ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

SBLM Sable Mining

0.202
0.00 (0.00%)
Last Updated: 00:00:00
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Sable Mining LSE:SBLM London Ordinary Share VGG7762V1076 ORD NPV (DI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.202 0.00 00:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Sable Mining Africa Limited Metallurgical Results at Nimba Iron Ore Project (3957U)

29/07/2015 7:03am

UK Regulatory


Sable Mining (LSE:SBLM)
Historical Stock Chart


From Nov 2019 to Nov 2024

Click Here for more Sable Mining Charts.

TIDMSBLM

RNS Number : 3957U

Sable Mining Africa Limited

29 July 2015

Sable Mining Africa Ltd / Index: AIM / Epic: SBLM / Sector: Natural Resources

29 July 2015

Sable Mining Africa Ltd ('Sable Mining' or 'the Company')

Metallurgical Results at Nimba Iron Ore Project

Sable Mining, the AIM listed iron exploration and development company, is pleased to announce positive results from metallurgical test work conducted at the Plateau 2 area of the 205.2 million tonnes ('Mt') Nimba Iron Ore Project in Guinea ('Nimba' or the 'Project').

Highlights

-- Detailed mine scheduling shows a life of mine of more than 20 years, and highlighted the ability to sustain production of both high quality premium grade lump and fines products at Nimba over the initial 10 years life of mine exclusively from the Plateau 2 area:

o Lump product grades of 63.33% iron ('Fe')

o Fines product grades of 62.11% Fe

   --     A third medium grade fines product is being considered with grades of 58.58% Fe returned 

-- Mechanical and thermal properties of the proposed premium lump product expected to further enhance price premiums and marketability of product - the rate and degree of reduction from iron oxide to iron and the porosity of the lump product are considered excellent, positively impacting blast furnace productivity and direct feed suitability respectively

-- Easily fragmented rock identified (UCS averaging 20Mpa and CWI averaging 3kWh/t), which will allow for high crushing rates at low power consumption - positively impacting operational and capital expenditure

-- Testing to determine the sinter characteristics of the fines product is ongoing with initial tests performing to expectation - results due September 2015

-- Further metallurgical test work is underway to progress marketing studies for the end product

   --     Additional upside available from Plateau 3 and the larger, un-drilled Plateau 1 

Sable Mining CEO Andrew Groves said, "These metallurgical results underpin the quality of our Nimba iron ore product and the potential commercial viability of the Project. With grades of 63% and 62% Fe returned from our lump and fines product respectively, Nimba is able to sustain the production of both high quality premium grade lump and fines products over an initial ten year life of mine exclusively from Plateau 2. Importantly, this appears to be achievable via relatively low cost crush and screen methods, positively impacting the already compelling economics of the Project. Furthermore, as Plateau 2 is one of three plateaux within our licence area, there remains significant further upside opportunity, the development of which could potentially be funded from revenues generated at Plateau 2, positively impacting the Project's capital requirements. Our focus will now be on further defining the end product quality grade, so that we can begin to assess export opportunities into markets such as Europe and China."

Tables 1 and 2 compare the planned average lump and fines product grades with BHP Billiton's ('BHPB') Newman High grade (NHG) and MAC products (2012 specifications). A third medium grade fines product is also being considered as presented in Table 3.

Table 1: Scheduled Lump Product Grades (Years 1 to 10)

 
                     Sable Nimba (Years 
                           1 -10)         NHG   MAC 
------------------  -------------------  -----  ----- 
 Fe %                             63.33   63.6   62.4 
------------------  -------------------  -----  ----- 
 Aluminium ('Al') 
  %                                2.09    1.4    1.3 
------------------  -------------------  -----  ----- 
 Silicon ('Si') 
  %                                1.68    4.0    3.1 
------------------  -------------------  -----  ----- 
 Phosphorus ('P') 
  %                                0.07   0.07   0.07 
------------------  -------------------  -----  ----- 
 

Table 2: Scheduled Fines Product Grades (Years 1 to 10)

 
                     Sable Nimba (Years 
                            1 -10)                     NHG    MAC 
------  --------------------------------------------  -----  ----- 
 Fe %                                          62.11   62.7     61 
------  --------------------------------------------  -----  ----- 
 Al %                                           2.69    2.3    2.2 
------  --------------------------------------------  -----  ----- 
 Si %                                           3.70    4.3    4.0 
------  --------------------------------------------  -----  ----- 
 P %                                            0.08   0.08   0.08 
------  --------------------------------------------  -----  ----- 
 

Table 3: Scheduled Medium Grade Fines Product Grades (Years 1 to 10)

 
         Sable Nimba (Years 
               1 -10) 
------  ------------------- 
 Fe %                 58.58 
------  ------------------- 
 Al %                  5.43 
------  ------------------- 
 Si %                  4.54 
------  ------------------- 
 P %                   0.08 
------  ------------------- 
 

Testing to determine the sinter characteristics of the fines product is ongoing. The results are due in September 2015 with initial tests performing to expectation. Further metallurgical test work is ongoing to progress marketing studies for the end product, based on 16 HQ and 26 PQ drill holes' core.

Tests to fully characterise both the mechanical and thermal properties of the proposed premium lump product have been completed by the Commonwealth Scientific and Industrial Research Organisation ('CSIRO') in Australia and are summarised in Table 4. These results are based on composite samples representing the initial ten years of planned production. Again, such parameters are compared with the BHPB (2012 specification) for their Newman High Grade and MAC products.

Table 4 - Mechanical and Thermal Properties Years 1 -10 Lump Product

 
         Parameter              Sable Nimba (1       NHG   MAC   Test Standard 
                              - 10 yr) composites) 
--------------------------  ----------------------  ----  ----  -------------- 
 Tumble Index (TI) % + 
  6.3mm                                       81.4    85    86        ISO 3271 
--------------------------  ----------------------  ----  ----  -------------- 
 Abrasion Index (AI) % 
  - 0.5 mm                                    11.5    10     9        ISO 3271 
--------------------------  ----------------------  ----  ----  -------------- 
 Reduction Disintegration 
  Test (RDI) % - 2.8 mm                       26.2    26    23      ISO 4696-2 
--------------------------  ----------------------  ----  ----  -------------- 
 Reducibility Index (RI) 
  %                                             71    56    60        ISO 7215 
--------------------------  ----------------------  ----  ----  -------------- 
 Decrepitation Index (DI) 
  % -6.3mm                                     1.8     6     5        ISO 8371 
 
 

Whilst the TI and AI data advise that the lump product has marginally greater susceptibility to disintegration to smaller particles when compared to the BHPB products, as a result of general attrition caused by product handling, loading, screening etc., the RI data (indicating the rate and degree of reduction from iron oxide to iron), resulting from the high porosity which facilitates access of the reducing gas to the interior of the lump products, is considered excellent. This positively impacts blast furnace productivity. The porosity also has a positive impact on the DI data (resistance to thermal shock), permitting ready evacuation of heated gases, suggesting the material is suitable for direct feed to a blast furnace. When considering general "value in use" parameters as part of the ultimate marketing of Sable's Nimba products, it is expected that such properties will further (in addition to product grade) enhance expected price premiums and marketability.

The information in this announcement that relates to Metallurgical Test Work has been reviewed by Jasbir Khosa, a qualified metallurgist and processing engineer employed by Xstract Mining Consultants. Jasbir Khosa has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a qualified person as defined by the AIM Note for Mining and Oil & Gas Companies.

** ENDS **

For further information please visit www.sablemining.com or contact:

 
 Andrew Groves        Sable Mining Africa        Tel: 020 7408 
                       Ltd                        9200 
 David Foreman        Cantor Fitzgerald Europe   Tel: 020 7894 
                                                  7000 
 Stewart Dickson      Cantor Fitzgerald Europe   Tel: 020 7894 
                                                  7000 
 Richard Greenfield   GMP Securities             Tel: 020 7647 
                                                  2836 
 Hugo de Salis        St Brides Partners Ltd     Tel: 020 7236 
                                                  1177 
 Charlotte Heap       St Brides Partners Ltd     Tel: 020 7236 
                                                  1177 
 

This information is provided by RNS

The company news service from the London Stock Exchange

END

DRLDMGZNKLRGKZG

1 Year Sable Mining Chart

1 Year Sable Mining Chart

1 Month Sable Mining Chart

1 Month Sable Mining Chart

Your Recent History

Delayed Upgrade Clock