We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
TotalEnergies SE | EU:TTE | Euronext | Ordinary Share |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
-0.66 | -0.95% | 68.59 | 68.59 | 68.94 | 69.85 | 68.58 | 69.68 | 3,628,541 | 16:40:00 |
French oil major Total SA (TOT, FP.FR) Friday reiterated it was ready to start "in the coming days" an operation to "kill" a gas leaking well on its North Sea Elgin platform as it has managed to move a support drilling rig close to the platform.
The semi-submersible drilling rig called "West Phoenix" moved within the exclusion zone around the platform that has been evacuated and powered down since March 25, and stands ready to position itself directly alongside the complex, Total said in a statement.
West Phoenix will be the main support vessel during the planned well intervention and will be used to pump heavy mud into the G4 well to try to stop the leak, the group said.
The group is also planning to drill two relief wells simultaneously to the top kill operation and the drilling of the first back-up relief well is still progressing according to plan, Total said.
During the week, and thanks to more favorable weather, the group has been able to fly specialized crew to the platform eight times, during which temporary pipes to carry and pump heavy mud into the leaking well were installed, it said.
- By Geraldine Amiel, Dow Jones Newswires; +33 1 40171767; geraldine.amiel@dowjones.com
1 Year TotalEnergies Chart |
1 Month TotalEnergies Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions