ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

MSMN Mosman Oil And Gas Limited

0.018
0.0015 (9.09%)
26 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Mosman Oil And Gas Limited LSE:MSMN London Ordinary Share AU0000XINET1 ORD NPV (DI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.0015 9.09% 0.018 0.017 0.019 0.0185 0.017 0.02 327,269,130 13:08:56
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Crude Petroleum & Natural Gs 2.25M -2.13M -0.0005 -0.40 801.84k
Mosman Oil And Gas Limited is listed in the Crude Petroleum & Natural Gs sector of the London Stock Exchange with ticker MSMN. The last closing price for Mosman Oil And Gas was 0.02p. Over the last year, Mosman Oil And Gas shares have traded in a share price range of 0.0105p to 0.0925p.

Mosman Oil And Gas currently has 4,009,195,586 shares in issue. The market capitalisation of Mosman Oil And Gas is £801,839 . Mosman Oil And Gas has a price to earnings ratio (PE ratio) of -0.40.

Mosman Oil And Gas Share Discussion Threads

Showing 18601 to 18618 of 24400 messages
Chat Pages: Latest  748  747  746  745  744  743  742  741  740  739  738  737  Older
DateSubjectAuthorDiscuss
31/7/2019
08:24
138% increase

Production Summary

Gross production for the six months ending 30 June 2019 was 37,811 boe and the Net Production attributable to Mosman was 11,742 boe.

Gross production for the year ending 30 June 2019 was 55,508 boe and the Net Production attributable to Mosman was 18,216 boe.

Compared to the six-month period ended 31 December 2018 Net Production attributable to Mosman increased 81%.

Additionally, Net Production attributable to Mosman for the year ended 30 June 2019 increased 138% from the previous year.

The results reflect both the increase in the number of producing wells and continued increases in production rates at the projects that Mosman has ownership in.

spary1
31/7/2019
08:20
https://twitter.com/laptop1515/status/1156461886550003715?s=19
laptop15
31/7/2019
08:19
https://twitter.com/laptop1515/status/1156296242131034113?s=19
laptop15
25/7/2019
11:38
Interesting that they are having discussions, one sniff from the Dukas well and I think we will be off for a JV 😎😜.

Mosman continues to pursue farm-in discussions on EP 145 with potential joint venture partners in order to help fund the current and ongoing work program.

spary1
24/7/2019
16:52
How much was 100km of 2D seismic going to cost again? ;-)
bulgarian
24/7/2019
13:33
Give it a rest Kevarian, because as we all know it’s a multiple zone well, Stanley 1 has gone up in volume as the well settles, can easily be the same for Stanley 2 or they can add to production from another zone, key is its more oil than we were getting so moving forward as a company no matter what carp you come out with 😉
spary1
24/7/2019
12:46
An RNS that might not cause much damage. Alas, this is how mozzie RNSs are meaasured these days by people with brains. Overall it's another underwhelming RNS but offers a tiny bit of hope for the future. Far better than the bad news about the seriously under-achieving wells recently which resulted in a deserved share price drop. Actually, it's done well to NOT fall much further after those disappointing figures.
kevjones2
24/7/2019
12:15
Nice update farmin will go really well here
shanur90
24/7/2019
12:08
RNS

The Company is progressing the EP 145 current work program of 100km of 2D seismic surveys, seismic processing and interpretation and well planning. A specialist company, Synterra Technologies Pty. Ltd ("Synterra") was contracted some months ago to undertake the work with Mosman staff and Synterra completing field visits to assess the terrain and logistical requirements for the seismic survey. Mosman is currently working closely with Synterra to finalise several submissions to obtain approvals required prior to proceeding with the acquisition of the seismic data.



In the interim financial statements for the six months ended 31 December 2018, Mosman highlighted that the permit had an anniversary date of 21 August 2019 by which time the current work program is required to be completed. The permit will automatically proceed in to the fourth year of the five-year term on 21 August 2019.

spary1
24/7/2019
09:39
Yep great news shanur, should be about 2 weeks then wireline logging which is very quick so hopefully an update is very quick to follow :)
spary1
24/7/2019
09:10
Drilling issues resolved in Dukas now.
shanur90
23/7/2019
19:05
Spoken like the true multi ID poster & buffoon you really are.
bulgarian
23/7/2019
16:33
who cares? Kev Jones will be able to answer that one tho.

What is more relevant is what the share price is doing where it is.

bulgarian
23/7/2019
15:26
I couldn't give a toss about your conspiracy garbage.

I do consider your recent PR campaign ramping the Stanley 2 prods update / Dukas to be another glaring balls-up.

which will have even more down on paper.

How you and your boiler room brothers sleep at night is a mystery.

bulgarian
23/7/2019
14:33
Kevarian... choose life
carla1
23/7/2019
14:23
Kev Jones will no doubt be along in his own time to call you out once again cretin.

cowardly deviant lying cretin at that.

bulgarian
23/7/2019
13:26
Bulgarian here is another then, we all know how LSE displays the amount of post on this new version and if post are removed that number doesn’t go down, so it says post no 5 and if you count the post there are 5 now Kev Jones ID says I have had my posts removed today, so does that make him a lying deviant then 🤔 going to be an interesting answer, do you call your other ID a liar or don’t you 😉
spary1
23/7/2019
13:16
DUKAS UPDATE
As previously announced on 12 July, the Dukas 1 well had successfully completed wireline logging from 2604m measured depth (MD) to 3515m MD. Subsequent to that announcement, Santos, as Operator of EP112, advised Central that the Dukas-1 well had encountered mechanical issues which necessitated a pause in planned drilling activities. Those mechanical issues related to a stuck liner hanger and initial attempts to rectify the issue required specialist tools and expertise. It was unclear at that time how long the issue would take to resolve and if ultimately drilling activity would be substantially deferred.Central has now been advised that the 8 5/8” liner hanger, liner hanging running tool and liner have been successfully fished from the hole and a wiper trip is in progress. The current forward plan is to drill ahead to total depth in the current 9 1⁄2” hole.
-ends-

spary1
Chat Pages: Latest  748  747  746  745  744  743  742  741  740  739  738  737  Older

Your Recent History

Delayed Upgrade Clock