We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Uk Oil & Gas Plc | LSE:UKOG | London | Ordinary Share | GB00BS3D4G58 | ORD GBP0.000001 |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.0015 | 6.25% | 0.0255 | 0.024 | 0.027 | 0.0255 | 0.02275 | 0.024 | 51,927,596 | 09:47:29 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
Finance Services | 1.78M | -4.87M | -0.0015 | -0.20 | 976.2k |
TIDMUKOG
RNS Number : 3467H
UK Oil & Gas Investments PLC
07 June 2017
UK Oil & Gas Investments PLC
("UKOG" or the "Company")
Drilling Update at 100% Owned Broadford Bridge-1 Kimmeridge Exploration Well
PEDL234 Licence, Weald Basin, UK
UK Oil & Gas Investments PLC (London AIM and NEX: UKOG) announces that 133/8 inch steel casing was set and cemented successfully over the 855 feet thick Weald Clay section on its 100% interest Broadford Bridge-1 ("BB-1") Kimmeridge Limestone exploration well. Directional drilling operations, within 12 1/4 diameter hole, commenced on Monday evening. BB-1 has now reached a depth of over 370 metres (1200 feet) below surface within the Lower Cretaceous Hastings Beds. The uppermost Kimmeridge Limestone target, KL4, is expected to be conventionally cored in around 10-12 days' time. The well remains on schedule and within budget.
About BB-1
BB-1 is located near Billingshurst, West Sussex, within the 300 km(2) PEDL234 licence, in which the Company has a 100% interest via its ownership of the licence's operator, Kimmeridge Oil & Gas Limited. The well, an exploration step-out, is designed to penetrate four naturally fractured Kimmeridge Limestone units (KL1-KL4), the uppermost two units of which flowed at record rates in the Company's Horse Hill-1 discovery near Gatwick Airport.
The well is designed to drill through the target limestones at an inclination of around 50 degrees to vertical and at approximately 90 degrees to the predicted orientation of open natural fractures in the reservoir. The planned overall horizontal deviation of the well is approximately 1 km to the north-northeast of the well site. The Kimmeridge Limestones are expected to be encountered at a drilled depth of approximately 1300-1700 metres, which equates to around 950-1200 metres vertically below surface.
Qualified Person's Statement
Stephen Sanderson, UKOG's Executive Chairman, who has over 35 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Sanderson is a Fellow of the Geological Society of London and is an active member of the American Association of Petroleum Geologists.
For further information, please contact:
UK Oil & Gas Investments PLC
Stephen Sanderson / Kiran Morzaria Tel: 01483 243450
WH Ireland (Nominated Adviser and Broker)
James Joyce / James Bavister Tel: 020 7220 1666
Cenkos Securities PLC (Joint Broker)
Nick Tulloch / Neil McDonald Tel: 0131 220 6939
Square 1 Consulting (Public Relations)
Brian Alexander / David Bick Tel: 01483 243450 / 020 7929 5599
Glossary:
casing heavy gauge steel tubing designed to line the wall of a well. The casing provides a safe controlled space in which the drill pipe and bit can operate in isolation from conditions in overlying rock units. The steel tubing is bonded to the surrounding rock by impermeable concrete, known as "cement". --------------- ------------------------------------------ core or coring a drilling technique that involves using a doughnut-shaped drilling bit to capture or "cut" a continuous cylinder-shaped core of undamaged in-situ rock. The core is captured in a steel pipe or "core barrel" above the bit. Core is normally cut in 30 feet lengths, or multiples of 30 feet, and normally with a diameter of 3.5 or 4 inches. Core is taken in petroleum reservoir rocks for detailed laboratory analyses of petrophysical and geomechanical parameters. --------------- ------------------------------------------ discovery a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons --------------- ------------------------------------------ electric logs tools used within the wellbore to measure the rock and fluid properties of surrounding rock formations --------------- ------------------------------------------ limestone a sedimentary rock predominantly composed of calcite (a crystalline mineral form of calcium carbonate) of organic, chemical or detrital origin. Minor amounts of dolomite, chert and clay are common in limestones. Chalk is a form of fine-grained limestone --------------- ------------------------------------------ naturally a fractured reservoir contains fractured open and usually connected cracks reservoir or fissures within the rock matrix; fractures can enhance permeability of rocks greatly by connecting pore-spaces together; naturally fractured reservoirs have been created over geological time by nature, not man-made via hydraulic fracturing --------------- ------------------------------------------ step-out well a well specifically designed to determine the lateral extent of a discovered hydrocarbon accumulation or play. --------------- ------------------------------------------
UKOG Licence Interests
The Company has interests in the following ten UK licences:
Asset Licence UKOG's Licence Holder Operator Area (km(2) ) Status Interest ---------------- --------- --------------- --------------- --------------- -------------- ---------------------- UKOG (GB) IGas Energy Field in stable Avington (1) PEDL070 5% Limited Plc 18.3 production ---------------- --------- --------------- --------------- --------------- -------------- ---------------------- Baxters Copse PEDL233 50% UKOG Weald IGas Energy 89.6 Appraisal/development (2) Limited Plc well planned; licence extended to 2018 ---------------- --------- --------------- --------------- --------------- -------------- ---------------------- Kimmeridge Oil Kimmeridge Oil Broadford Bridge & Gas Limited & Gas Limited BB-1 drilling (3) PEDL234 100% (4) (4) 300.0 underway ---------------- --------- --------------- --------------- --------------- -------------- ---------------------- Holmwood (3) PEDL143 30% UKOG Europa Oil & 91.8 Holmwood-1 Gas (Holdings) exploration well plc planned in 2017 ---------------- --------- --------------- --------------- --------------- -------------- ---------------------- UKOG (GB) IGas Energy Field in stable Horndean (1) PL211 10% Limited Plc 27.3 production ---------------- --------- --------------- --------------- --------------- -------------- ---------------------- Horse Hill (5) PEDL137 31.2% Horse Hill Horse Hill 99.3 Submitted planning Developments Developments application for long Ltd Ltd term production tests and drilling of two wells ---------------- --------- --------------- --------------- --------------- -------------- ---------------------- Horse Hill Horse Hill Developments Developments Horse Hill (5) PEDL246 31.2% Ltd Ltd 43.6 As above ---------------- --------- --------------- --------------- --------------- -------------- ---------------------- Isle of Wight UKOG Solent UKOG Solent Preparing drilling (Offshore) (3) P1916 100% Limited Limited 46.7 planning submission ---------------- Isle of Wight (Onshore) (2, Preparing drilling 3) PEDL331 65% UKOG TBA 200.0 planning submission
---------------- --------- --------------- --------------- --------------- -------------- ---------------------- Markwells Wood PEDL126 100% UKOG (GB) UKOG (GB) 11.2 Submitted planning (2) Limited Limited application for appraisal and field development ---------------- --------- --------------- --------------- --------------- -------------- ----------------------
Notes:
1. Oil field currently in production.
2. Oil discovery pending development and/or appraisal drilling.
3. Exploration asset with drillable prospects and leads. Contains the extension of the Godley Bridge Portland gas discovery and the site of the forthcoming Broadford Bridge-1 well.
4. UKOG has a 100% interest in Kimmeridge Oil & Gas Limited, which has a 100% interest in PEDL234.
5. Oil discovery with recently completed flow testing.
6. UKOG has a direct 48% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.
This information is provided by RNS
The company news service from the London Stock Exchange
END
MSCBRGDLCUGBGRL
(END) Dow Jones Newswires
June 07, 2017 02:00 ET (06:00 GMT)
1 Year Uk Oil & Gas Chart |
1 Month Uk Oil & Gas Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions