ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

AAOG Anglo African Oil & Gas Plc

0.30
0.00 (0.00%)
04 Dec 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Anglo African Oil & Gas Plc LSE:AAOG London Ordinary Share GB00BD0Q3L08 ORD 0.1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.30 - 0.00 00:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Anglo African Oil & Gas Share Discussion Threads

Showing 8251 to 8274 of 9375 messages
Chat Pages: Latest  339  338  337  336  335  334  333  332  331  330  329  328  Older
DateSubjectAuthorDiscuss
27/9/2019
07:00
Furthermore, with the licence covering an area of 50.51 sq km, the Company has already identified multiple follow-up drill locations that can be targeted, once well TLP-103C has been brought into production, to generate further cash flow.

👍👍👍👍

338
27/9/2019
06:59
It is this combination of the low-risk production story provided by the shallower R1/R2/R3 and Mengo formations, and the significant exploration upside potential offered by the Djeno, that attracted us to Tilapia in the first place.

👍👍👍

338
27/9/2019
06:58
TLP-103C has already proven the geological model and confirmed the presence of the Djeno at Tilapia. The fallback plan is to produce TLP-103C from the Mengo formation. At current oil prices, a daily production rate of, say, 500/bopd from the Mengo would generate material levels of cash flow for AAOG.

👍👍

338
27/9/2019
06:57
The sidetrack operations have an attractive risk/reward profile.


👍

338
27/9/2019
06:31
Think it will float around these levels or lower until license and rig announcements.

No mention of Nov in this RNS. Glaring by its omission. It will most probably be next year when they see that rig on site.

croxonopolis
27/9/2019
05:44
The pot and kettle... As is said since I arrived 100 percent of your posts have been drivel.. I guess what you are saying is none of that drivel can be used to back up your "95% Accuracy" all I need to do is look how you knew everything on PVR and look how that turned out for you :)
ddonaldson2
26/9/2019
22:15
Apart from not being in any great position to suggest that someone may be lying, the Interims are due - you blundering buffoon.
tameimpaler
26/9/2019
19:51
Hope you are not lying Nicola
seagreen
26/9/2019
18:19
On a Friday!? What, more bad news?
croxonopolis
26/9/2019
16:19
Rns in the morning.
apfindley
26/9/2019
15:23
Tameimpaler

Are you being specific to AAOG?

You are describing the bulk of the UK oil and gas companies.

honestmarty
26/9/2019
14:56
... hopefully in less than 1,000 words.
tameimpaler
26/9/2019
14:19
Its the Jeremy and Jo show all we want is Nicola and you can all spout rubbish together .....still no contribution...hey ho...we could play guess the percentage interest on the new licence but I would be cheating as you would as you all know everything
seagreen
26/9/2019
11:21
I'm still waiting for Seared aka the messiah to clarify on his 95% accuracy rate.. have heard zilch
ddonaldson2
26/9/2019
10:46
Word-up Seagreen!- I thought all the info was out there on the street already?

Seagreen and his merry band of gimps demanding to bring them up to speed like it's an absolute right.

This just gets funnier by the minute.

tameimpaler
26/9/2019
09:42
Bit like the opposition this lot they can tell you that you are wrong but can not tell you what is right .....and in the words of Boris have made zippo contribution to the debate ...nada ...nil point
seagreen
26/9/2019
09:28
Motion seconded............

Tameimpaler23 Sep '19 - 19:36 - 3642 of 3648
0 3 1
If you don't know where the licence negotiations are up to, or the costs involved Zengas, just ask.

seagreen
26/9/2019
08:41
Come on tampon enligten us with your resesrch what does AAOG hope to be in few weeks.
acuransx
23/9/2019
19:33
It's right up there with "potential facts".Who knew that you could provide such merriment?
tameimpaler
23/9/2019
19:30
Hahaha..."word on the street" that is absolutely priceless.
tameimpaler
23/9/2019
19:15
ROFL. "The word on the street". Haha I heard all the market sellers are talking about it eh Tom.Complete tool. You make all this up as you go along. Again trying to make facts out of nothing but what's in your own head. Baseless nonsense.Go scoff a greasy pizza.
apfindley
23/9/2019
18:56
Zen the current word on the street in congo is that the AAOG are being offered a significantly lower percentage than 47% ...surprised one of the tools don't ring him up and ask but it is price sensitive so they will have to wait until it is renewed......

You can take a donkey to water..............but

seagreen
23/9/2019
18:49
Loving the way that the knowledgeable 338 is trying to spin the sidetrack preparation as per the RNS as the same as drilling for the oil ...they still need a rig to produce oil this is preparation and stabilisation of the site .......not production....

You can read it again below ...another false ramp

From RNS
Anglo African Oil & Gas plc, an independent oil and gas developer, is pleased to announce that well re-entry operations have now commenced at the Tilapia site in Pointe Noire in preparation for drilling the TLP-103C side track, nominated TLP-103CST.

Engineers on site have commenced work to stabilise the well prior to re-entry and the Company has also contracted Wire-Group to supply and install an Isolation Plug which is required to ensure the Company has the necessary barriers in the well and which will enable re-entry. The installation of the Isolation Plug is a rig-less operation, which provides the most cost-effective solution, utilising wireline services from Wire-Group. The isolation plug will be set in preparation for removal of the completion tree which will be replaced by subsurface apparatus more appropriate for drilling and to allow installation of the blow-out preventers ahead of the rig arriving on location.

seagreen
23/9/2019
18:36
If you don't know where the licence negotiations are up to, or the costs involved Zengas, just ask.
tameimpaler
Chat Pages: Latest  339  338  337  336  335  334  333  332  331  330  329  328  Older

Your Recent History

Delayed Upgrade Clock