ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

AMC Amur Minerals Corporation

0.09
0.00 (0.00%)
26 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Amur Minerals Corporation LSE:AMC London Ordinary Share VGG042401007 ORD NPV
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.09 - 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Mineral Royalty Traders 0 -3.01M -0.0022 -0.41 1.25M
Amur Minerals Corporation is listed in the Mineral Royalty Traders sector of the London Stock Exchange with ticker AMC. The last closing price for Amur Minerals was 0.09p. Over the last year, Amur Minerals shares have traded in a share price range of 0.08p to 1.895p.

Amur Minerals currently has 1,392,872,315 shares in issue. The market capitalisation of Amur Minerals is £1.25 million. Amur Minerals has a price to earnings ratio (PE ratio) of -0.41.

Amur Minerals Share Discussion Threads

Showing 55276 to 55291 of 68425 messages
Chat Pages: Latest  2221  2220  2219  2218  2217  2216  2215  2214  2213  2212  2211  2210  Older
DateSubjectAuthorDiscuss
19/9/2019
06:23
This test work has been on my mind..It may seem insignificant, but why would the testing need to be put out for competitive tender?.Gipronickel are experts and I am sure the list of testing companies is small and well known by the likes of RY and Tom..What I come up with is that:1. Somebody wants its tested without Norilsk seeing the results.2. The government is somehow involved of which Tendering is normal practice.3. The government is somehow involved of which they want independent verification.There is something going on here as to why this hasn't been done sooner and now going out for Tender.
crazytowner
18/9/2019
22:19
Looks like these guys know what they doing...Project activity is the largest field of application of the strength of the Gipronickel Institute, which has experience in design work in all areas of the mining and metallurgical and concentration complexes, from surveys to factories equipped with modern equipment, as well as auxiliary infrastructure of mines and combines. The Department of Design Work (DPR) of Gipronickel Institute LLC has highly qualified and experienced personnel, is provided with a unified computer network, modern equipment and software, including for the development of design and working documentation using 3D technology, the necessary regulatory and proprietary methodological base adapted to modern design and construction requirements. The main activities of the DPR are: Acting as General Design Organization Development of pre-project documentation: all types of feasibility studies and assessments (feasibility studies for investments in construction, feasibility studies of conditions, fuel and energy resources, thermal power plants, etc.) Integrated underground mine design Comprehensive design of open-cast mining of deposits with the development of mining and processing and metallurgical complexes, including main and auxiliary production Design of industrial buildings and structures and their complexes for various technological purposes I and II level of responsibility Design of administrative buildings and structures and their complexes Development of automated process control systems (ACS TP), operational dispatch control of production (ASODU), power supply (ASODUE), etc. Development of industrial types of communication systems, signaling and data transmission Development of special sections of project documentation Development of special sections of construction organization projects Development of engineering equipment, networks and systems Development of non-standard equipment Development of budget documentation Development of design documentation in areas with complex engineering and geological conditions Development of environmental and sanitary-epidemiological documentation (sections "List of measures for environmental protection", "Environmental Impact Assessment", draft MPE standards for polluting harmful substances in the atmosphere, waste generation standards and limits for their disposal, draft substantiation of the estimated boundaries of sanitary protective zones (SPZ), environmental studies) Support of design documentation with state expertise and coordination at all stages Specialists of design divisions of the Design Department of Gipronickel Institute LLC have extensive experience in developing large complex projects in the conditions of the requirements of the Town Planning Code of the Russian Federation, Decree of the Government of the Russian Federation No. 87 of 02.16.2008, Decree of the Government of the Russian Federation No. 118 of 03.03.2010, which confirmed by the successful passage of the state examination of the Russian Federation of projects completed in the period 2010-2014: GRK "Bystrinskoe. Bystrinsky GOK Uralkali OJSC. Ust-Yayvinsky mine OJSC Kola MMC. Mine "North-Deep". Opening and mining of ore reserves to the mountains. -440m. Increase in ore mining productivity up to 7.5 million tons per year The Komsomolsky mine. Opening and development of the S-2 deposit of the Oktyabrsky field The Zapolyarny mine. Increased production of disseminated ores. OJSC Kola MMC. Combine Severonickel. Cobalt production for the production of 3000 tons / year. The main customer of mining design work is PJSC MMC Norilsk Nickel, which includes the mines: Oktyabrsky, Taimyrsky, Komsomolsky, Mayak, Zapolyarny. The institute pays great attention to environmental issues, in particular, work on environmental impact assessment (EIA). In the period from 1993 to 2012The Institute completed more than 50 large environmental projects for the Polar Division of MMC Norilsk Nickel, Solnechny GOK, Pechenganickel Combine, Severonickel Combine, PO Alumina JSC, Aluminum of Kazakhstan JSC , OJSC Uralkali, LLC Bystrinsky GOK. The Institute's projects, the largest non-ferrous metallurgy enterprises were built: Norilsk Combine, Severonickel Combine, Pechenganickel Combine and other large industrial facilities, both in Russia and abroad
qui quaerit reperit
18/9/2019
22:12
What further participation and what purchasing procedure???"The transfer of information to other units of Gipronickel Institute LLC before the announcement of the results of the procurement procedure is not allowed. If these facts are discovered, Gipronickel Institute LLC reserves the right to exclude a potential Supplier from further participation in the Purchasing Procedure"
qui quaerit reperit
18/9/2019
22:08
Invitation...The text of the Application for participation in the procurement procedure must contain an indication of the number of this Invitation to participate in the Procurement Procedure, as well as: "We confirm our participation in the Procurement procedure for the supply of Products in accordance with the requirements presented in the Invitation dated ___________ No. __________, and also express our consent to participate in the procedure in accordance with the specified requirements. The validity period of our proposal is at least 15 working days from the date the deadline for submission of proposals. We agree with the following conditions of the Procurement Procedurehttp://www.nickel.spb.ru/tenders/0276/???????????%20(????????%20?????).docx
qui quaerit reperit
18/9/2019
21:11
Yes think you rite solis, my thoughts are re gibronickel it’s taken a long time once again to get the bulk sample tested I thought this would have been done by now !
gizmohican
18/9/2019
19:07
Anyone else remember the Gipronickel Institute LLC from some RNS issued by AMC about them doing some analysis ? Is this the same analysis ?
s0lis
18/9/2019
18:35
The time frame of that work seems so short.A few days to provide a tender and then 7 weeks to do the testing and return the results..Seems strange that Gipronickel are not performing the work themselves as I thought this was their field of expertise.
crazytowner
18/9/2019
18:35
I've saved his email address, will ask him a few questions:)
qui quaerit reperit
18/9/2019
18:19
Looks Like Terd is going under.

How long does it have left?

seewhatimean
18/9/2019
18:18
What is Death Spiral Financing?? Death spiral financing is the result of a badly structured convertible financing used to fund primarily small cap companies in the marketplace, causing the company’s stock to fall dramatically, which can lead to the company’s ultimate downfall.
james1955
18/9/2019
18:17
Over the last 10 years the BOD have failed to deliver... the deposit is still as far underground today as it was back then... We still do not even have the road built to access the deposit... this is YEARS away from production.
james1955
18/9/2019
18:16
Terrible company. I suspect we are due another LOAN CONVERSION by Death Spiral Financer Riverfort.

Shareprice has fell 40% over the last 2 days...It will keep falling.

james1955
18/9/2019
17:29
I don't know. Would be good to know if a third party is connected somehow though.
nolosstillsell
18/9/2019
17:22
I don't know. Would be good to know if a third party is connected somehow though.
nolosstillsell
18/9/2019
17:03
Third consecutive day of share price collapse.

Little correction at end to reflect downward pressure and next placing before 31 October 2019.

Sub 2 pence tomorrow I'm afraid.

ebomber
18/9/2019
16:56
I am here buddy, what would you like me to ask them?
qui quaerit reperit
Chat Pages: Latest  2221  2220  2219  2218  2217  2216  2215  2214  2213  2212  2211  2210  Older

Your Recent History

Delayed Upgrade Clock