We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Amur Minerals Corporation | LSE:AMC | London | Ordinary Share | VGG042401007 | ORD NPV |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 0.09 | - | 0.00 | 01:00:00 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
Mineral Royalty Traders | 0 | -3.01M | -0.0022 | -0.41 | 1.25M |
Date | Subject | Author | Discuss |
---|---|---|---|
19/9/2019 06:23 | This test work has been on my mind..It may seem insignificant, but why would the testing need to be put out for competitive tender?.Gipronickel are experts and I am sure the list of testing companies is small and well known by the likes of RY and Tom..What I come up with is that:1. Somebody wants its tested without Norilsk seeing the results.2. The government is somehow involved of which Tendering is normal practice.3. The government is somehow involved of which they want independent verification.There is something going on here as to why this hasn't been done sooner and now going out for Tender. | crazytowner | |
18/9/2019 22:19 | Looks like these guys know what they doing...Project activity is the largest field of application of the strength of the Gipronickel Institute, which has experience in design work in all areas of the mining and metallurgical and concentration complexes, from surveys to factories equipped with modern equipment, as well as auxiliary infrastructure of mines and combines. The Department of Design Work (DPR) of Gipronickel Institute LLC has highly qualified and experienced personnel, is provided with a unified computer network, modern equipment and software, including for the development of design and working documentation using 3D technology, the necessary regulatory and proprietary methodological base adapted to modern design and construction requirements. The main activities of the DPR are: Acting as General Design Organization Development of pre-project documentation: all types of feasibility studies and assessments (feasibility studies for investments in construction, feasibility studies of conditions, fuel and energy resources, thermal power plants, etc.) Integrated underground mine design Comprehensive design of open-cast mining of deposits with the development of mining and processing and metallurgical complexes, including main and auxiliary production Design of industrial buildings and structures and their complexes for various technological purposes I and II level of responsibility Design of administrative buildings and structures and their complexes Development of automated process control systems (ACS TP), operational dispatch control of production (ASODU), power supply (ASODUE), etc. Development of industrial types of communication systems, signaling and data transmission Development of special sections of project documentation Development of special sections of construction organization projects Development of engineering equipment, networks and systems Development of non-standard equipment Development of budget documentation Development of design documentation in areas with complex engineering and geological conditions Development of environmental and sanitary-epidemiolog | qui quaerit reperit | |
18/9/2019 22:12 | What further participation and what purchasing procedure???"The transfer of information to other units of Gipronickel Institute LLC before the announcement of the results of the procurement procedure is not allowed. If these facts are discovered, Gipronickel Institute LLC reserves the right to exclude a potential Supplier from further participation in the Purchasing Procedure" | qui quaerit reperit | |
18/9/2019 22:08 | Invitation...The text of the Application for participation in the procurement procedure must contain an indication of the number of this Invitation to participate in the Procurement Procedure, as well as: "We confirm our participation in the Procurement procedure for the supply of Products in accordance with the requirements presented in the Invitation dated ___________ No. __________, and also express our consent to participate in the procedure in accordance with the specified requirements. The validity period of our proposal is at least 15 working days from the date the deadline for submission of proposals. We agree with the following conditions of the Procurement Procedurehttp://www. | qui quaerit reperit | |
18/9/2019 21:11 | Yes think you rite solis, my thoughts are re gibronickel it’s taken a long time once again to get the bulk sample tested I thought this would have been done by now ! | gizmohican | |
18/9/2019 19:07 | Anyone else remember the Gipronickel Institute LLC from some RNS issued by AMC about them doing some analysis ? Is this the same analysis ? | s0lis | |
18/9/2019 18:35 | The time frame of that work seems so short.A few days to provide a tender and then 7 weeks to do the testing and return the results..Seems strange that Gipronickel are not performing the work themselves as I thought this was their field of expertise. | crazytowner | |
18/9/2019 18:35 | I've saved his email address, will ask him a few questions:) | qui quaerit reperit | |
18/9/2019 18:19 | Looks Like Terd is going under. How long does it have left? | seewhatimean | |
18/9/2019 18:18 | What is Death Spiral Financing?? Death spiral financing is the result of a badly structured convertible financing used to fund primarily small cap companies in the marketplace, causing the company’s stock to fall dramatically, which can lead to the company’s ultimate downfall. | james1955 | |
18/9/2019 18:17 | Over the last 10 years the BOD have failed to deliver... the deposit is still as far underground today as it was back then... We still do not even have the road built to access the deposit... this is YEARS away from production. | james1955 | |
18/9/2019 18:16 | Terrible company. I suspect we are due another LOAN CONVERSION by Death Spiral Financer Riverfort. Shareprice has fell 40% over the last 2 days...It will keep falling. | james1955 | |
18/9/2019 17:29 | I don't know. Would be good to know if a third party is connected somehow though. | nolosstillsell | |
18/9/2019 17:22 | I don't know. Would be good to know if a third party is connected somehow though. | nolosstillsell | |
18/9/2019 17:03 | Third consecutive day of share price collapse. Little correction at end to reflect downward pressure and next placing before 31 October 2019. Sub 2 pence tomorrow I'm afraid. | ebomber | |
18/9/2019 16:56 | I am here buddy, what would you like me to ask them? | qui quaerit reperit |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions