We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Sirius Petroleum Plc | LSE:SRSP | London | Ordinary Share | GB00B03VVN93 | ORD 0.25P |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 0.40 | - | 0.00 | 01:00:00 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
0 | 0 | N/A | 0 |
Date | Subject | Author | Discuss |
---|---|---|---|
17/2/2017 14:29 | All they did was open the spread.easier to put the large trades through as "dont knows". | bronislav | |
17/2/2017 12:12 | nothing like a bums rush on Friday to get the juices flowing | solarno lopez | |
17/2/2017 12:11 | You and others. Fair bit of share price action with 1m flurries. News imminent or is it shareshufflers playing their games? | dr rosso | |
17/2/2017 12:10 | Someone keen buying 8 million in batches late reported as usual. | aventador | |
17/2/2017 12:05 | Stocking up today me. | siriusly | |
17/2/2017 10:50 | SSSH-WING!! | jenny tulwought | |
17/2/2017 10:50 | This is what they've said will be installed. A surface wellhead, low cost, minimum facilities platform. Subsea platforms are used in deep water. I dare say some kind of extensive subsea infrastructure has been slotted into place, esp if Ororo is the hub. O2 drill the next piece in the jigsaw? B&R, care to elaborate what you mean by "structure"? Do you mean a kind of network that extends beyond Ororo? Is O a hub? Linked to Isan et al? " A subsea production structure, O wellhead platform (CSP), multi-slot template it use flowline connections tied in" | dr rosso | |
17/2/2017 10:22 | Many people don't know that Nigeria's Population has increased by 40m in the last ten years, and that rate of increase looks set to continue. They'll soon have over 200m souls desperate for energy! | donald trumpton | |
17/2/2017 10:17 | Satellite images would put that one to bed either way. As far as I'm concerned, oil is the less interesting aspect of our possible operations when you consider that Nigeria is desperate for gas right now. | sherl0ck | |
17/2/2017 09:59 | Htrocka...there are two scenarios. 1.there are operations and production platforms at ororo as per website . 2 there are no operations and production pltforms at ororo. If its no2 then why state there is on your website...it matters not how old that website is. | bronislav | |
17/2/2017 09:47 | donald trumpton - 17 Feb 2017 - 09:07 - 60966 of 60970 - 0Who's desperate? Only a gambler like you.Gambler ? Iv been here since the start nearly ten years hardly a gamble but yes I'm desperate to see an end to all this and see my money back with a profit ASAP after all these years as I'm sure a lot of other long term holders are.Let's hope there promise of oil by h1 actually materialises this year as the years previous they haven't. | aventador | |
17/2/2017 09:29 | Bronislav.. that website has been up and running for at least 4 years. It implies that Owena Oil and Gas, the State vehicle, has a subsidiary, OwenaOil, through which it carries out its work programme....below is the contact email address...try your luck and see if you get a response. Owena has operations and production platforms at"ORORO" oil field. Black or red...question..what are your thoughts on the above statement taken from the owena oil and gas website. | htrocka2 | |
17/2/2017 09:23 | Black_or_red, sounds very the like DrRosso's scenario.Ororo hub. | drrichard | |
17/2/2017 09:21 | Thank you and good morning | solarno lopez | |
17/2/2017 09:13 | Surprised nobody worked it out yet. A subsea production structure, O wellhead platform (CSP), multi-slot template it use flowline connections tied in to other fields nearby. C can't, so use O as a miniblock. Yes, O2 wellbore itself for to be drilled but will be very fast to produce its own 10k+ from multi-wells lateral and deep. But most important is a linked structure, rov to max, full details in cprs. Complex op. Why do you think are Chinese friends work with Schumberger? Funding is for all of it expanded in offshore blocks. No delay just hard work putting every thing together and there you have it, good morning. | black_or_red | |
17/2/2017 09:07 | Who's desperate? Only a gambler like you. | donald trumpton | |
17/2/2017 07:09 | They said they didn't want to issue the full 1.7 b if they could avoid to it's there as a back up they had the same amount last year and didn't, if they did want to fund raise it would be at higher levels that's more beneficial, clearly another big allotment has to be allowed for the final partner and then the jigsaw should be complete and no more games and secrecy and we will see the big re rate we so desperately need. | aventador | |
17/2/2017 06:51 | hxxp://opstatic.com/ A ROV in action | solarno lopez | |
17/2/2017 06:34 | Owena has operations and production platforms at"ORORO" oil field. Black or red...question..what are your thoughts on the above statement taken from the owena oil and gas website. | bronislav | |
16/2/2017 22:47 | Slot in the platform. Simple subsea hook-up, very quick drill first oil. No worry | black_or_red | |
16/2/2017 22:19 | Those 1.7 billion will be chipped away at ,the final tranche will be held back until everything is water tight.Only then will they be switched.Safety has always been kept as the priority .Perhaps why they didnt issue all the shares that they had shareholder approval for last year. They were there to issue just in case. | bronislav | |
16/2/2017 21:20 | deadly.. ...that's an excellent point and the obvious answer is 'yes'.... however, in any case, the company have to be careful not to issue 1.2bn shares to a single entity or concert party, as this would trigger the 30% rule whereby the holder would be obliged to make a cash offer for the rest of the shares at the highest price during the previous twelve months. 'could they even be needed to fend off a possible hostile takeover at some point??? The bottom line...yes, eventually they'll be utilised, probably as part of the end game or even within the proposed JOA, but their current purpose is to act as a defence mechanism against unwelcome, hostile predators. drr... 'Only 6 weeks to April..'(very conveniently close to the 2017-2018 ISA date) | htrocka2 | |
16/2/2017 20:53 | What you hinting at BorR? | minichris | |
16/2/2017 20:37 | Good posts, black_or_Red, as usual. In your last paragraph you say that subsea plant will be in place. Lots of other stuff to do. If we back calculate from oil in June, or gas, or whatever, we can then factor in a drill time, before that the placement and hook up to these subsea bits of kit, before that the drill has to arrive. 6-10 weeks? Perhaps 12. Say early April? From this end we have the AD to sign off, the EGM to arrange and enact, the relisting to arrange. Phew. Only 6 weeks to April. Things ought to start happening soon and there is still time. I reckon, anyway. Thoughts anybody? | drrichard | |
16/2/2017 19:26 | For example:: Aquaterra Energy’s conductor supported platform (Sea Swift) allows marginal fields to be developed quickly, using just the jack-up and supply vessel needed to drill the wells to install a complete platform. Sea Swift (conductor supported platforms) Sea Swift offers all the benefits of a platform, coupled to the rig based installation of a subsea development. Doing this, the widely used, field proven technology helps our customers to achieve reduced platform costs, lower installation costs, simplified critical path and reduced intervention costs within shallow water developments. Sea Swift offers operators different development options, increasing overall development flexibility. It opens up opportunities for accelerated first oil and removes the scheduling barriers inherent in developments requiring multiple installation vessel types. It has become a key ingredient in minimising field development costs. The Sea Swift wellhead tower provides an easy solution for adding new slots to existing platforms or enabling wells to be drilled and completed before the arrival of a larger platform for new developments. It is a low cost option that is delivered significantly faster than traditional platforms and can rapidly increase production from platforms constrained by existing slots. It also offers the ultimate application for pre-drilling template operations, enabling wells to be drilled, completed, with dry trees installed, before the arrival of the main processing platform. This allows pipelines to be laid and tied-in before platform delivery and its simple hook-up method enables oil and gas production to begin as soon as the platform is delivered, eliminating the need for rig and construction vessel’s intervention. This is a very large, complex operation involving several contracters. It is not too much a surprise it becomes long and dawn out. However do not worry if the rig has not arrived, first oil from drilling can come very quick as subsea installations will all be in place. Using the well conductors to support a simple wellhead platform is an elegant way of limiting the costs of oilfield development in shallower water, especially if you can install the entire structure from a drilling rig and without any special heavy-lift vessels. | black_or_red |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions