ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

POLY Polymetal International Plc

215.00
0.00 (0.00%)
26 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Polymetal International Plc LSE:POLY London Ordinary Share JE00B6T5S470 ORD NPV
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 215.00 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Polymetal: Q2 2022 production results (1402539)

21/07/2022 7:00am

UK Regulatory


Polymetal International plc (POLY) Polymetal: Q2 2022 production results 21-Jul-2022 / 09:00 MSK Dissemination of a Regulatory Announcement, transmitted by EQS Group. The issuer is solely responsible for the content of this announcement.

-----------------------------------------------------------------------------------------------------------------------

 
Release time  IMMEDIATE                                                 LSE, MOEX, AIX: POLY / ADR: AUCOY 
Date          21 July 2022 Polymetal International plc Q2 2022 production results 

Polymetal reports solid production results for the second quarter of 2022.

"In Q2, we hit our production targets and are on track to meet our full-year guidance. International sanctions against Russia continue to have a material impact on sales, procurement and logistics. The management is fully focused on maintaining operating and financial stability of the Company", said Vitaly Nesis, Group CEO of Polymetal.

HIGHLIGHTS

-- No fatal accidents occurred among Group workforce and contractors in Q2 2022. During this period, twominor LTI incidents were recorded among employees. Lost time injury frequency rate (LTIFR) for the six-month perioddecreased by 53% year-on-year (y-o-y) to 0.08 (0.17 in H1 2021).

-- Q2 gold equivalent production ("GE") decreased by 9% year-on-year to 326 Koz. Lower grades and plannedlong maintenance shutdown at the Amursk POX reduced output from Kyzyl and Albazino, more than offsetting freshcontribution from Nezhda.

-- GE output for H1 was 697 Koz, down by 7% y-o-y, including 453 Koz in Russia and 244 Koz in Kazakhstan.?OVID-related restrictions in China forced the Company to reduce shipments of gold concentrates from Nezhda andKyzyl. The Company reiterates its full-year production guidance of 1.7 Moz of GE (1.2 Moz in Russia and 500 Koz inKazakhstan), however notes a risk of underperformance given persistent lockdowns and logistical constraints inChinese ports and railway.

-- In Q2, 130 Koz of GE in gold and silver bullion inventory accumulated across the Group's Russian mines.This gap between sales and production is likely to be closed during Q3 as the Company ramps up export sales tovarious Asian markets.

-- Revenue for the quarter recorded a 36% decline y-o-y to USUSD 433 million, while H1 revenue was down by 18%to USUSD 1,048 million (USUSD 605 million Russia and USUSD 443 million Kazakhstan). The negative dynamics was the resultof lower sales volumes on the back of inventory accumulation, while the average realized price was marginallyhigher.

-- Net debt as of the end of Q2 stood at approximately USUSD 2.8 billion. A quarterly increase of USUSD 0.8billion was driven by bullion and concentrate inventory accumulation, accelerated purchases of equipment andspares, funding of the critically important contractors and suppliers, and upward USUSD re-valuation ofruble-denominated debt driven by significant Rouble strengthening during the quarter. The Company maintainssufficient liquidity with USUSD 0.5 billion in cash and USUSD 0.4 billion of undrawn credit lines with non-sanctionedbanks.

-- Given significant appreciation of Ruble against US Dollar, the Company will update its FY2022 cash costsand CAPEX guidance with the publication of its H1 2022 financial results on 22 September 2022.

OPERATING HIGHLIGHTS

                                 3 months ended June 
                                30,                                         6 months ended June 30, 
                                                        % change1                                   % change1 
                                2022        2021                            2022        2021 
 
Waste mined, Mt                 55.0        52.5        +5%                 110.0       98.0        +12% 
Underground development, km     25.1        23.3        +8%                 48.9        46.3        +6% 
Ore mined, Mt                   5.1         3.8         +37%                9.4         7.5         +26% 
Open-pit                        4.1         2.8         +47%                7.4         5.6         +33% 
Underground                     1.0         0.9         +7%                 2.0         1.9         +5% 
Ore processed, Mt               4.3         4.0         +8%                 8.4         7.6         +11% 
Average GE grade processed, g/t 3.3         3.7         -9%                 3.4         3.8         -11% 
Production 
Gold, Koz                       271         299         -9%                 587         635         -8% 
Silver, Moz                     4.3         4.8         -10%                8.8         9.4         -6% 
Gold equivalent, Koz2           326         359         -9%                 697         753         -7% 
Sales 
Gold, Koz                       189         315         -40%                456         595         -23% 
Silver, Moz                     4.4         4.3         +3%                 8.7         8.0         +9% 
Revenue, USUSDm3                  433         681         -36%                1,048       1,274       -18% 
Net debt, USUSDm4                 2,801       1,978       +42%                2,801       1,647       +70% 
 
LTIFR (Employees)5              0.06        0.10        -40%                0.08        0.17        -53% 
Fatalities                      0           0           NA                  0           0           NA 
Notes: (1) % changes can be different from zero even when absolute numbers are unchanged because of rounding. Likewise, 
% changes can be equal to zero when absolute numbers differ due to the same reason. This note applies to all tables in 
this release. 
 (2) Based on 80:1 Au/Ag conversion ratio and excluding base metals. Comparative data for 2021 restated accordingly 
(120:1 Au/Ag conversion ratio was used previously). 
(3) Calculated based on the unaudited consolidated management accounts. 
(4) Non-IFRS measure based on unaudited consolidated management accounts. Comparative information is presented for 31 
March 2022 (for the three months period) and 31 December 2021 (for the six months period). 
(5) LTIFR = lost time injury frequency rate per 200,000 hours worked. 
6) DIS - days lost due to work-related injuries. 

PRODUCTION BY MINE

                 3 months ended June 30,  %      6 months ended June 30, % 
                2022         2021         change 2022        2021        change 
 
GOLD EQ. (KOZ)1 
Kazakhstan      105          144          -27%   244         293         -17% 
Kyzyl           53           93           -43%   135         182         -26% 
Varvara         52           51           +3%    109         110         -1% 
Russia          220          215          +3%    453         460         -2% 
Dukat           61           68           -11%   127         135         -6% 
Albazino        39           46           -15%   95          123         -23% 
Omolon          45           51           -12%   85          98          -14% 
Nezhda          31           -            NA     61          -           NA 
Svetloye        24           26           -8%    43          53          -19% 
Voro            19           19           +2%    39          41          -4% 
Mayskoye        1            4            -68%   4           10          -60% 
TOTAL           326          359          -9%    697         753         -7% 

Notes: (1) Based on 80:1 Au/Ag conversion ratio and excluding base metals. Comparative data for 2021 restated accordingly 120:1 Au/Ag conversion ratio was used).

CONFERENCE CALL AND WEBCAST

The Company will hold a conference call and webcast on Thursday, 21 July 2022 at 11:00 London time (13:00 Moscow time).

To participate in the call, please dial:

From the UK:

+44 (0) 330 165 4012 (local access)

0800 279 6877 (toll free)

From the US:

+1 646 828 8073 (local access)

800 289 0720 (toll free)

From Russia:

+7 495 646 5137 (local access)

8 10 800 2865 5011 (toll free)

To participate from other countries, please dial any of the local access numbers listed above.

Conference code: 1493984

To participate in the webcast follow the link: https://www.webcast-eqs.com/polymetal20220721.

Please be prepared to introduce yourself to the moderator or register.

A recording of the call will be available at +44 (0) 20 3859 5407 (from the UK), +1 719 457 0820 (from the USA) and 8 10 800 2702 1012 (from Russia), access code 1493984, from 15:30 London time Thursday, 21 July, till 15:30 London time Thursday, 28 July 2022. Webcast replay will be available on Polymetal's website (www.polymetalinternational.com) and at https://www.webcast-eqs.com/polymetal20220721.

Enquiries

Investor Relations 
Polymetal        ir@polymetalinternational.com 
Evgeny Monakhov  +44 20 7887 1475 (UK) 
Timofey Kulakov 
Kirill Kuznetsov +7 812 334 3666 (Russia) 

Forward-looking statements

This release may include statements that are, or may be deemed to be, "forward-looking statements". These forward-looking statements speak only as at the date of this release. These forward-looking statements can be identified by the use of forward-looking terminology, including the words "targets", "believes", "expects", "aims", "intends", "will", "may", "anticipates", "would", "could" or "should" or similar expressions or, in each case their negative or other variations or by discussion of strategies, plans, objectives, goals, future events or intentions. These forward-looking statements all include matters that are not historical facts. By their nature, such forward-looking statements involve known and unknown risks, uncertainties and other important factors beyond the company's control that could cause the actual results, performance or achievements of the company to be materially different from future results, performance or achievements expressed or implied by such forward-looking statements. Such forward-looking statements are based on numerous assumptions regarding the company's present and future business strategies and the environment in which the company will operate in the future. Forward-looking statements are not guarantees of

future performance. There are many factors that could cause the company's actual results, performance or achievements to differ materially from those expressed in such forward-looking statements. The company expressly disclaims any obligation or undertaking to disseminate any updates or revisions to any forward-looking statements contained herein to reflect any change in the company's expectations with regard thereto or any change in events, conditions or circumstances on which any such statements are based.

KYZYL

                             3 months ended June 30,           6 months ended June 30, 
                                                      % change                         % change 
                            2022         2021                  2022        2021 
MINING 
Waste mined, Mt             21.0         20.6         +2%      41.7        40.9        +2% 
Ore mined (open-pit), Kt    547          542          +1%      1,131       1,098       +3% 
 
PROCESSING 
Ore processed, Kt           535          569          -6%      1,086       1,133       -4% 
Gold grade, g/t             4.8          6.5          -26%     4.8         6.2         -23% 
Gold recovery               89.0%        89.9%        -1%      88.3%       89.4%       -1% 
Concentrate produced, Kt    24.5         34.2         -28%     49.3        69.3        -29% 
Concentrate gold grade, g/t 94.5         97.0         -3%      93.0        90.9        +2% 
Gold in concentrate, Koz1   75           107          -30%     148         202         -27% 
 
Concentrate shipped, Kt     15           21           -27%     26          48          -45% 
Payable gold shipped, Koz   28           40           -29%     48          86          -44% 
 
Amursk POX 
Concentrate processed, Kt   7            13           -47%     21          25          -18% 
Gold grade, g/t             131.2        130.8        +0%      132.1       133.9       -1% 
Gold recovery               94.0%        90.2%        +4%      94.4%       91.3%       +3% 
Gold produced, Koz          25           53           -54%     87          96          -10% 
 
TOTAL PRODUCTION 
Gold, Koz                   53           93           -43%     135         182         -26% 

Note: (1) For information only; not considered as gold produced and therefore not reflected in the table representing total production. It will be included in total production upon shipment to off-taker or dore production at Amursk POX.

(2) To be further processed at Amursk POX.

In Q2, gold in concentrate production at Kyzyl contracted by 30% mostly due to the planned decline in grade as mining shifted to the eastern part of the pit.

Concentrate inventory continued to accumulate due to the Amursk POX shutdown and COVID-related logistical restrictions in China.

Recovery rate at POX grew by 4% y-o-y due to improvements in the flowsheet implemented during the maintenance shutdown (addition of conditioning slurry tanks).

VARVARA

                                3 months ended June 30,           6 months ended June 30, 
                                                         % change                         % change 
                               2022         2021                  2022        2021 
MINING 
Waste mined, Mt                10.3         10.0         +3%      21.3        19.5        +9% 
Ore mined, Kt                  1,113        850          +31%     2,070       1,906       +9% 
 
PROCESSING 
Leaching 
Ore processed, Kt              829          794          +4%      1,598       1,558       +3% 
Gold grade, g/t                1.6          1.7          -2%      1.7         1.7         -0% 
Gold recovery1                 91.1%        89.9%        +1%      90.3%       88.2%       +2% 
Gold production (in dore), Koz 41           38           +8%      87          84          +3% 
 
Flotation 
Ore processed, Kt              192          185          +4%      371         375         -1% 
Gold grade, g/t                2.8          2.8          -2%      2.8         2.7         +4% 
Recovery1                      88.4%        83.9%        +5%      89.0%       84.3%       +6% 
Gold in concentrate, Koz       11           12           -14%     22          26          -14% 
 
 
TOTAL PRODUCTION 
Gold, Koz                      52           51           +3%      109         110         -1% 

Note: (1) Technological recovery, includes gold and copper within work-in-progress inventory. Does not include toll-treated ore.

Gold output at Varvara was largely stable y-o-y and exceeded the production plan.

Grade processed at the flotation circuit remained high on the back of prevailing share of better quality third-party ore. Gold recovery at the leaching circuit grew following the flowsheet improvements.

Ore mined increase is driven by the start of mining at the River pit.

At Varvara, a pilot rail-veyor project (the first one implemented in Eurasia) was commissioned to transport incoming ore from the railway spur to the crusher, thus reducing the greenhouse gas emissions and ore transportation cost.

Varvara Mine Supply Chain has become the first company in Kazakhstan (and third in Polymetal) which was certified in full compliance under the International Cyanide Management Code by the International Cyanide Management Institute (ICMI).

DUKAT

                             3 months ended June 30,           6 months ended June 30, 
                                                      % change                         % change 
                            2022         2021                  2022        2021 
MINING 
Waste mined, Mt             1.0          0.7          +53%     1.9         1.1         +79% 
Underground development, km 12.0         11.1         +8%      23.5        22.8        +3% 
Ore mined, Kt               601          638          -6%      1,234       1,283       -4% 
    Open-pit                109          119          -9%      215         223         -4% 
    Underground             492          518          -5%      1,019       1,060       -4% 
 
PROCESSING 
Omsukchan concentrator 
Ore processed, Kt           506          508          -1%      1,021       1,021       -0% 
Grade 
Gold, g/t                   0.5          0.6          -14%     0.6         0.5         +12% 
Silver, g/t                 231          257          -10%     240         255         -6% 
Recovery1 
Gold                        83.5%        87.1%        -4%      83.6%       85.3%       -2% 
Silver                      85.4%        87.6%        -3%      85.1%       87.2%       -2% 
Production 
Gold, Koz                   6            8            -18%     15          14          +9% 
Silver, Moz                 3.1          3.6          -14%     6.5         7.1         -9% 
 
Lunnoye plant 
Ore processed, Kt           117          122          -4%      232         237         -2% 
Grade 
Gold, g/t                   2.0          1.6          +24%     2.0         1.6         +26% 
Silver, g/t                 201          219          -8%      193         235         -18% 
Recovery1 
Gold                        90.5%        90.0%        +1%      91.0%       90.8%       +0% 
Silver                      93.1%        93.2%        -0%      92.9%       92.6%       +0% 
Production 
Gold, Koz                   7            6            +24%     13          11          +25% 
Silver, Moz                 0.7          0.8          -12%     1.4         1.6         -18% 
 
TOTAL PRODUCTION 
Gold, Koz                   13           13           -1%      29          25          +16% 
Silver, Moz                 3.8          4.4          -13%     7.8         8.8         -11% 

Notes: (1) Technological recovery, includes gold and silver within work-in-progress inventory.

Dukat H1 production was above the plan as throughput and grade exceeded the budget.

Waste mined increase in H1 is attributable to the mining of crown pillars at the Dukat open pit.

At Primorskoye, the Company is stockpiling crushed ore with shipments to customers expected to commence in August.

ALBAZINO

                             3 months ended June 30,           6 months ended June 30, 
                                                      % change                         % change 
                            2022         2021                  2022        2021 
MINING 
Waste mined, Mt             7.1          5.6          +27%     14.3        10.7        +34% 
Underground development, km 5.0          3.9          +27%     9.5         7.1         +33% 
Ore mined, Kt               1,065        455          +134%    1,837       949         +94% 
Open-pit                    855          268          +219%    1,424       576         +147% 
Underground                 211          187          +13%      413        373         +11% 
 
PROCESSING 
Albazino concentrator 
Ore processed, Kt           454          444          +2%      907         871         +4% 
Gold grade, g/t             3.2          4.0          -20%     3.2         4.1         -22% 
Gold recovery1              86.2%        88.4%        -2%      86.5%       88.6%       -2% 
Concentrate produced, Kt    32.8         33.7         -3%      65.1        66.5        -2% 
Concentrate gold grade, g/t 38.6         46.7         -17%     38.8        48.1        -19% 
Gold in concentrate, Koz2   41           51           -20%     81          103         -21% 
 
Amursk POX 
Concentrate processed, Kt   24           34           -29%     68          82          -18% 
Gold grade, g/t             39.5         47.1         -16%     42.6        50.4        -16% 
Gold recovery               93.5%        96.3%        -3%      95.4%       96.4%       -1% 
Gold produced, Koz          39           46           -15%     95          123         -23% 
 
TOTAL PRODUCTION 
Gold, Koz                   39           46           -15%     95          123         -23% 

Notes: (1) To concentrate.

(2) For information only; not considered as gold produced and therefore not reflected in the table representing total production. Included in total production after Dore production at the Amursk POX.

Mining at the largest high-grade Anfisa open pit has been completed at Albazino. Depletion of Anfisa is the main driver behind the planned production decline at the mine this year.

Volume of Albazino concentrate processed at Amursk POX decreased due to the long maintenance shutdown.

Waste and ore mining volumes in H1 were higher, driven by Farida pit (Albazino) and Kutyn development. Underground development advanced due to ramping-up of Ekaterina and Anfisa underground mines.

At Kutyn, ore crushing commenced. The project completion rate reached 90%. Start-up is scheduled for Q3 2022.

AMURSK POX

                           3 months ended June 30,           6 months ended June 30, 
                                                    % change                         % change 
                          2022         2021                  2022        2021 
Concentrate processed, Kt 33           50           -34%     91          110         -17% 
  Albazino                23           33           -30%     66          77          -14% 
  Kyzyl                   7            13           -47%     21          25          -18% 
  Nezhda                  2            -            NA       3           -           NA 
  Mayskoye                -            2            -100%    0           3           -92% 
  Veduga                  -            -            NA       -           4           -100% 
  Other1                  1            1            +10%     1           1           +10% 
Gold recovery             94.8%        93.0%        +2%      95.2%       94.0%       +1% 
Average gold grade, g/t   59.1         69.8         -15%     62.8        69.7        -10% 
Average sulphur grade     16.3%        14.1%        +16%     14.5%       13.8%       +6% 
Total gold produced2, Koz 64           103          -39%     184         224         -18% 
  Albazino                39           45           -14%     95          112         -16% 
  Kyzyl                   25           53           -54%     87          96          -10% 
  Mayskoye                -            4            -100%    2           5           -70% 
  Nezhda                  -            -            NA       1           -           NA 
  Veduga                  -            -            NA       -           9           -100% 
  Other1                  0            1            -93%     0           1           -89% 

Notes: (1) Purchased concentrates which are included in reportable production in the Albazino segment.

(2) For information only. Already accounted for in production at operating mines.

POX production was down y-o-y due to the long maintenance shutdown (40 days) for the scheduled relining of the autoclave. OMOLON

                             3 months ended June 30,           6 months ended June 30, 
                                                      % change                         % change 
                            2022         2021                  2022        2021 
MINING 
Waste mined, Mt             2.2          1.3          +79%     4.0         1.6         +157% 
Underground development, Km 2.8          3.0          -5%      5.9         5.7         +4% 
Ore mined, Kt               110          113          -2%      214         186         +15% 
    Open-pit                -            34           -100%    -           34          -100% 
    Underground             110          78           +40%     214         151         +42% 
 
PROCESSING 
Kubaka Mill 
Ore processed, Kt           213          217          -2%      426         429         -1% 
Grade 
Gold, g/t                   6.3          6.5          -3%      6.0         6.7         -10% 
Silver, g/t                 21           64           -67%     23          44          -48% 
Recovery1 
Gold                        94.3%        95.0%        -1%      93.6%       93.9%       -0% 
Silver                      76.6%        81.0%        -5%      76.2%       79.5%       -4% 
Gold production, Koz        40           43           -8%      76          88          -13% 
Silver production, Moz      0.1          0.3          -66%     0.2         0.5         -48% 
 
Birkachan Heap Leach 
Ore stacked, Kt             151          308          -51%     151         353         -57% 
Gold grade, g/t             1.0          1.3          -18%     1.0         1.2         -16% 
Gold production, Koz        4            4            -2%      5           4           +18% 
 
TOTAL PRODUCTION 
Gold, Koz                   43           47           -8%      82          93          -12% 
Silver, Moz                 0.1          0.3          -64%     0.2         0.5         -47% 

Note: (1) Technological recovery, includes gold and silver within work-in-progress inventory.

At Omolon, Kubaka mill recorded a planned decline in gold grade and production. In 2022, the plant processes lower-grade silver ore, Merrill-Crowe circuit remains idle, hence silver production is also down.

At the heap leach facility, Q2 stacking volumes decreased due to rehandling of the previously stacked ore. Grade was lower according to the mine plan - depletion of the Birckachan heap leach ore reserves.

Underground development commenced at Burgali underground, first ore is expected to be delivered in H2 2023. Open-pit ore mining at the deposit will recommence in Q3 2022, currently stripping is in progress.

The 2.5 MWh solar power plant reached planned capacity and now generates 20% of the required electricity for Kubaka mill. NEZHDA

                                  3 months ended June 30,          6 months ended June 30, 
                                                          % change                         % change 
                                 2022          2021                2022          2021 
MINING 
Waste mined, Mt                  5.1           5.6        -10%     10.0          11.0      -9% 
Ore mined, Kt                    720           365        +98%     1324          710       +86% 
 
PROCESSING 
Ore processed, Kt                491           -          NA       976           -         NA 
Grade 
Gold, g/t                        3.6           -          NA       3.6           -         NA 
Silver, g/t                      40.8          -          NA       35.7          -         NA 
Recovery1 
Gold                             72.2%         -          NA       72.7%         -         NA 
Silver                           77.8%         -          NA       76.5%         -         NA 
Gold in concentrate, Koz         41            -          NA       83            -         NA 
Silver in concentrate, Moz       0.5           -          NA       0.9           -         NA 
 
Concentrate shipped, Kt          6             -          NA       7             -         NA 
Payable gold in concentrate, Koz 27            -          NA       52            -         NA 
 
Amursk POX 
Concentrate processed, Kt        2             -          NA       3             -         NA 
Gold grade, g/t                  40.7          -          NA       40.2          -         NA 
Gold recovery                    90.3%         -          NA       89.5%         -         NA 
Gold produced, Koz               -             -          NA       1             -         NA 
 
TOTAL PRODUCTION1 
Gold, Koz                        27            -          NA       53            -         NA 
Silver, Moz                      0.3           -          NA       0.6           -         NA 

Notes: (1) Includes concentrate produced and stockpiled for future sale, and excludes low-grade material. Expected 90% gold payable ratio is applied.

At Nezhda, the majority of the production volume came from the payable gold in concentrate. Amursk POX continued to process trial batches of concentrate to study its technological parameters before processing at the future POX-2 plant.

The 110-kV line linking Nezhda mine to the regional grid, powered by the combination of hydro and gas, has been successfully commissioned. Previously operating diesel-powered gensets have been transferred to stand-by emergency mode. SVETLOYE

                          3 months ended June 30,           6 months ended June 30, 
                                                   % change                         % change 
                         2022         2021                  2022        2021 
MINING 
Waste mined, Mt          1.5          1.1          +41%     3.2         1.8         +80% 
Ore mined (open pit), Kt 638          536          +19%     1,007       926         +9% 
 
PROCESSING 
Ore stacked, Kt          356          366          -3%      668         648         +3% 
Gold grade, g/t          2.2          2.8          -23%     2.0         3.7         -45% 
Gold recovery            80.8%        80.8%        -        80.8%       81.5%       -1% 
Gold production, Koz     24           26           -8%      43          53          -19% 
 
TOTAL PRODUCTION 
Gold, Koz                24           26           -8%      43          53          -19% 

H1 gold production contracted y-o-y on the back of stacking of stockpiled lower-grade ore from the depleted Lyudmila main pit. However, q-o-q grade dynamics has normalized after a sharp decline in Q1.

Ore mining advanced after the Company increased the velocity of mining decline in the open pit by addition of the reserve excavator and engaging with a mining contractor.

VORO

                      3 months ended June 30,           6 months ended June 30, 
                                               % change                         % change 
                     2022         2021                  2022        2021 
MINING 
Waste mined, Mt      3.1          3.0          +3%      6.5         3.6         +80% 
Ore mined, Kt        105          57           +83%     180         62          +191% 
 
PROCESSING 
CIP 
Ore processed, Kt    254          262          -3%      500         522         -4% 
Gold grade, g/t      2.3          1.9          +23%     2.2         2.0         +9% 
Gold recovery1       84.6%        84.6%        -0%      85.1%       84.2%       +1% 
Gold production, Koz 17           16           +3%      35          36          -3% 
 
Heap Leach 
Ore stacked, Kt      -            -            NA       -           -           NA 
Gold grade, g/t      -            -            NA                   -           NA 
Gold production, Koz 0.9          1.7          -48%     1.5         3.7         -59% 
 
TOTAL PRODUCTION 
Gold, Koz            19           18           +3%      38          40          -5% 

Note: (1) Technological recovery, includes gold within work-in-progress inventory.

At Voro, quarterly production saw a y-o-y increase driven by higher volumes of third-party high-grade material in the feed.

Voro flotation plant construction is 80% complete. Start-up is targeted for Q1 2023.

MAYSKOYE

                                                   3 months ended June 30,           6 months ended June 
                                                                            % change 30,                    % change 
                                                  2022         2021                  2022       2021 
MINING 
Waste mined, Mt                                   1.0          1.0          -2%      2.0        2.0         +3% 
Underground development, km                       5.3          4.7          +12%     10.0       9.8         +2% 
Ore mined, Kt                                     234          197          +19%     429        388         +11% 
Open-pit                                          42           38           +8%      54         51          +6% 
Underground                                       192          158          +21%     375        336         +11% 
 
PROCESSING 
Ore processed, Kt                                 229          218          +5%      459        435         +6% 
Gold grade, g/t                                   5.5          5.7          -4%      5.6        6.0         -7% 
Gold recovery1                                    91.8%        92.0%        -0%      91.3%      92.3%       -1% 
Gold in concentrate, Koz2                         37           37           +1%      75         77          -3% 
 
Amursk POX 
Gold produced in dore from concentrate (POX), Koz -            4.2          -100%    1.6        5.2         -70% 
Gold produced in dore from carbon, Koz3           1.3          -            NA       2.5        4.9         -49% 
 
TOTAL PRODUCTION 
Gold, Koz                                         1            4            -68%     4          10          -60% 

Notes: (1) To concentrate.

(2) For information only; not considered as gold produced and therefore not reflected in the table representing total production. Included in total production upon sale to off-taker or dore production at Amursk POX.

(3) Gold produced from carbon at Amursk POX.

At Mayskoye, Q2 gold in concentrate production was broadly stable y-o-y.

An underground ore conveyor was successfully commissioned and entered the ram-up period. The USUSD 30 million project is expected to cut costs (AISC by up to USUSD 150/oz) and reduce GHG emissions. Importantly, it frees up the substantial fleet of underground trucks that can be used to support other mines in the absence of sanctions-related fleet replacement.

POX-2

At POX-2, installation of concentrates pulp blending vessels, intensive cyanidation reactor and slurry cooling section was complete. Thickener installation continues. The plant start-up is expected Q2 2024 according to the revised schedule.

SUSTAINABILITY, HEALTH AND SAFETY

There were no fatal accidents among Polymetal's employees and contractors during the first half of the year (consistent with H1 2021). Lost time injury frequency rate (LTIFR) among the Group's employees decreased by 40% y-o-y to 0.08 for the quarter (0.10 in Q2 2021) and by 53% to 0.08 in H1 (0.17 in H1 2021). In Q2 2022, two incidents resulting in lost-time injuries occurred among Polymetal employees and five among contractors' workers, all of the injuries were classified as minor. The incidents were followed by proper investigations aimed at improving safety of workplaces.

Following the latest review by Vigeo Eiris, a global leader in ESG assessments, data, research and analytics, Polymetal's ESG overall score has been updated to 67/100 (69/100 in 2021), corresponding to the Advanced level of performance and placing Polymetal on the 2nd place among 41 industry peers.

-----------------------------------------------------------------------------------------------------------------------

ISIN:           JE00B6T5S470 
Category Code:  UPD 
TIDM:           POLY 
LEI Code:       213800JKJ5HJWYS4GR61 
OAM Categories: 3.1. Additional regulated information required to be disclosed under the laws of a Member State 
Sequence No.:   176115 
EQS News ID:    1402539 
 
End of Announcement  EQS News Service 
=------------------------------------------------------------------------------------
 

Image link: https://eqs-cockpit.com/cgi-bin/fncls.ssp?fn=show_t_gif&application_id=1402539&application_name=news

 

(END) Dow Jones Newswires

July 21, 2022 02:00 ET (06:00 GMT)

1 Year Polymetal Chart

1 Year Polymetal Chart

1 Month Polymetal Chart

1 Month Polymetal Chart

Your Recent History

Delayed Upgrade Clock