2018. In addition, the Company's revenues and the majority of its interest-bearing debt are denominated in US dollars. The Company currently does not have any significant exposure to foreign exchange fluctuations and the situation is kept under review.

Anglo Asian Mining plc

Condensed group statement of income

Six months ended 30 June 2018

 
 
                                                            6 months            6 months 
                                                                  to                  to 
                                                             30 June         30 June 
                                                                2018           2017 
                                                         (unaudited)         (unaudited) 
                                 Notes                          $000                $000 
------------------------------  ------  ----------------------------  ------------------ 
 Revenue                                                      39,967              29,838 
 Cost of sales                                              (27,528)            (25,928) 
------------------------------  ------  ----------------------------  ------------------ 
 Gross profit                                                 12,439               3,910 
 Other income                                                      9                   8 
 Administrative expenses                                     (2,492)             (2,316) 
 Other operating expense                                       (899)               (996) 
 Operating profit                                              9,057                 606 
 Finance income                                                   19                   - 
 Finance costs                                               (1,010)             (1,930) 
------------------------------  ------  ----------------------------  ------------------ 
 Profit / (loss) before tax                                    8,066             (1,324) 
 Income tax                          3                       (2,990)             (1,418) 
------------------------------  ------  ----------------------------  ------------------ 
 Profit / (loss) attributable 
  to the equity holders of 
  the parent                                                   5,076             (2,742) 
------------------------------  ------  ----------------------------  ------------------ 
 
   Profit / (loss) per share 
   attributable to the equity 
   holders of the parent                                       5,076             (2,742) 
------------------------------  ------  ----------------------------  ------------------ 
 Basic (US cents per share)          4                          4.46              (2.44) 
 Diluted (US cents per share)        4                          4.45              (2.43) 
------------------------------  ------  ----------------------------  ------------------ 
 
 

Anglo Asian Mining plc

Condensed group statement of comprehensive income

Six months ended 30 June 2018

 
 
                                           6 months       6 months 
                                                 to             to 
                                            30 June        30 June 
                                               2018           2017 
                                        (unaudited)    (unaudited) 
                                               $000           $000 
-------------------------------------  ------------  ------------- 
 Profit / (loss) for the period               5,076        (2,742) 
-------------------------------------  ------------  ------------- 
 Total comprehensive profit / (loss) 
  for the period                              5,076        (2,742) 
-------------------------------------  ------------  ------------- 
 
 Attributable to the equity holders 
  of the parent company                       5,076        (2,742) 
-------------------------------------  ------------  ------------- 
 
 

Anglo Asian Mining plc

Condensed group statement of financial position

30 June 2018

 
 
 
                                                30 June         30 June    31 December 
                                                   2018            2017           2017 
                                            (unaudited)     (unaudited)      (audited) 
                                  Notes            $000            $000           $000 
-------------------------------  ------  --------------  --------------  ------------- 
 Non-current assets 
 Intangible assets                    5          15,251          16,283         16,145 
 Property, plant and equipment        6          85,966          94,012         87,387 
 Other receivables                    7           1,259           1,272            875 
-------------------------------  ------  --------------  --------------  ------------- 
                                                102,476         111,567        104,407 
-------------------------------  ------  --------------  --------------  ------------- 
 Current assets 
 Inventory                            8          31,033          34,229         33,980 
 Trade and other receivables          7          15,113          18,421         11,276 
 Cash and cash equivalents                       12,547           1,527          2,534 
-------------------------------  ------  --------------  --------------  ------------- 
                                                 58,693          54,177         47,790 
-------------------------------  ------  --------------  --------------  ------------- 
 Total assets                                   161,169         165,744        152,197 
-------------------------------  ------  --------------  --------------  ------------- 
 Current liabilities 
 Trade and other payables             9        (21,387)        (26,534)       (15,170) 
 Taxes payable                                  (2,526)               -              - 
 Interest-bearing loans 
  and borrowings                     10        (10,382)        (26,047)       (20,051) 
-------------------------------  ------  --------------  --------------  ------------- 
                                               (34,295)        (52,581)       (35,221) 
-------------------------------  ------  --------------  --------------  ------------- 
 Net current assets                              24,398           1,596         12,569 
-------------------------------  ------  --------------  --------------  ------------- 
 Non-current liabilities 
 Provision for rehabilitation                   (9,524)         (9,138)        (9,629) 
 Interest-bearing loans 
  and borrowings                     10         (5,063)         (4,466)          (600) 
 Deferred tax liability                        (21,858)        (19,648)       (21,394) 
-------------------------------  ------  --------------  --------------  ------------- 
                                               (36,445)        (33,252)       (31,623) 
-------------------------------  ------  --------------  --------------  ------------- 
 Total liabilities                             (70,740)        (85,833)       (66,844) 
-------------------------------  ------  --------------  --------------  ------------- 
 Net assets                                      90,429          79,911         85,353 
-------------------------------  ------  --------------  --------------  ------------- 
 Equity 
 Share capital                       11           2,008           1,993          2,008 
 Share premium account                           32,484          32,325         32,484 
 Share-based payment reserve                         74             161             74 
 Merger reserve                                  46,206          46,206         46,206 
 Retained earnings / (loss)                       9,657           (774)          4,581 
 Total equity                                    90,429          79,911         85,353 
-------------------------------  ------  --------------  --------------  ------------- 
 

Anglo Asian Mining plc

Condensed group statement of cash flows

Six months ended 30 June 2018

 
                                                            6 months       6 months 
                                                                  to             to 
                                                             30 June        30 June 
                                                                2018           2017 
                                                         (unaudited)    (unaudited) 
                                                                $000           $000 
-----------------------------------------------  ----  -------------  ------------- 
 Cash flows from operating activities 
 Profit / (loss) before taxation                               8,066        (1,324) 
 Adjustments to reconcile profit / (loss) 
  before tax to net cash flows: 
 Finance income                                                 (19)              - 
 Finance costs                                                 1,010          1,930 
 Depreciation of property, plant and equipment                 8,456          7,290 
 Amortisation of mining rights and other 
  intangible assets                                              986            673 
 Share-based payment expense                                       -              7 
 Write down of unrecoverable inventory                            34            107 
-----------------------------------------------------  -------------  ------------- 
 Operating cash flow before movements 
  in working capital                                          18,533          8,683 
 Decrease in trade and other receivables                         437          1,391 
 Decrease / (increase) in inventories                          2,912          (318) 
 Increase in taxes payable                                     2,526              - 
 Increase in trade and other payables                            172          1,029 
-----------------------------------------------------  -------------  ------------- 
 Cash from operations                                         24,580         10,785 
 Income tax paid                                                   -              - 
-----------------------------------------------  ----  -------------  ------------- 
 Net cash flow from operating activities                      24,580         10,785 
-----------------------------------------------------  -------------  ------------- 
 
 Cash flows from investing activities 
 Expenditure on property, plant and equipment 
  and mine development                                       (8,183)        (3,404) 
 Investment in exploration and evaluation 
  activities                                                    (91)          (109) 
 Interest received                                                19              - 
 Net cash used in investing activities                       (8,255)        (3,513) 
-----------------------------------------------------  -------------  ------------- 
 
 Cash flows from financing activities 
 Proceeds from borrowing                                      13,995          6,651 
 Repayment of borrowings                                    (19,199)       (12,283) 
 Interest paid                                               (1,108)        (1,492) 
-----------------------------------------------------  -------------  ------------- 
 Net cash used in financing activities                       (6,312)        (7,124) 
-----------------------------------------------------  -------------  ------------- 
 
 Net increase in cash and cash equivalents                    10,013            148 
 Cash and cash equivalents at beginning 
  of period                                                    2,534          1,379 
-----------------------------------------------------  -------------  ------------- 
 Cash and cash equivalents at end of the 
  period                                                      12,547          1,527 
-----------------------------------------------------  -------------  ------------- 
 

Anglo Asian Mining plc

Condensed group statement of changes in equity

Six months ended 30 June 2018

(Unaudited)

 
 
                                                Share-based                Retained 
                             Share      Share       payment     Merger    earnings/     Total 
                           capital    premium       reserve    reserve       (loss)    equity 
                              $000       $000          $000       $000         $000      $000 
---------------------  -----------  ---------  ------------  ---------  -----------  -------- 
 1 January 2018              2,008     32,484            74     46,206        4,581    85,353 
 Profit for the 
  period                         -          -             -          -        5,076     5,076 
 Share based payment             -          -             -          -            -         - 
---------------------  -----------  ---------  ------------  ---------  -----------  -------- 
 30 June 2018                2,008     32,484            74     46,206        9,657    90,429 
---------------------  -----------  ---------  ------------  ---------  -----------  -------- 
 

Six months ended 30 June 2017

(Unaudited)

 
                                                Share-based                Retained 
                             Share      Share       payment     Merger    earnings/     Total 
                           capital    premium       reserve    reserve       (loss)    equity 
                              $000       $000          $000       $000         $000      $000 
---------------------  -----------  ---------  ------------  ---------  -----------  -------- 
 1 January 2017              1,993     32,325           154     46,206        1,968    82,646 
 Loss for the period             -          -             -          -      (2,742)   (2,742) 
 Share based payment             -          -             7          -            -         7 
---------------------  -----------  ---------  ------------  ---------  -----------  -------- 
 30 June 2017                1,993     32,325           161     46,206        (774)    79,911 
---------------------  -----------  ---------  ------------  ---------  -----------  -------- 
 

Anglo Asian Mining plc

Notes to the condensed group financial statements

Six months ended 30 June 2018

   1    General information 

Anglo Asian Mining plc (the "Company") is a company incorporated in England and Wales under the Companies Act 2006. The Company's ordinary shares are traded on the AIM market of the London Stock Exchange plc. The Company is a holding company. The principal activity of the Company and its subsidiaries (the "Group") is operating a portfolio of mining operations and metal production facilities within Azerbaijan.

Basis of preparation

The condensed group financial statements for the six month period ending 30 June 2018 have been prepared in accordance with IAS 34 'Interim Financial Reporting' as issued by the International Accounting Standards Board. The information for the half year ended 30 June 2018 does not constitute statutory accounts as defined in section 435 of the Companies Act 2006. A copy of the statutory accounts for the year ended 31 December 2017 has been delivered to the Registrar of Companies. The auditor's report on those accounts was not qualified, did not include a reference to any matters to which the auditor drew attention by way of an emphasis of matter and did not contain a statement under sections 498(2) or 498(3) of the Companies Act 2006. The condensed group financial statements have not been audited.

The condensed group financial statements have been prepared under the historical cost convention except for the treatment of share based payments. The condensed group financial statements are presented in United States dollars ("$") and all values are rounded to the nearest thousand except where otherwise stated. In the condensed group financial statements "GBP" and "pence" are references to the United Kingdom pound sterling and "AZN" is a reference to the Azerbaijan New Manat.

Accounting policies

The annual financial statements of Anglo Asian Mining plc are prepared in accordance with IFRSs as issued by the International Accounting Standards Board and as adopted by the European Union. The condensed group financial statements included in this half-yearly financial report have been prepared in accordance with IAS 34 'Interim Financial Reporting' as issued by the International Accounting Standards Board and adopted by the European Union.

The accounting policies adopted in the 2018 half-yearly condensed group financial statements are the same as adopted in the 2017 annual report and accounts, other than those in respect of new and revised standards that became effective from 1 January 2018 as follows:

IFRS 9 'Financial Instruments'

In July 2014, the IASB issued the final version of IFRS 9 'Financial Instruments' that replaces IAS 39 and all previous versions of IFRS 9. IFRS 9 brings together all three aspects of the accounting for the financial instruments project; classification and measurement, impairment and hedge accounting. IFRS 9 is effective for annual periods beginning on or after 1 January 2018, with early adoption permitted. Except for hedge accounting, retrospective application is required, but the provision of comparative information is not compulsory. For hedge accounting, the requirements are generally applied prospectively, with some limited exceptions.

The Group adopted the new standard on the required effective date. The Group assessed the impacts of implementing IFRS 9 but these were not significant. The Group's only significant financial instruments are cash and cash equivalents, trade and other debtors, interest bearing loans payable and trade creditors. The Group does not have any long term loans, equity instruments or "non-vanilla" financial assets or liabilities or currently carry out any hedging activity. All financial instruments are included in the Group's statement of financial position at values which approximate to their fair value. IFRS 9 has not had any effect on the classification, initial recognition or subsequent measurement of the Group's financial instruments.

IFRS 9 requires the Group to use an expected credit loss model for its trade receivables measured at amortised cost. The Group has applied the simplified approach and record lifetime expected losses on all trade receivables measured at amortised cost. The short term nature of these receivables means that these changes did not have a significant impact.

IFRS 15 'Revenue from Contracts with Customers'

IFRS 15 was issued in May 2014 and amended in April 2016, and establishes a five-step model to account for revenue arising from contracts with customers. Under IFRS 15, revenue is recognised at an amount that reflects the consideration to which an entity expects to be entitled in exchange for transferring goods or services to a customer. The new revenue standard will supersede all current revenue recognition requirements under IFRS. Either a full retrospective application or a modified retrospective application is required for annual periods beginning on or after 1 January 2018. Early adoption is permitted.

The Group adopted the new standard on the required effective date using the modified retrospective method. The Group assessed the impact of the changes of IFRS 15, but these were not materially significant. The only significant revenues of the Group are sales of gold and silver bullion to its gold refiner and sales of copper concentrate to its off-taker. In both cases, sales are only recognised when the buyer takes physical possession of the goods and priced at the current market price as follows:

-- Sales of gold and silver bullion are only made when the precious metals are physically at the refinery and at the spot metal price on date of sale.

-- Sales of each shipment of copper concentrate are invoiced when the off-taker takes physical delivery of each shipment at the Group's factory gate and provisionally priced using a recent prior period average metal price. A final invoice for each shipment is issued within the next one to two months and is again priced using a recent prior period average metal price. The Group does not separately account for the embedded derivate in each transaction as the short one to two month transaction cycle would result in any change to the Group's financial statements being immaterial.

The adoption of these standards has had no material impact on the 2018 half-yearly condensed group financial statements. The Group also plans to implement IFRS 16 "leases" for accounting periods commencing after 1 January 2019:

IFRS 16 'Leases'

IFRS 16 was issued in January 2016 and it replaces IAS 17 'Leases', IFRIC 4 'Determining whether an Arrangement contains a lease', SIC - 15 'Operating Leases - Incentives' and SIC -27 'Evaluation the Substance of Transactions Involving the Legal Form of a lease', IFRS 16 sets out the principles for the recognition measurement, presentation and disclosure of leases and requires lessees to account for all leases under a single on balance sheet model similar to the accounting for finance leases under IAS 17. The standard includes two recognition exemptions for lessees - leases of 'low-value' assets (e.g. personal computers) and short-term leases (i.e. Ieases with a lease term of 12 months or less). At the commencement date of a lease, a lessee will recognise a liability to make lease payments (i.e. the lease liability) and an asset representing the right to use the underlying asset during the lease term (i.e. the right-of-use asset). Lessees will be required to separately recognise the interest expense on the lease liability and the depreciation expense on the right-of-use asset.

Lessees will be also required to remeasure the lease liability upon the occurrence of certain events (e.g. a change in the lease term or a change in future lease payments resulting from a change in an index or rate used to determine those payments). The lessee will generally recognise the amount of the remeasurement of the lease liability as an adjustment to the right-of-use asset.

Lessor accounting under IFRS 16 is substantially unchanged from today's accounting under IAS 17. Lessors will continue to classify all leases using the same classification principle as in IAS 17 and distinguish between two types of leases: operating and finance leases.

IFRS 16 also requires lessees and lessors to make more extensive disclosures than under IAS 17.

IFRS 16 is effective for annual periods beginning on or after 1 January 2019. Early application is permitted, but not before an entity applies IFRS 15. A lessee can choose to apply the standard using either a full retrospective or a modified retrospective approach. The standard's transition provisions permit certain reliefs.

As disclosed in note 12 below, the Group has no significant leases and therefore IFRS 16 is not expected to have any materially significant effect on its financial statements.

Going concern

The directors have prepared the condensed group financial statements on a going concern basis after reviewing the Group's forecast cash position for the period to 30 September 2019 and satisfying themselves that the Group will have sufficient funds on hand to realise its assets and meet its obligations as and when they fall due.

The Group's cash resources have substantially increased and its liquidity improved in the six months to 30 June 2018. The Group has generated significant amounts of cash and reduced its indebtedness and currently has net cash. The majority of its remaining debt has been refinanced with a syndicated loan at a lower interest rate. The Group no longer has any borrowings which are subject to financial covenants and all debt is unsecured.

The Group's business activities, together with the factors likely to affect its future development, performance and position, can be found within the chairman's statement and strategic report above. The financial position of the Group, its cash flow, liquidity position and borrowing facilities are discussed in the financial review above.

After making due enquiry, the directors have satisfied themselves that it is appropriate to adopt the going concern basis in preparing the condensed group financial statements.

   2    Operating segments 

The Group determines operating segments based on the information that is internally provided to the Group's chief operating decision maker. The chief operating decision maker has been identified as the board of directors. The board of directors currently considers consolidated financial information for the entire Group and reviews the business based on the Group income statement and Group statement of financial position in their entireties. Accordingly, the Group has only one operating segment, mining operations. The mining operations comprise the Group's major producing asset, the open cast and underground mines located at the Gedabek and Gosha licence areas, which account for all the Group's revenues and the majority of its cost of sales, depreciation and amortisation. The Group's mining operations are all located within Azerbaijan and therefore all within one geographic segment.

All sales of gold and silver bullion are made to one customer, the Group's gold refinery, MKS Finance SA, based in Switzerland. Copper concentrate is sold to Industrial Minerals SA.

   3    Income tax 

The income taxation charge in the 6 months ended 30 June 2018 represents a current income tax charge of $2.5m (2017:$nil) and a deferred taxation charge of $0.5m (2017:$1.4m). These current and deferred taxation charges are in respect of the representative office registered in Azerbaijan of RV Investment Group Services LLC (a wholly owned subsidiary of the Company). The taxable profits of the operating company in Azerbaijan are taxed at 32 per cent. However, the overall tax rate is higher than 32 per cent. because the UK administrative costs and depreciation of mining rights in Azerbaijan cannot be offset against the taxable profits arising in Azerbaijan.

The deferred taxation asset or liability is calculated at the taxation rates that are expected to apply in the period when the liability is settled or the asset is realised. Deferred taxation is charged or credited in the income statement, except when it relates to items charged or credited directly to equity, in which case the deferred taxation is also dealt with in equity.

Deferred taxation assets and liabilities are offset when there is a legally enforceable right to offset current taxation assets against current taxation liabilities and when they relate to income taxes levied by the same taxation authority and the Group intends to settle its current taxation assets and liabilities on a net basis.

At the statement of financial position date, the Group has unused taxation losses within the Company and a subsidiary (Anglo Asian Operations Limited) available for offset against future profits. No deferred taxation asset has been recognised in respect of such losses due to the unpredictability of future profit streams. Unused taxation losses may be carried forward indefinitely.

   4    Profit / (loss) per ordinary share 
 
                                           6 months            6 months 
                                                 to                  to 
                                            30 June             30 June 
                                               2018                2017 
                                        (unaudited)         (unaudited) 
 Profit / (loss) per ordinary                  $000                $000 
  share 
 
 Profit / (loss) after tax 
  for the period                              5,076             (2,742) 
 Basic profit / (loss) per 
  share (US cents)                             4.46              (2.44) 
 Diluted profit /(loss) 
  per share (US cents)                         4.45              (2.43) 
                                      -------------       ------------- 
 
 
 Weighted average number                     Number              Number 
  of shares 
------------------------------  ----  -------------  ---  ------------- 
 
 For basic earnings per 
  share                                 113,761,024         112,661,024 
 For diluted earnings per 
  share                                 114,080,623         112,741,024 
 
 
 
 
   5    Intangible assets 
 
 
                       Exploration     Exploration                         Other 
                      & evaluation    & evaluation         Mining     intangible 
                           Gedabek         Ordubad         rights         assets            Total 
                       (unaudited)     (unaudited)    (unaudited)    (unaudited)      (unaudited) 
                              $000            $000           $000           $000             $000 
-------------------  -------------  --------------  -------------  -------------  --------------- 
 Cost 
 1 January 2017                191           4,028         41,925            498           46,642 
 Additions                     919             125              -             31            1,075 
 31 December 2017            1,110           4,153         41,925            529           47,717 
 Additions                       -              92              -              -               92 
-------------------  -------------  --------------  -------------  -------------  --------------- 
 30 June 2018                1,110           4,245         41,925            529           47,809 
-------------------  -------------  --------------  -------------  -------------  --------------- 
 
 Amortisation and 
  impairment 
 1 January 2017                  -               -         29,469            325           29,794 
 Charge for year                 -               -          1,738             40            1,778 
 31 December 2017                -               -         31,207            365           31,572 
 Charge for period               -               -            970             16              986 
-------------------  -------------  --------------  -------------  -------------  --------------- 
 30 June 2018                    -               -         32,177            381           32,558 
-------------------  -------------  --------------  -------------  -------------  --------------- 
 
 Net book value 
 31 December 2017            1,110           4,153         10,718            164         16,145 
-------------------  -------------  --------------  -------------  -------------  ------------- 
 30 June 2018                1,110           4,245          9,748            148         15,251 
-------------------  -------------  --------------  -------------  -------------  ------------- 
 
 
   6    Property, plant and equipment 
 
 
                                 Plant 
                                   and 
                             equipment                         Assets 
                             and motor      Producing           under 
                              vehicles          mines    construction          Total 
                           (unaudited)    (unaudited)     (unaudited)    (unaudited) 
                                  $000           $000            $000           $000 
-----------------------  -------------  -------------  --------------  ------------- 
 Cost 
 1 January 2017                 21,465        183,433             435        205,333 
 Additions                         434          4,559           5,175         10,168 
 Transfer to producing 
  mines                              -          1,229         (1,229)              - 
 Decrease in provision 
  for 
  rehabilitation                     -          (249)               -          (249) 
 31 December 2017               21,899        188,972           4,381        215,252 
 Additions                         147          4,946           2,291          7,384 
 Transfer to producing 
  mines                              -          4,235         (4,235)              - 
 Decrease in provision 
  for rehabilitation                 -          (349)               -          (349) 
 30 June 2018                   22,046        197,804           2,437        222,287 
-----------------------  -------------  -------------  --------------  ------------- 
 
 Depreciation and 
  impairment 
 1 January 2017                 14,656         92,201               -        106,857 
 Charge for year                 1,765         19,243               -         21,008 
 31 December 2017               16,421        111,444               -        127,865 
 Charge for period                 788          7,668               -          8,456 
-----------------------  -------------  -------------  --------------  ------------- 
 30 June 2018                   17,209        119,112               -        136,321 
-----------------------  -------------  -------------  --------------  ------------- 
 
 
 Net book value 
 31 December 2017                5,478         77,528           4,381         87,387 
-----------------------  -------------  -------------  --------------  ------------- 
 30 June 2018                    4,837         78,692           2,437         85,966 
-----------------------  -------------  -------------  --------------  ------------- 
 
 
   7    Trade and other receivables 
 
 
                                       30 June 2018         30 June      31 December 
                                        (unaudited)            2017             2017 
  Non-current assets                           $000     (unaudited)        (audited) 
                                                               $000             $000 
------------------------------------  -------------  --------------  --------------- 
 Advances for fixed asset purchases           1,244           1,228              860 
 Loans                                           15              44               15 
------------------------------------  -------------  --------------  --------------- 
                                              1,259           1,272              875 
------------------------------------  -------------  --------------  --------------- 
 
 Current assets 
------------------------------------  -------------  --------------  ------------- 
 Gold held due to the Government 
  of Azerbaijan                              11,720          13,640          7,445 
 VAT refund due                                 206             217            206 
 Other tax receivable                           811             908            891 
 Trade receivables                              994           1,159            440 
 Prepayments and advances                     1,275           2,409          2,187 
 Loans                                          107              88            107 
                                             15,113          18,421         11,276 
------------------------------------  -------------  --------------  ------------- 
 
 

The directors consider that the carrying amount of trade and other receivables approximates to their fair value.

The VAT refunds due relate to VAT paid on purchases.

Gold bullion held and transferable to the Government of Azerbaijan is bullion held by the Group due to the Government of Azerbaijan. The Group holds the Government's share of the product from its mining activities and from time to time transfers that product to the Government of Azerbaijan. A corresponding liability to the Government of Azerbaijan is included in trade and other payables as disclosed in note 9.

The Group does not consider any trade and other receivables as past due or impaired.

   8     Inventory 
 
 
                                           30 June 2018         30 June    31 December 
                                            (unaudited)            2017           2017 
                                                   $000     (unaudited)      (audited) 
                                                                   $000           $000 
----------------------------------------  -------------  --------------  ------------- 
 Cost 
 Finished goods - bullion                         3,610           1,264          2,059 
 Finished goods - metal in concentrate               82             755            489 
 Metal in circuit                                12,044          13,763         13,476 
 Ore stockpiles                                   3,699           7,921          6,753 
 Spare parts and consumables                     11,598          10,526         11,203 
----------------------------------------  -------------  --------------  ------------- 
 Total current inventories                       31,003          34,229         33,980 
----------------------------------------  -------------  --------------  ------------- 
 Total inventories at the lower 
  of cost and net realisable value               31,003          34,229         33.980 
----------------------------------------  -------------  --------------  ------------- 
 
 
 

Current ore stockpiles consist of high-grade and low-grade oxide ores that are expected to be processed during the 12 months subsequent to the balance sheet date.

Inventory is recognised at lower of cost or net realisable value.

   9   Trade and other payables 
 
                                           30 June 2018                       31 December 
                                            (unaudited)                              2017 
                                                   $000             30 June 
                                                           2017 (unaudited)     (audited) 
                                                                       $000          $000 
-----------------------------------------  ------------  ------------------  ------------ 
 Accruals and other payables                      4,777               3,626         3,979 
 Trade creditors                                  3,595               6,931         3,431 
 Gold held due to the Government 
  of Azerbaijan                                  11,720              13,640         7,445 
 Payable to the Government of Azerbaijan 
  from copper concentrate joint sale              1,295               2,337           315 
-----------------------------------------  ------------  ------------------  ------------ 
                                                 21,387              26,534        15,170 
-----------------------------------------  ------------  ------------------  ------------ 
 

Trade creditors primarily comprise amounts outstanding for trade purchases and ongoing costs. Trade creditors are non-interest bearing. Accruals and other payables mainly consist of accruals made for accrued but not paid salaries, bonuses, related payroll taxes and social contributions, accrued interest on borrowings, and services provided but not billed to the Group by the end of the reporting period. The directors consider that the carrying amount of trade and other payables approximates to their fair value.

The amount payable to the Government of Azerbaijan from copper concentrate joint sale represents the portion of cash received from the customer for the government's portion from the joint sale of copper concentrate.

   10   Interest-bearing loans and borrowings 
 
 Amortised cost 
 
 
                                    30 June 2018             30 June       31 December 
                                     (unaudited)    2017 (unaudited)    2017 (audited) 
                                            $000                $000              $000 
----------------------------------  ------------  ------------------  ---------------- 
 International Bank of Azerbaijan 
  - agitation leaching plant loan              -               3,875             1,640 
 International Bank of Azerbaijan 
  - loan facilities                            -                 510               481 
 Gazprombank (Switzerland) Ltd                 -               6,180             3,700 
 Amsterdam Trade Bank                          -               6,180             3,700 
 Atlas Copco - vendor financing                -                 550               303 
 Yapi Kredit Bank                              -               2,623             2,254 
 Pasha Bank - refinancing loan            11,813                   -                 - 
 Pasha Bank - other loans                  2,632               6,190             3,713 
 Kapital Bank                              1,000                 545             1,000 
 Director                                      -               3,860             3,860 
----------------------------------  ------------  ------------------  ---------------- 
 Total interest bearing loans 
  and borrowings                          15,445              30,513            20,651 
----------------------------------  ------------  ------------------  ---------------- 
 
 Loans repayable in less than 
  one year                                10,382              26,047            20,051 
 Loans repayable in more than 
  one year                                 5,063               4,466               600 
----------------------------------  ------------  ------------------  ---------------- 
 Total interest bearing loans 
  and borrowings                          15,445              30,513            20,651 
                                                                      ---------------- 
 
 
 

International Bank of Azerbaijan ("IBA")

Agitation leaching plant loan

In 2012 and 2013, the Group borrowed $49.5 million under a series of loan agreements to finance the construction of its agitation leaching plant. The annual interest rate for each agreement is 12 per cent. The repayment of principal began two years from the withdrawal date for each agreement. The loans were partially repaid by the proceeds of a refinancing loan from Amsterdam Trade Bank. Repayment commenced on 31 March 2015 and the loans were fully repaid in the period ended 30 June 2018.

Loan facilities

In 2016, the Group entered into two credit facilities with IBA:

-- AZN1 million at an annual interest rate of 18 per cent. The interest and principal were repayable on a reducing balance basis in 12 equal monthly installments of AZN92,000. The final installment was repaid in January 2017.

-- $1.5 million at an annual interest rate of 12 per cent. The interest and principal are repayable on a reducing balance basis in 24 equal monthly installments of $71,000 and the final installment was repaid in February 2018.

Amsterdam Trade Bank ("ATB") and Gazprombank (Switzerland) Ltd ("GPBS")

During 2013, the Group entered into a loan agreement for $37.0 million to refinance its agitation leaching plant loan from IBA. The annual interest rate is 8.25 per cent. plus LIBOR. Principal is repayable in 15 equal quarterly installments of $2,467,000. The first payment of principal commenced in February 2015 with the final installment payable in August 2018. The Group has pledged to ATB its present and future claims against MKS Finance SA, the Group's sole buyer of gold doré until termination of the loan agreement.

On 15 February 2017, a transaction was finalised to transfer 50 per cent. of the balance of the loan being $8.6 million to GPBS. The terms of the loan and security remained unchanged and ATB will act as agent to administer the loan on behalf of ATB and GPBS.

The balance of the loans payable to ATB and GPBS was repaid early in the six months to 30 June 2018. Following repayment, the pledge to ATB over the Group's present and future claims against MKS Finance SA was cancelled.

Atlas Copco

The amounts outstanding are in respect of vendor equipment financing. The amount outstanding at 31 December 2015 was repaid in July 2016. In 2016, the Group entered into further vendor equipment financing for Euro 1.1 million at an annual interest rate of 8.14 per cent. The principal was repayable quarterly in 8 equal installments which commenced on 31 August 2016 with the final repayment on 31 May 2018.

Yapi Credit Bank, Azerbaijan ("YCBA")

The Group has entered into several credit facilities with YCBA. The annual interest rate for each facility is 10 to 11 per cent. and each facility is repayable in 12 equal monthly installments on a reducing balance basis starting one month after drawdown. In 2016, new credit facilities were entered into totaling $1,488,000 (2015: $1,929,000).

In the 6 months to 30 June 2017, the Group entered into further credit facilities with YCBA. These totaled $2.7 million and the interest rate for each loan was 9.5 per cent. One loan for $0.5 million, which commenced in January 2017, is repayable in 12 equal monthly installments. The remaining loans totaling $2.2 million are all for a duration of 12 months with repayment of principal at the end of the loan with interest payable monthly.

All outstanding loans with YCBA were repaid in the six months ended 30 June 2018.

Pasha Bank

Refinancing loan

On 8 February 2018 a subsidiary of the Group, Azerbaijan International Mining Company Limited, entered into a refinancing agreement with Pasha Bank OJSC, as arranger, for a syndicated loan facility for up to $15 million to refinance the majority of the Group's existing loans. The significant terms of the loan were as follows:

-- Two-year term loan facility for up to $15 million at 7 per cent. per annum fixed interest rate;

   --          The loan facility is unsecured and there are no financial covenants; 
   --          Total arrangement fee of 0.25 per cent. of the amount borrowed; and 
   --          Early repayment is permitted. 

A total of $13.5 million of the facility was drawn-down on the 9 and 12 of February 2018 and used to repay the following loans:

   --          $2.2 million to Yapi Credit Bank; 
   --          $3.7 million to Amsterdam Trade Bank N. V.; 
   --          $3.7 million to Gazprombank (Switzerland) Ltd; and 
   --          $3.9 million to the Chief Executive. 

The transaction was completed by the end of March 2018.

Other loans

The Group entered into loans with Pasha Bank in 2016 at annual interest rates and maturities as in the following table. No principal repayment had been made in respect of any of these loans in 2016.

 
    Loan value           Term          Interest                        Principal repayment 
     $000            (months)              rate 
                                    (per cent.) 
                                                          2 equal instalments in March and 
    1,000                  18                 7                             September 2017 
                -------------  ----------------  ----------------------------------------- 
    1,500                  12                 9                              November 2017 
                -------------  ----------------  ----------------------------------------- 
      916                  24                 7      7 equal instalments, 2017 - $525,000; 
                                                                           2018 - $391,000 
                -------------  ----------------  ----------------------------------------- 
                                                           2 equal instalments January and 
    2,100                   2                14                              February 2017 
                -------------  ----------------  ----------------------------------------- 
                                                           2 equal instalments January and 
      419                   2                18                              February 2017 
                -------------  ----------------  ----------------------------------------- 
 

All of the above loans were repaid in 2017 with the exception of the loan for $916,000 of which $713,000 was outstanding at 31 December 2017.

In 2017, the Group entered into a $3.0 million loan agreement with Pasha Bank at an interest rate of 8.5 per cent. The interest is payable monthly and the principal is repayable in 5 equal installments of $600,000 payable in in April, July, August and October 2018 and January 2019.

Kapital Bank

In December 2016, the Group entered into a working capital credit facility for $1 million with Kapital Bank. The facility is for one year with an annual interest rate of 7 per cent. Interest is payable monthly and the principal is repayable by 4 equal quarterly monthly installments commencing March 2017.

The loan was renewed in December 2017 on the same terms but early repayment of the balance of the loan was made in July 2018.

Director

On 20 May 2015, the chief executive of Anglo Asian Mining PLC provided a $4 million loan facility to the Group. Any loan from the facility was repayable on 8 January 2016 at an interest rate of 10 per cent. The loan was extended during 2016 and 2017 on the same terms till 8 January 2018. On January 2018, the term of the loan was extended for one year until 8 January 2019. The interest rate on the loan was reduced to 7 per cent., and all other terms of the loan remained unchanged. In March 2018, the loan was repaid from the proceeds of the Pasha Bank OSJC refinancing loan.

Unused credit facilities

The Group had no unused credit facilities at 30 June 2018 (30 June 2017: $nil; 31 December 2017: $nil).

11 Share capital

 
                                                shares   US$000 
----------------------------------------  ------------  ------- 
 Ordinary shares issued and fully paid: 
 1 January 2017                            112,661,024    1,993 
 Exercise of share options                   1,100,000       15 
----------------------------------------  ------------  ------- 
 31 December 2017 and 30 June 2018         113,761,024    2,008 
----------------------------------------  ------------  ------- 
 

12 Contingencies and commitments

The Group undertakes its mining operations in the Republic of Azerbaijan pursuant to the provisions of the Agreement on the Exploration, Development and Production Sharing for the Prospective Gold Mining Areas: Gedabek, Gosha, Ordubad Group (Piazbashi, Agyurt, Shakardara, Kiliyaki), Soutely, Kyzilbulag and Vejnali Deposits dated year ended 20 August 1997 (the "PSA"). The PSA contains various provisions relating to the obligations of the R.V. Investment Group Services LLC ("RVIG"), a wholly owned subsidiary of the Company. The principal provisions are regarding the exploration and development programme, preparation and timely submission of reports to the Government, compliance with environmental and ecological requirements. The Directors believe that RVIG is in compliance with the requirements of the PSA. The Group has announced a discovery on Gosha Mining Property in February 2011 and submitted the development programme to the Government according to the PSA requirements, which was approved in 2012. In April 2012 the Group announced a discovery on the Ordubad Group of Mining Properties and submitted the development programme to the Government for review and approval according to the PSA requirements. The Group and the Government are still discussing the formal approval of the development programme.

The mining licence on Gedabek expires in March 2022, with the option to extend the licence by ten years conditional upon satisfaction of certain requirements stipulated in the PSA.

RVIG is also required to comply with the clauses contained in the PSA relating to environmental damage. The directors believe RVIG is substantially in compliance with the environmental clauses contained in the PSA.

In accordance with a pledge agreement signed on 24 July 2013, the Group is a guarantor for one of its suppliers, Azerinterpartlayish-X MMC for a loan from the International Bank of Azerbaijan in the amount of AZN500,000 for an initial 36 months. The pledge agreement was extended in 2016 till 1 July 2018. The amount of the loan at outstanding at 30 June 2018 was AZN23,000 (30 June 2017: AZN 271,000 and 31 December 2017: AZN 125,750).

There were no significant operating lease and no capital lease commitments at 30 June 2018 (30 June 2017 and 31 December 2017: $nil).

13 Related party transactions

Transactions between the Company and its subsidiaries, which are related parties, have been eliminated on consolidation and are not disclosed in this note. Transactions between the Group and other related parties are disclosed below.

Trading transactions

During the period, there were no trading transactions between group companies and related parties who are not members of the Group.

Other related party transactions

a) Total payments in the 6 months to 30 June 2018 of $843,000 (6 months to 30 June 2017: $442,000) were made for equipment and spare parts purchased from Proses Muhendislik Danismanlik Inshaat ve Tasarim Anonim Shirket ("PMDI"), an entity in which the chief technical officer of Azerbaijan International Mining Company has a direct ownership interest. There is an outstanding payable to PMDI of $400,000 at 30 June 2018 (30 June 2017: advance of $35,000 and 31 December 2017: advance of $34,000).

b) On 20 May 2015, the chief executive made a $4 million loan facility available to the Group. The interest accrued and unpaid at 30 June 2017 was $672,000 (30 June 2016: $394,000 and 31 December 2016: $385,000). The loan was fully repaid in the six months ended 30 June 2018.

   14   Post Balance sheet events 

On 13 July, 2018 a circular was sent to shareholders - "Proposed Capital Reduction and Notice of General Meeting". A resolution was included in the circular that proposed the Company's share premium account be cancelled. This resolution was approved by shareholders on 30 July, 2018 and by the court on 28 August, 2018. The cancellation of the entire share premium account resulted in the amount of $32.6 million (being the amount of the share premium account at 28 August 2018) being credited to the retained earnings of the Company and Group.

The directors have declared an interim dividend in respect of the year ending 31 December 2018 of US cents 3 per share payable on 8 November 2018.

15 Approval of condensed group financial statements

The condensed group financial statements of Anglo Asian Mining plc and its subsidiaries for the six month period ended 30 June 2018 were authorised for issue in accordance with a resolution of the directors on 18 September 2018.

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

**ENDS**

For further information please visit www.angloasianmining.com or contact:

 
 Reza Vaziri        Anglo Asian Mining plc       Tel: +994 12 596 3350 
                                                 Tel: +994 502 910 
 Bill Morgan        Anglo Asian Mining plc        400 
                   ---------------------------  ---------------------- 
                                                 Tel: +994 502 916 
 Stephen Westhead   Anglo Asian Mining plc        894 
                   ---------------------------  ---------------------- 
 Ewan Leggat        SP Angel Corporate Finance   Tel: +44 (0) 20 3470 
                     LLP                          0470 
                     Nominated Adviser and 
                     Broker 
                   ---------------------------  ---------------------- 
 Soltan Tagiev      SP Angel Corporate Finance   Tel + 44 (0) 20 3470 
                     LLP                          0470 
                   ---------------------------  ---------------------- 
 Susie Geliher      St Brides Partners Ltd       Tel: +44 (0) 20 7236 
                                                  1177 
                   ---------------------------  ---------------------- 
 Lottie Wadham      St Brides Partners Ltd       Tel: +44 (0) 20 7236 
                                                  1177 
                   ---------------------------  ---------------------- 
 

Notes:

Anglo Asian Mining plc (AIM:AAZ) is a gold, copper and silver producer in Central Asia with a broad portfolio of production and exploration assets in Azerbaijan. The Company has a 1,962 square kilometre portfolio, assembled from analysis of historic Soviet geological data and held under a Production Sharing Agreement modelled on the Azeri oil industry.

The Company's main operating location is the Gedabek contract area ("Gedabek") which is a 300 square kilometre area in the lesser Caucasus mountains in western Azerbaijan. The Company developed Azerbaijan's first operating gold/copper/silver mine at Gedabek which commenced gold production in May 2009. Mining at Gedabek was initially from its main open pit which is an open cast mine with a series of interconnected pits. The Company also operates the high grade Gadir underground mine which is co-located at the Gedabek site, In September 2017, production commenced at the Ugur open pit mine, a recently discovered gold ore deposit at Gedabek. The Company has a second underground mine, Gosha, which is 50 kilometres from Gedabek. Ore mined at Gosha is processed at Anglo Asian's Gedabek plant.

The Company produced 71,461 gold equivalent ounces ('GEOs') for the year ended 31 December 2017. Gedabek is a polymetallic ore deposit that has gold together with significant concentrations of copper in the main open pit mine, and an oxide gold-rich zone at Ugur. The Company therefore employs a series of flexible processing routes to optimise metal recoveries and efficiencies. The Company produces gold doré through agitation and heap leaching operations, copper concentrate from its Sulphidisation, Acidification, Recycling, and Thickening (SART) plant and also a copper and precious metal concentrate from its flotation plant, which is processing tailings from the agitation leach plant. A second dedicated crusher line has recently been commissioned and is now in operation for the flotation plant to enable it to operate independently of the agitation leaching plant.

The Company has forecast production for FY 2018 of between 78,000 to 84,000 GEOs an increase for the mid-point of this guidance of over 13 per cent. compared to FY 2017 production of 71,461 GEOs.

Anglo Asian is also actively seeking to exploit its first mover advantage in Azerbaijan to identify additional projects, as well as looking for other properties in order to fulfil its expansion ambitions and become a mid-tier gold and copper metal production company.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

END

IR SFUFEAFASESU

(END) Dow Jones Newswires

September 19, 2018 02:00 ET (06:00 GMT)

1 Year Anglo Asian Mining Chart

1 Year Anglo Asian Mining Chart

1 Month Anglo Asian Mining Chart

1 Month Anglo Asian Mining Chart

Your Recent History

Delayed Upgrade Clock