ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

ALBA Alba Mineral Resources Plc

0.055
0.00 (0.00%)
16 Jul 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Alba Mineral Resources Plc LSE:ALBA London Ordinary Share GB00B06KBB18 ORD 0.01P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.055 0.05 0.06 0.055 0.055 0.055 10,780,512 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Gold Ores 0 -116k 0.0000 N/A 4.26M

Alba Mineral Resources PLC Horse Hill Update (0353M)

12/09/2019 7:00am

UK Regulatory


Alba Mineral Resources (LSE:ALBA)
Historical Stock Chart


From Jul 2019 to Jul 2024

Click Here for more Alba Mineral Resources Charts.

TIDMALBA

RNS Number : 0353M

Alba Mineral Resources PLC

12 September 2019

Alba Mineral Resources plc

("Alba" or the "Company")

Horse Hill-1 and Horse Hill-2/2z drilling and testing update

Alba (LON: ALBA), the diversified mineral exploration and development company, announces that it has been informed by UK Oil & Gas Plc ("UKOG"), the majority owner of Horse Hill Developments Limited ("HHDL"), the operator of Horse Hill licences PEDL 137 and PEDL 246, containing the Horse Hill-1 ("HH-1") oil discovery, of the following:

- Final site works to accommodate the arrival of the rig to drill the new Horse Hill-2/2z ("HH-2/2z") Portland horizontal well commenced at 1200 hrs, Friday 30 August and were completed yesterday.

- Test production from the Horse Hill-1 ("HH-1") Kimmeridge oil pool was temporarily shut-in to permit oil storage tanks and flowlines to be relocated to enable safe simultaneous drilling and HH-1 testing operations. Kimmeridge test oil production has now resumed and will continue until the rig arrives, when a further short shut-in will occur to enable the HH-2/2z drilling set-up to be assembled.

- Prior to the current shut-in, Kimmeridge test production reached a total of 36,559 barrels ("bbl") of dry Brent quality crude at a final metered rate of 313 bbl of oil per day ("bopd") over the final 48-hour test period. Peak instantaneous rates of up to 374 bopd were recorded during this period. Total aggregate Portland and Kimmeridge test production now stands at a landmark 66,127 bbl. Kimmeridge production is planned to continue during the drilling campaign.

- Having signed the relevant drilling and service contracts, the rig is now scheduled to arrive later in September to commence drilling and coring the HH-2 vertical pilot hole, expected to be completed in around 30 days from start. The horizontal well section, HH-2z, with a planned trajectory of up to 1000m wholly within the Portland reservoir, will follow directly afterwards. Further operational updates will be issued in due course.

   -       Horse Hill 2018-19 Test Oil Production Milestones: 

o 66,127 bbl aggregate Kimmeridge and Portland oil production

o 36,559 bbl total Kimmeridge oil production

o 29,568 bbl total Portland production

o No discernible formation water produced from either reservoir

Alba has an 18.1% interest in HHDL, for an effective 11.765% interest in the Horse Hill oil field and surrounding PEDL137 and PEDL246 licences (together the "Horse Hill Project").

George Frangeskides, Alba's Executive Chairman, commented:

"We are pleased to report on the rapid operational progress that is being made at Horse Hill, which follows hot on the heels of yesterday's announcement of the grant of planning permission for long-term production, running for some 25 years. This puts the long-term future of the Horse Hill oil field on a very sure footing."

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

Qualified Person's Statement

Michael Nott, who has over 45 years' relevant experience in the geological, mining, minerals, waste disposal, industrial minerals, oil, drilling, mineral planning and quarrying industries, has approved the technical information in this announcement.

Mr Nott holds a BSc. degree in Geology from Queen Mary, University of London, a MSc. Degree in Mineral Production Management from the Royal School of Mines, Imperial College, University of London, The Diploma of Imperial College in Mineral Production Management and is a Chartered Engineer. He is a Fellow of the Institute of Materials, Minerals and Mining, a Fellow of the Minerals Engineering Society, a Fellow of the Institute of Quarrying and an Associate of the Royal School of Mines Association.

Glossary

flow test or well test: a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate.

horizontal well: a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon

oil field: an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface.

For further information, please contact:

Alba Mineral Resources plc

   George Frangeskides, Executive Chairman                        +44 20 3907 4297 

Cairn Financial Advisers LLP (Nomad)

   James Caithie / Liam Murray                                            +44 20 7213 0880 

First Equity Limited (Broker)

   Jason Robertson                                                             +44 20 7374 2212 

Yellow Jersey PR (Financial PR/ IR)

   Harriet Jackson / Henry Wilkinson                                    +44 77 1071 8649 

alba@yellowjerseypr.com

Alba's Project & Investment Portfolio

 
 Project (commodity)            Location     Ownership 
 Mining Projects 
 Amitsoq (graphite)             Greenland    90% 
                               -----------  ---------- 
 Clogau (gold)                  Wales        90% 
                               -----------  ---------- 
 Inglefield (copper, cobalt, 
  gold)                         Greenland    100% 
                               -----------  ---------- 
 Limerick (zinc-lead)           Ireland      100% 
                               -----------  ---------- 
 Melville Bay (iron ore)        Greenland    51% 
                               -----------  ---------- 
 TBS (ilmenite)                 Greenland    100% 
                               -----------  ---------- 
 Oil & Gas Investments 
 Brockham (oil)                 England      5% 
                               -----------  ---------- 
 Horse Hill (oil)               England      11.765% 
                               -----------  ---------- 
 

Web: www.albamineralresources.com

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

END

DRLSFDFMFFUSEEU

(END) Dow Jones Newswires

September 12, 2019 02:00 ET (06:00 GMT)

1 Year Alba Mineral Resources Chart

1 Year Alba Mineral Resources Chart

1 Month Alba Mineral Resources Chart

1 Month Alba Mineral Resources Chart