ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

RMM Rambler Metals & Mining Plc

5.375
0.00 (0.00%)
25 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Rambler Metals & Mining Plc LSE:RMM London Ordinary Share GB00BLFJ1613 ORD 1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 5.375 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Rambler Metals & Mining PLC Q1/2017 Stub - Production Results (6297Q)

01/12/2016 7:00am

UK Regulatory


Rambler Metals & Mining (LSE:RMM)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Rambler Metals & Mining Charts.

TIDMRMM

RNS Number : 6297Q

Rambler Metals & Mining PLC

01 December 2016

1 December 2016

Three Month Ending October 31, 2016 - Production Results

London, England & Baie Verte, Newfoundland and Labrador, Canada - Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ('Rambler' or the 'Company'), a copper and gold producer operating in Newfoundland and Labrador, Canada, today provides an operational update for the first quarter ended 31 October 2016 ('Q1/17 Stub').

Summary for Q1/17 Stub: Ore, Concentrate and Saleable Metal Production

 
 PRODUCTION           Q1 Stub/17   CONCENTRATE       Q1 Stub/17 
                                    (Delivered 
                                    to Warehouse) 
 
 Dry Tonnes Milled        69,609   Copper (%)              26.4 
                                   Gold (g/t)              13.6 
 Copper Recovery 
  (%)                       96.5 
 Gold Recovery                     Dry Tonnes 
  (%)                       65.9    Produced              4,006 
 
 Copper Grade                      Saleable Copper 
  (%)                        1.7    Metal (t)             1,057 
                                   Saleable Gold 
 Gold Grade (g/t)            1.1    (oz)                  1,619 
-------------------  -----------  ----------------  ----------- 
 

(see Note 1 below)

Highlights OF the quarter:

-- Production of 4,006 tonnes of copper concentrate, representing a 2% decrease over Q4/16 resulting from a slightly lower copper head grade during the quarter.

-- Dry tonnes milled of 69,609 tonnes, equal to Q4/16 and a 20% increase over Q1/16, driven by an increase in production from the Lower Footwall Zone ('LFZ');

o 1,057 tonnes of saleable copper

(a 1% increase over Q4/16 and a 15% decrease over Q1/16)

o 1,619 ounces of saleable gold

(a 12% increase over Q4/16 and a 12% decrease over Q1/16)

-- Head grades of copper averaged 1.7% for the quarter (a 6% decrease over Q4/16); gold averaged 1.1 g/t (6% decrease over Q4/16). Grades for the 3 month period were in line with plan with the majority of LFZ ore now being sourced from either capital development or from the first post-pillar cut and fill ('PPCF') test stope outside of the known reserve. Once the LFZ is fully developed, ore will be primarily sourced from larger stopes.

Norman Williams, President and CEO, commented:

"Mill production for the period was comparable with last quarter which was a record for the Company. Grades and recovery for copper and gold were in line with our plan as development into the Lower Footwall Zone progressed. Over the coming months, the Company will continue its work to increase mill throughput to ensure that all existing infrastructure, at both the mine and mill, are fully optimized in conjunction with sustainable ore production from the LFZ."

Table 2 - Quarter over Quarter Results Comparison (see Note 1 below)

 
 PRODUCTION              Q1/16    Q1/17           Q4/16    Q1/17 
                                   Stub                     Stub 
                         (Aug,     (Aug,           (May,    (Aug, 
                          ,Sep,     Sep,            Jun,     Sep, 
                          Oct)      Oct)            Jul)     Oct) 
 
 Dry Tonnes Milled       58,053   69,609   20%    69,874   69,609   0% 
 
 Copper Recovery 
  (%)                      95.3     96.5   1%       94.7     96.5   2% 
 Gold Recovery 
  (%)                      70.6     65.9   -7%      62.6     65.9   5% 
 
 Copper Head 
  Grade (%)                 2.4      1.7   -29%      1.8      1.7   -6% 
 Gold Head Grade 
  (g/t)                     1.5      1.1   -25%      1.2      1.1   -6% 
---------------------  --------  -------         -------  ------- 
 
   CONCENTRATE 
   (Produced and Stored 
   in Warehouse) 
                                                 -------  ------- 
 Copper (%)                26.6     26.4   -1%      27.4     26.4   -4% 
 Gold (g/t)                12.9     12.6   -3%      12.4     12.6   1% 
 
 Dry Tonnes Produced      4,788    4,006   -16%    4,108    4,006   -2% 
 
 Saleable Copper 
  Metal (t)               1,238    1,057   -15%    1,044    1,057   1% 
 Saleable Gold 
  (oz)                    1,844    1,619   -12%    1,451    1,619   12% 
---------------------  --------  -------         -------  ------- 
 

Details of the Company's financial performance, including capital expenditure and operating costs, will be included in its Q1/17 stub financial results to be released on or before 22 December 2016. Following the change to a calendar year end, announced on 20 July 2016, the group will communicate calendar 2017 production guidance on or before the end of January 2017.

ABOUT RAMBLER METALS AND MINING

Rambler is a mining and development company that in November 2012 brought its first mine into commercial production. Rambler has a 100% ownership in the Ming Copper-Gold Mine, a fully operational base and precious metals processing facility and year round bulk storage and shipping facility; all located on the Baie Verte peninsula, Newfoundland and Labrador, Canada.

Rambler's immediate plans are to increase mine and mill production to 1,250 mtpd by the end of Fiscal 2017. This initial expansion has been fully funded through CEII's investment. Rambler will also continue advancing engineering studies on ore pre-concentration (DMS) and shaft rehabilitation with a view to further increase production to 2,000 mtpd at the Ming Mine. In addition, Rambler has initiated a detailed study at the mill with a goal to increase gold recovery and production rate in the copper concentrator.

Along with the Ming Mine, Rambler also owns 100% of the former producing Little Deer/ Whales Back copper mines and has strategic investment in the former producing Hammerdown gold mine.

Rambler is dual listed in London under AIM:RMM and in Canada under TSX-V:RAB.

For further information, please contact:

 
 Norman Williams,        Peter Mercer 
  CPA,CA                  Vice President, Corporate 
  President and CEO       Secretary 
  Rambler Metals &        Rambler Metals & Mining 
  Mining Plc              Plc 
  Tel No: 709-800-1929    Tel No: +44 (0) 20 
  Fax No: 709-800-1921    8652-2700 
                          Fax No: +44 (0) 20 
                          8652-2719 
 
   Nominated Advisor       Investor Relations 
   (NOMAD) 
  David Porter, Craig     Nicole Marchand Investor 
   Francis                 Relations 
   Cantor Fitzgerald       Tel No: 416- 428-3533 
   Europe                  Nicole@nm-ir.com 
   Tel No: +44 (0) 
   20 7894 7000 
 

Website: www.ramblermines.com

Larry Pilgrim, P.Geo., is the Qualified Person responsible for the technical content of this release and has reviewed and approved it accordingly. Mr. Pilgrim is an independent consultant contracted by Rambler Metals and Mining Canada Limited. Tonnes referenced are dry metric tonnes unless otherwise indicated.

Note 1: Results reported are accurate and reflective as of the date of release. The Company performs regular auditing and reconciliation reviews on its mining and milling processes as well as stockpile inventories, following which past results may be adjusted to reflect any changes.

Neither TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ('MAR'). Upon the publication of this announcement via Regulatory Information Service ('RIS'), this inside information is now considered to be in the public domain.

Caution Regarding Forward Looking Statements:

Certain information included in this press release, including information relating to future financial or operating performance and other statements that express the expectations of management or estimates of future performance constitute "forward-looking statements". Such forward-looking statements include, without limitation, statements regarding copper, gold and silver forecasts, the financial strength of the Company, estimates regarding timing of future development and production and statements concerning possible expansion opportunities for the Company. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief are based on assumptions made in good faith and believed to have a reasonable basis. Such assumptions include, without limitation, the price of and anticipated costs of recovery of, copper concentrate, gold and silver, the presence of and continuity of such minerals at modeled grades and values, the capacities of various machinery and equipment, the availability of personnel, machinery and equipment at estimated prices, mineral recovery rates, and others. However, forward-looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, interpretation and implications of drilling and geophysical results; estimates regarding timing of future capital expenditures and costs towards profitable commercial operations. Other factors that could cause actual results, developments or events to differ materially from those anticipated include, among others, increases/decreases in production; volatility in metals prices and demand; currency fluctuations; cash operating margins; cash operating cost per pound sold; costs per ton of ore; variances in ore grade or recovery rates from those assumed in mining plans; reserves and/or resources; the ability to successfully integrate acquired assets; operational risks inherent in mining or development activities and legislative factors relating to prices, taxes, royalties, land use, title and permits, importing and exporting of minerals and environmental protection.

Accordingly, undue reliance should not be placed on forward-looking statements and the forward-looking statements contained in this press release are expressly qualified in their entirety by this cautionary statement. The forward-looking statements contained herein are made as at the date hereof and the Company does not undertake any obligation to update publicly or revise any such forward-looking statements or any forward-looking statements contained in any other documents whether as a result of new information, future events or otherwise, except as required under applicable security law.

This information is provided by RNS

The company news service from the London Stock Exchange

END

DRLFDDESSFMSEIF

(END) Dow Jones Newswires

December 01, 2016 02:00 ET (07:00 GMT)

1 Year Rambler Metals & Mining Chart

1 Year Rambler Metals & Mining Chart

1 Month Rambler Metals & Mining Chart

1 Month Rambler Metals & Mining Chart

Your Recent History

Delayed Upgrade Clock