ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

PPG Plutus Powergen Plc

0.025
0.00 (0.00%)
Last Updated: 01:00:00
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Plutus Powergen Plc LSE:PPG London Ordinary Share GB00B1GDWB47 ORD 0.01P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.025 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Plutus PowerGen PLC Response to OFGEM Statement (2893Y)

02/03/2017 7:00am

UK Regulatory


Plutus Powergen (LSE:PPG)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Plutus Powergen Charts.

TIDMPPG

RNS Number : 2893Y

Plutus PowerGen PLC

02 March 2017

Plutus PowerGen Plc / Ticker: PPG / Index: AIM

2 March 2017

PLUTUS POWERGEN PLC ("PPG" or the "Company")

Response to OFGEM Statement

Plutus PowerGen Plc (AIM: PPG), the AIM listed power company focused on the development, construction and operation of flexible electricity and gas power generation in the UK, notes the statement from OFGEM that it is "minded to" cut TRIAD payments to local embedded generators.

The Board believes that the proposed modifications to the current system outlined by OFGEM could cause significant harm to the UK's industrial sector, and in turn consumers, as well as a wide range of distributed generators and energy storage developers. The Board supports National Grid's view that the proposed changes further threaten security of supply as necessary capacity is forced off or delayed. Accordingly, it believes the OFGEM proposals to be deeply flawed, narrowly focused and potentially very damaging to UK industry and investor confidence at a critical time. The Company looks forward to an active participation in the consultation process.

The Board welcomes the proposed wider review of the regulatory and market arrangements surrounding network charges (the Targeted Charging Review or 'TCR') also promised by OFGEM. The Board believes this work will result in a more cohesive assessment that recognises and values the benefits that flexible energy generation plays in the UK currently by delivering a critical supply of energy to combat the instability and volatility created by the increasing use of renewables; which by their very nature provide power intermittently to the National Grid.

PPG and its projects benefit from access to multiple revenue streams in addition to TRIAD, namely Short Term Operating Reserve (STOR) and Firm Frequency Response (FFR) as well as receipt of the prevailing power price at the time of generation. For PPG, the maiden profits recently reported in the Company's interim results were achieved via the receipt of management contracts for its projects before the commissioning of its Plymouth site, highlighting the continued scope for profit growth as it continues to add projects to its pipeline.

PPG CEO Phil Stephens said, "Network charging is a very complicated and an emotionally charged topic in the UK, which has dramatic knock-on effects across many sectors. Any decision to implement change should not be taken lightly, narrowly or suddenly, but must instead be careful, holistic and systematic. The statement from OFGEM indicates that it prefers to deliver a short-term response to a complicated, long-term issue.

"PPG's projects tap into a range of revenue streams which is testament to the strong requirement for the critical supply of energy we provide to the UK market, which is currently volatile and at risk of black and brown outs due to the ongoing reconfiguration of the UK power generation mix. The proposals provide very little recognition of this, instead narrowly focusing on the interests of large integrated energy companies. I believe this decision could cause significant harm to industrial manufacturers, many of which have embedded generation, which in turn could affect consumers and the UK's commercial competitiveness."

Until the consultation process and formal decisions have been announced, PPG will not be making further comment.

**ENDS**

For further information, please visit www.plutuspowergen.com, or contact:

 
 Charles Tatnall   Plutus PowerGen Plc   Tel: +44 (0) 
                                          20 3705 8350 
 Phil Stephens     Plutus PowerGen Plc   Tel: +44 (0) 
                                          20 3705 8352 
 Andrew Craig      Cantor Fitzgerald     Tel: +44 (0) 
                    Europe                20 7894 7000 
 Richard Salmond   Cantor Fitzgerald     Tel: +44 (0) 
                    Europe                20 7894 7000 
 Elisabeth         St Brides Partners    Tel: +44 (0) 
  Cowell            Limited               20 7236 1177 
 Grace-Anne        St Brides Partners    Tel: +44 (0) 
  Marius            Limited               20 7236 1177 
 

Notes to Editors

Plutus PowerGen Plc is an AIM listed company focused on the development, construction and operation of flexible stand-by power generation sites in the UK. At present, the market dynamics for flexible power generation are positive due to the continued downward pressure on capacity available to National Grid to balance supply and demand, leading to their announcements about possible power shortages over the next few years.

Flexible Power generators such as PPG offer a viable and timely solution to the power capacity shortfall in the UK. To this end, PPG is initially focusing on delivering 200MW of capacity by the end of 2017 and currently has a project pipeline of potential development sites with 700MW of power generation capacity.

PPG has a straightforward multi-revenue stream model with large and stable counter-parties and is using project/EIS funding through SPVs to finance construction of the generation assets. This structure has the benefit of limiting dilution to plc shareholders as the assets are financed and built.

This information is provided by RNS

The company news service from the London Stock Exchange

END

RSPBIGDXXXGBGRB

(END) Dow Jones Newswires

March 02, 2017 02:00 ET (07:00 GMT)

1 Year Plutus Powergen Chart

1 Year Plutus Powergen Chart

1 Month Plutus Powergen Chart

1 Month Plutus Powergen Chart

Your Recent History

Delayed Upgrade Clock