ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

BMR Bmr Group

1.90
0.00 (0.00%)
26 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Bmr Group LSE:BMR London Ordinary Share GB00BWV0F181 ORD GBP0.01
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 1.90 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

BMR Mining to Construct Operational Plant on Own Land at Kabwe

16/10/2015 3:00pm

Dow Jones News


BMR Mining (LSE:BMR)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more BMR Mining Charts.

LONDON--BMR Mining PLC (BMR.LN) said Friday that it has decided to construct the operational plant on the Company's own land at Kabwe, adding that it won't be proceeding with the leasing of land and equipment from Sable Zinc Kabwe Ltd.

Following a review of operations by the Company at Kabwe, BMR has now determined that the location of the initial Pilot Plant should be secured for the medium term and also under the Company's direct control.

Last month, Glencore PLC (GLEN.LN) agreed to lease land and equipment in Zambia held by its Sable Zinc Kabwe unit to BMR so the latter can build a proposed pilot plant adjacent to its tailings dump.

Whilst the Board is continuing to finalize the specification and costing of the operational plant, it does not believe that this decision will have a material adverse impact thereon, BMR said Friday.

"This decision reflects our focus on constructing a fully operational pilot plant that is capable of generating revenues for the Company," Chairman Alex Borrelli said.

 

--Alex MacDonald contributed to this article

 

-Write to Razak Musah Baba at razak.baba@wsj.com; Twitter: @Raztweet

 

Subscribe to WSJ: http://online.wsj.com?mod=djnwires


(END) Dow Jones Newswires

October 16, 2015 09:45 ET (13:45 GMT)

Copyright (c) 2015 Dow Jones & Company, Inc.

1 Year BMR Mining Chart

1 Year BMR Mining Chart

1 Month BMR Mining Chart

1 Month BMR Mining Chart

Your Recent History

Delayed Upgrade Clock