ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

ALBA Alba Mineral Resources Plc

0.0305
0.0015 (5.17%)
Last Updated: 08:00:00
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Alba Mineral Resources Plc LSE:ALBA London Ordinary Share GB00B06KBB18 ORD 0.01P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.0015 5.17% 0.0305 0.029 0.032 0.0305 0.0305 0.03 4,569,430 08:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Gold Ores 0 -116k 0.0000 N/A 2.82M
Alba Mineral Resources Plc is listed in the Gold Ores sector of the London Stock Exchange with ticker ALBA. The last closing price for Alba Mineral Resources was 0.03p. Over the last year, Alba Mineral Resources shares have traded in a share price range of 0.0285p to 0.1125p.

Alba Mineral Resources currently has 9,730,000,000 shares in issue. The market capitalisation of Alba Mineral Resources is £2.82 million.

Alba Mineral Resources Share Discussion Threads

Showing 25801 to 25815 of 26125 messages
Chat Pages: Latest  1033  1032  1031  1030  1029  1028  1027  1026  1025  1024  1023  1022  Older
DateSubjectAuthorDiscuss
31/10/2024
20:13
A half kilo of them or I think the last few will finally smell that rat...
honfacifi
31/10/2024
19:20
here's hoping they finally do.

I'm happy your being more positive just shows you care about Alba.

Well done Ryan 👍

thaibob1
31/10/2024
17:31
Big buckets of gold nuggets waiting to be made into Clogau gold coins.


Music to my ears.


Alba United 🇬🇧

thaibob1
31/10/2024
17:27
Sarn Helen got Welsh gold nuggets, amateurs got Welsh gold nuggets, gold panners got Welsh gold nuggets there have even been several at auction....

The only people in eight years who haven't found a nugget in Wales is Alba but here's hoping they finally do.

honfacifi
31/10/2024
15:49
We are not interested in Scotgold its Alba's thread.


Looking forward to the gold coins

That will shut the derampers up

thaibob1
31/10/2024
15:02
https://x.com/AlbaMinerals/status/1851993324787503387?t=hjb6yANxHqh-T2fnqrRc-g&s=19
birchin
31/10/2024
06:40
You have a answer for everything absolutely amazing, unfortunately all bull.
So negative about Alba because we are getting the gold and making some comeemdatry gold coins from our big fat nuggets

Soon it will be all over for you with your smear campaign,and we will all be laughing at you.

Gold is here and alba are here to stay.



Alba United 🇬🇧

thaibob1
30/10/2024
19:05
Talking of cowards he's not been on since 04.46 this morning.

I think he eventually realises Alba are very professional about getting that gold, well New Clogau gold coins coming soon.


Looking forward to seeing one.

thaibob1
30/10/2024
16:39
He won't join to much of a coward.
birchin
30/10/2024
13:31
Honfacifi what's your views on the above ?

I hope you can join then you can ask as many questions to the company that you want.

And you can't bully people.

thaibob1
30/10/2024
03:46
Honfacifi I enjoy your orange story better.

What's your problem writing at 04.46 in the morning,must be worrying.

I'm at work so not a problem for me writing while it's my break time.

Sounds like them Clogau gold coins are playing on your mind, well we all will be seeing the goods soon.

👍

thaibob1
30/10/2024
01:16
We can all see that your worried now Alba are going to get some gold coins made, I'm looking forward to seeing them and where the auction will be, also how much they sell for.
You must be excited for Alba to.

thaibob1
29/10/2024
15:49
Honfacifi is panicking with all the rubbish he's posting nothing but a deramper who's only here to try and do harm to Alba.

Your historic lie telling is all everyone needs to know about you,I see your sleeper accounts have woken up on the other Web site.
I'll remind you and everyone else what accounts you hold.
r1ck5-focus
cryptomantom
asllankukeli
tompretzle
bobrad
lee1978
crober33
Yes these accounts are you Honfacifi many people know this
Clearly shows the depths you will go to harm Alba,
Scotgold is a true reliable poster who's invested unlike you,just shows the desperation from you to try and call out a true informative investor.

You are a paid deramper and a worried one at that, well soon have gold coins for sale and I hope you buy one, if you do I'll give you a thumbs up 👍

thaibob1
29/10/2024
10:42
'Detonating explosives, such as TNT and dynamite, are characterized by extremely rapid decomposition and development of high pressure, whereas deflagrating explosives, such as black and smokeless powders, involve merely fast burning'

Your not really blasting just cracking rock, no wonder this is taking over three months.

Blasting set to recomence then they will update time line, so a small hole what four months, five then processing on top, how to string out six months but sure they will update the processing timeline soon maybe march 2025 to get assays back!

Yes they mentioned more assets lolol, couldn't write this if you tried it's so bad, no full recovery of gold just assays lolol

Raise incoming, always is when they go to the PR mill lolol

honfacifi
29/10/2024
07:59
.Clogau Operational Update

Alba Mineral Resources Plc (AIM: ALBA) is pleased to report on the progress of ongoing works at the Company's 100% owned Clogau-St David's Gold Mine in north Wales ("Clogau" or the "Mine").

Key Points

- Underground operations are ongoing at the Llechfraith Target, Alba's priority target at Clogau, with blasting having taken place at Levels 4.5 and 5. Newly blasted ore currently remains underground but will be removed to surface for sample processing and assaying.



- The volume of ore found in situ at Levels 4 and 5 from historic mining operations has greatly exceeded what was anticipated, leading to a significant ore extraction exercise being completed prior to blasting, involving some 25 tonnes. Although this has added to the Company's development timeline, it is considered overall positive as this additional ore will be processed for its gold content.



- Site visits completed by HM Inspectorate of Mines, part of the Health and Safety Executive ("HSE"), and Natural Resources Wales ("NRW"), with some further remedial works requested by HSE having since been completed.



- While these developments have pushed out the Company's timelines for the completion of bulk sampling at the Llechfraith Target, Alba now expects the next sequence of blasting to commence on Level 5 later this week. Following the completion of the next sequence, the Company expects to be able to provide an update on overall timings.



- Blasts undertaken to date have been successful and confirmed that the rocks at Clogau are amenable to blasting by low-impact deflagrating explosives, which is a major positive as the Company moves forward with the development of the Project.



- From the test gold production to date, the Company intends to auction a limited run of commemorative coins in the coming weeks. Further details will be announced in due course.

George Frangeskides, Executive Chairman, commented:

"Since our last update, we have completed a substantial amount of work underground. The need to clear out a large volume of residual ore, combined with additional remedial measures requested by the Mines Inspector, has pushed out our planned blasting timeline, however our mining team anticipate being able to recommence blasting on No.5 Level later this week.

"The blasting we have undertaken to date, both on 4.5 and 5 Levels, has been successful and confirmed the suitability of the deflagrating explosives we are currently using. This also gives us confidence that the blasting programme should be able to proceed efficiently from here.

"In related news, we have been working hard also on our plans for the commercialisation of gold produced from Clogau. We intend to release soon the details of a limited run of commemorative coins which are being produced from our test gold production to date."

Works Completed Since Last RNS

Since the last operational update RNS on 30 August 2024, the Company has completed the following works, among others:

Underground Works

Adit Level

- Concrete bed laid and winch installed at the Main Shaft.

- Main Shaft sheave wheel rehabilitated.

No.4 Level

- Sampling completed on No.4 Level.

- Old ladders stripped out of Sub Shaft and new ladderways installed from No.4 to 4.5 Level.

- Vent ducting installed from Drainage Level to No.4 Level fan.

- Electrical reticulation extended to No.4 Level for connection of fan and winch.

- Old pipes cut and removed on No.4 Level.

- Concrete laid for No.4 Level Sub Shaft winch bed and winch installed.

- Concrete laid for Sub Shaft station area.

- Roof bolts installed for sheave wheel at Sub Shaft.

- Pressure washing of walls.

- New Kubota KC70VHD-4 tracked loader delivered to No.4 Level in preparation for transport to No.5 Level.

No.4.5 Level

- Pressure washing of walls.

- Ladderway installed from 4.5 to 5 Level.

No.5 Level

- Back up pump installed on No.5 Level.

- Air line installed from Mine Yard compressor to No.5 Level.

- 25 tonnes of rock from previous periods of mining dug out from No. 5 Level and extracted to Llechfraith Mine Yard.

- Sump dug out on No.5 Level for siting of pump below floor level.

- Water supply fitted for drilling of blast holes.

- Pressure washing of walls.

- Drilling of blast holes and blasting on No.5 Level.



Pilot Processing Plant



- New sump installed in plant to create a closed water system.

- Tailing pipes and water supply reconfigured.

- New hammers fitted to the mill.

- Pump motor changed and extraction fan repaired on the primary crusher.

- On-going test processing of various ores.

Surface Works

- Cleared land access across the bridge from the Llechfraith Mine Yard to gain access to the historic explosives storage magazine.

- Bridge integrity inspection carried out by engineering consultant.

- Historic mine material cleaned from between the rails on surface for possible gold content.

- Fitted additional pipework on outflow side of the settlement tank.

- Fitted out a dry room in the Llechfraith Mine Shed for the use of personnel.

- PAT electrical testing completed, as well as upgrade of electricity supply from hydro plant.

- Removal of tailings to temporary storage zone.

- Reclaiming of rails for use on shaft doors.

Safety

- Additional anchor points fitted. All anchor points pull tested and registered.

- Fall arrests installed at all ladderways.

- Safety gates fitted at Main Shaft (Adit Level and No.4 Level).

- Pneumatic shaft doors installed on Main Shaft.

- Shaft doors and gates installed at Sub Shaft (No.4 Level).

- Underground signalling and telephone systems installed for Main Shaft.

Regulatory

- NRW and HSE site visits completed.



- Extension of European Protected Species Licence ("EPSL") applied for and granted, now valid for continuous underground operations until 30 September 2025

graylyn1
Chat Pages: Latest  1033  1032  1031  1030  1029  1028  1027  1026  1025  1024  1023  1022  Older

Your Recent History

Delayed Upgrade Clock